ISO 14001 : 2004 General Information
( 1 ) Unlike MS ISO 9001, MS ISO 14001 is NOT department specific. It is an additional to
9001.
( 2 ) EMS member ( steering committee )
EMR : Andy Wong
Deputy EMR : Arul ThasanDCC : Lim Pee Ling
LEGAL : Vivien Kuang
WASTE : Jim Lee
HR : Robert Yong
SAFETY : Teh Sock Hun
PURCHASING : Lim Ling Ling
MAINTENANCE : Yau Lee Kiat
( 3 ) Certification : June 06.
( 4 ) CB : SGS
( 5 ) Cannot transport already "used chemical" from Toli to store or other locations for fear of
spillage along the way. If new drum, never mind.
( 6 ) First Aid box - cannot be empty. If locked, who keep the key in case of emergency?.
eg. PIC : Andy
Arul
( 7 ) EM & EOP copies
DCC - 1 set master copy
EMR ------------------------> 1 set
Committee member ----> 1 set
( 7 ) IMPORTANT !!! FOR SGS, THEY DO THE ADEQUACY & STAGE 1 TOGETHER. BE
PREPARED !!! .
-
7/27/2019 Iso 14001 General Information and Action Directives
2/47
ISO 14001 : 2004 ACTION STATUS AREA : DCC / EMR-DEMR / LEGAL / WASTE MGT / HR / SAFETY / PURCHASIN
No
1. Establish Environment Policy
Env policy - frameup and hang on wall
Environment Policy at guard house ( available to public )
EMS contact number at guard house
Suppliers, subcontractor, contractor safety letter at guard house.
Suppliers, subcontractor, contractor safety letter+env policy. ( signed )
Env policy for all customers.
Sand bath for cigarette at canteen.
Gather all subcontractors, contractors for training.
Clear the clogged public drain. ( Auditors check internal drain )
Letter to raw material supplier ( Customer's RoHS requirement )
Fill in Form Master List ( Env. forms )
Install sand filter at canteen's drain. Prohibited pouring oil into drain.
Replace fire hose reel at back of factory.
Promotional campaign to save electricity, water.
Work Instruction - spillage, treatment, how to clean in containment.
Buy ear plug - must have spare. ( conie NRR 21dB )-awaiting report
Set up ERS reject area. ( at warehouse )
Set up ERS Non Compliance area ( at warehouse )
Use printing label for ERS / RoHS compliance
PROPER ALLOCATION OF CHEMICAL STORAGE AREA
PROPER ALLOCATION OF WASTE STORAGE AREA.
Cleaning of machine and spill of oil on floor.
Containment for HCL + acoustic soda.
Labeling of secondary container.
Display noise exposure limit ( info )
Display Emergency Contact Number
No
14/4/06 14/4/06
Item / Description Plan Actual PIC
Item / Description Plan Actual PIC
Andy Wong
Lim P L
Lim P L
Arul Thasan
Robert Yong
Robert Yong
Lim L L
Lim P L
Lim P L
Andy Wong
Andy Wong
Robert Yong
Andy Wong
Andy Wong
Lim P L
Robert Yong
Robert Yong
Arul Thasan
Yau Lee Kiat, Jim
Yau Lee Kiat
Arul Thasan
Lim P L
Andy Wong
Yau Lee Kiat, Jim
Yau Lee Kiat, Jim
Yau Lee Kiat
-
7/27/2019 Iso 14001 General Information and Action Directives
3/47
Display Contigency Plan
MASTERstamp
CONTROLLEDstamp
OBSOLETEstamp
REFERENCE ONLY
18/04/06
18/04/06
18/04/06
18/04/06 Lim P L
Lim P L
Lim P L
Lim P L
Lim P L
-
7/27/2019 Iso 14001 General Information and Action Directives
4/47
No
Promotional campaign for re-use paper.
