Ismail Resumex

3
Ismail Hussain 2A, Camden Row, Dublin. Email: [email protected] Mobile no: 0892319051 Personal Statement An Electrical Engineer with over 4 years of direct power plant and substation experience. In-depth knowledge of the Electrical Power Industry. Strong Awareness of cultural diversity, a natural team leader with strong interpersonal and influence skills. Experience Testing Engineer Vectors Contracting and Trading Company October 2011-August 2014 Reason for leaving: Contract Ended. AMR Project, Client: Advanced Electronics Company, Jan 2013-Aug 2014. Primary Responsibilities: Tested and Commissioned Automated Meter reading System in 132KV, 230KV, and 380KV substations (around 60 substations). Configured the Data collection Unit and integrated it with the Revenue meters (AEC) and Power Quality Meters (SEL). Familiarized in Omicron CMC 256+, MTE (Meter testing Equipment), and Freja testing equipments. Tested accuracy and maximum demand for revenue meter. Tested the functionality of power quality such as Voltage sag swell interception, harmonics and flicker. Done Secondary injection for Current and Voltage Transformer circuits and energized the revenue meter. Done Megger test for Insulation check in cables. Switchgear Project, Client: ABB Electrical Industries CO Ltd, Oct 2011-Dec 2012. Primary Responsibilities: Tested factory acceptance test for 13.8KV and 33KV Switchgear. Tested Current Transformer’s - Ratio, Winding resistance, Saturation (knee point),

description

x

Transcript of Ismail Resumex

  • Ismail Hussain

    2A, Camden Row,

    Dublin.

    Email: [email protected]

    Mobile no: 0892319051

    Personal Statement An Electrical Engineer with over 4 years of direct power plant and substation experience.

    In-depth knowledge of the Electrical Power Industry. Strong Awareness of cultural diversity, a

    natural team leader with strong interpersonal and influence skills.

    Experience

    Testing Engineer

    Vectors Contracting and Trading Company

    October 2011-August 2014

    Reason for leaving: Contract Ended.

    AMR Project, Client: Advanced Electronics Company, Jan 2013-Aug 2014.

    Primary Responsibilities:

    Tested and Commissioned Automated Meter reading System in 132KV, 230KV, and 380KV substations (around 60 substations).

    Configured the Data collection Unit and integrated it with the Revenue meters (AEC) and Power Quality Meters (SEL).

    Familiarized in Omicron CMC 256+, MTE (Meter testing Equipment), and Freja testing equipments.

    Tested accuracy and maximum demand for revenue meter.

    Tested the functionality of power quality such as Voltage sag swell interception, harmonics and flicker.

    Done Secondary injection for Current and Voltage Transformer circuits and energized the revenue meter.

    Done Megger test for Insulation check in cables.

    Switchgear Project, Client: ABB Electrical Industries CO Ltd, Oct 2011-Dec 2012.

    Primary Responsibilities:

    Tested factory acceptance test for 13.8KV and 33KV Switchgear.

    Tested Current Transformers - Ratio, Winding resistance, Saturation (knee point),

  • Burden, Polarity test.

    Tested Voltage Transformers - Ratio, Winding resistance, Insulation resistance, Polarity test.

    Tested Numerical and Analog Relays function test, over current, Earth fault, Directional O/C, under voltage, Differential, Trip and Alarms test.

    Maintenance Engineer

    Mohammed Mansour Al Rumaih Group

    February 2011-September 2014

    Reason for leaving: Job scope was limited.

    Primary Responsibilities:

    Tested and Commissioned Emerson Inverters, Rectifier, and Water Leakage Detection system in Banks and Data center.

    Periodic Maintenance of inverters, rectifier and water Leakage detection system.

    Tested charging, discharging and specific gravity of battery bank

    Tested the function, insulation of inverters, rectifier and water Leakage detection system.

    Familiarized in reading Electrical Drawings.

    Graduate Executive Engineer

    Neyveli Lignite Corporation Limited

    June 2010-Dec 2011

    Reason for leaving: Contract End

    Primary Responsibilities:

    Responsible for the safe and proper operation of a power plant, switchyard and associated control structures.

    Communicate with systems operators to regulate and coordinate transmission loads and frequencies, and line voltages.

    Inspect records and log book entries, and communicate with other plant personnel, in order to assess equipment operating status.