Item / Description Plan Actual
Miss Boon
PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
5/47
No
1. Emergency Evacuation Route Map & Assembly Point
( Factory ) - softcopy - to put in manual Before 1/5/06 Robert
Exit
Assembly Point
You Are Here
Department / Section
2. Emergency Response Equipment Location ( Factory )
Fire Extinguisher softcopy to put in
Fire Hose Reel & Alarm manual
First Aid KIt
Bomba Hydrant
3. Drainage System Location Map ( Factory ) sofycopy-to put in
manual
4. Emergency Evacuation Route Map & Assembly Point
( Warehouse ) - softcopy to put in manual
Exit
Assembly Point
You Are Here
Department / Section
5. Emergency Response Equipment Location ( Warehouse )
Fire Extinguisher
Fire Hose Reel & Alarm softcopy to put in
First Aid Kit manual
Bomba Hydrant
6. Drainage System Location Map ( Warehouse ) sofycopy-to put in
manual
Item / Description Plan Actual PIC
Before 1/5/06
Before 1/5/06
Before 1/5/06
Before 1/5/06
Before 1/5/06
Robert
Robert
Robert
Robert
Robert
-
7/27/2019 Iso 14001 General Information and Action Directives
6/47
No
7. Bomba report / certificate of fitness.
8. Chemical Storage Area ( at warehouse, recycle carton / box )
"Chemical Storage" label
Build store, not near to drain, build 3" plane, build containment.
9. Schedule Waste Storage Area
"Hazardous & Toxic Waste Area" label
"Lubricant oil / chemical empty drums / container" label
Build store, not near to drain, build 3" plane height, build
containment, not exposed to rain, attach waste code.
Waste Type :- Waste code
Hydraulic oil SW 306
Diesel ( container ) SW 409
IPA ( container ) SW 409
Contaminated gloves SW 410
Compressor oil SW 305
10. Fire fighting equipment functional test & maintenance
record.
Fire extinguisher list
Fire extinguisher function test / maintenance record. Fire Hose Reel list
Fire Hose Reel function test / maintenance record.
Fire alarm list
Fire alarm function test/maintenance record.
11. Safety precaution for operation(training)
Item / Description Plan Actual
Robert Yong
PIC
Andy Wong
Yau Lee Kiat
Andy Wong
Andy Wong
Yau Lee Kiat
Teh S H
Robert Yong
-
7/27/2019 Iso 14001 General Information and Action Directives
7/47
Safety officer to do briefing on PPE, wear ear plug, boots, goggles, etc.
( one shot in training needs analysis, list of ear plug receiver)
No
12. Spill kit for chemical spillage, eg. Sand, sawdust, absorbant
rags.
1 RED plastic bucket for chemical storage area.
1 RED plastic bucket for Schedule waste storage area.
1 bag 20Kg fine sand.
2 "Spill Kit" Label
13. Accident / Incident Report
14. Air emission test. ( Env Science )
Stack Flue Gas Sampling & Analysis
Sampling from heat suction duct, forming machine K3 & K2.
15. Water quality test. ( Env Science )
Sampling from treatment plant & cooling tower. ( all exit points
to public drain )
Checksheet to check effluent PH from treatment plant ( HCL +
Coustic Soda ) before releasing.
16. Noise test. ( inside factory & boundary )( Env Science )
Boundary noise measurement ( Noise mapping )
Personal Noise Exposure
"Ear plug" international sign ( if foreign workers )
"You are entering into a high noise zone area. Please wear
ear plugs"
Item / Description Plan Actual
29-3-06
31-3-06
29-3-06
29-3-06
27-3-06
27-3-06
27-3-06
27-3-06
Andy Wong
Andy Wong
Andy Wong
Teh S H
PIC
Andy Wong
Andy Wong
Robert Yong
Andy Wong
Andy Wong
Andy Wong
Andy Wong
Andy Wong
Ah Chua
20-3-06
-
7/27/2019 Iso 14001 General Information and Action Directives
8/47
EMR / DEMR propose Conie ear plug NRR 21dB.
Enclose up the air compressor ?
Fix reducer / silencer to air gun ?
No
17. Dispose Scrap Items Lists.
Recycle ( eg. our tray sell as scrap )
List record.
Schedule waste
List record.
Inventory ( fifth schedule )
List record.
Inventory ( fifth schedule )
( Recycle & Schedule Waste List can combine )
18. Chemical List & Inventory
List record.
Inventory
( follow the format EMR propose )
19. Machine license ( eg. Generator, Treatment Plant, Chimney,
Hoist, etc ( Jabatan Keselamatan Dan Kesihatan Pekerjaan
- JKKP )
Item / Description Plan Actual
Andy Wong
Andy Wong
PIC
Lim Ling Ling
Yen Fang
Robert Yong
-
7/27/2019 Iso 14001 General Information and Action Directives
9/47
No
20. MSDS from suppliers
Warranty letters from suppliers
21. Energy consumption
Water
Record. ( attach bill )
Electricity
Record. ( attach bill )
Promotional campaign to reduce water wastage.
Promotional campaign to reduce electricity wastage.
22. Paper consumption
Paper
Record.
Promotion campaign to reduce paper wastage. Encourage reuse.
23. Segregation of waste materials, eg. Cotton rag with solvent.
24. Maintenance Control - Machinery ( Preventive Maintenance-
9001 ) - Follow ISO 9001 system.
Item / Description Plan Actual PIC
26-4-0626-4-06
Arul Thasan
Lim L L
Ms. Boon
Arul Thasan
Arul Thasan
Arul Thasan
Jim Lee
Yau Lee Kiat
Arul Thasan
-
7/27/2019 Iso 14001 General Information and Action Directives
10/47
25. Provide separate bins for normal, scrap / recycle & schedule
waste
No
26. Work Instruction :-
Chemical spillage clean up, safety )
Schedule waste spillage clean up, safety )
Oil cleanup at machine containment.
27. Selection of approved waste collector.
( check DOE website )
28. Environment Emergency Practise
Fire drill ( attendance, photos + report ) - 3 minutes max.
First Aid training ( attendance, photos + report )
Chemical handling & pollution control drill
Waste handling
Item / Description Plan Actual
25/04/06
26-4-06
PIC
Jim Lee
EMR, EMS
Yau Lee Kiat
Robert Yong
committee &
Top
Mgt
Consultant
-
7/27/2019 Iso 14001 General Information and Action Directives
11/47
No
29. Identify Legal & Other Requirements
Environmental Management Systems - Requirements With
Guidance For Use ( ISO 14001:2004, IDT )
Environmental Management Systems - General Guidelines On
Principles, Systems And Support Techniques ( ISO 14004:2004, IDT )
Environmental Quality Act ( EQA )
Factory & Machinery Act ( FMA )
Occupational Safety & Health Act ( OSHA )
Item / Description Plan Actual
30-3-06
30-3-06
1-3-06
1-3-06
1-3-06
PIC
Andy Wong
Andy Wong
Andy Wong
Andy Wong
Andy Wong
-
7/27/2019 Iso 14001 General Information and Action Directives
12/47
No
30. Environmental Impact & Aspect
Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
13/47
No
31. Environmental Objectives & Targets
Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
14/47
No
32. Environmental Management Programme
Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
15/47
No
33. Environmental Performance Monitoring
Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
16/47
No
34. Internal Audit Training ( SQC )
Received Internal Audit certificates
List of qualified auditors & year of certification
Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
17/47
No
35. Internal Audit ( actual auditing )
Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
18/47
No
36. Management Review
Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
19/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
20/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
21/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
22/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
23/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
24/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
25/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
26/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
27/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
28/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
29/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
30/47
No Item / Description Plan Actual PIC
-
7/27/2019 Iso 14001 General Information and Action Directives
31/47
-
7/27/2019 Iso 14001 General Information and Action Directives
32/47
OK !
OK !
-
7/27/2019 Iso 14001 General Information and Action Directives
33/47
Back to ACTION-STATUS
Back to ACTION-STATUS
-
7/27/2019 Iso 14001 General Information and Action Directives
34/47
-
7/27/2019 Iso 14001 General Information and Action Directives
35/47
Back to ACTION-STATUS
-
7/27/2019 Iso 14001 General Information and Action Directives
36/47
-
7/27/2019 Iso 14001 General Information and Action Directives
37/47
Back to ACTION-STATUS
-
7/27/2019 Iso 14001 General Information and Action Directives
38/47
-
7/27/2019 Iso 14001 General Information and Action Directives
39/47
Back to ACTION-STATUS
-
7/27/2019 Iso 14001 General Information and Action Directives
40/47
-
7/27/2019 Iso 14001 General Information and Action Directives
41/47
Back to ACTION-STATUS
-
7/27/2019 Iso 14001 General Information and Action Directives
42/47
-
7/27/2019 Iso 14001 General Information and Action Directives
43/47
Back to ACTION-STATUS
-
7/27/2019 Iso 14001 General Information and Action Directives
44/47
-
7/27/2019 Iso 14001 General Information and Action Directives
45/47
Back to ACTION-STATUS
-
7/27/2019 Iso 14001 General Information and Action Directives
46/47
-
7/27/2019 Iso 14001 General Information and Action Directives
47/47
WASTE & POLLUTION CONTROL BRIEFING
TO CONTRACTORS / SUBCONTRACTORS
AT TOLI's CONFERENCE ROOM
Back to ACTION-STATUS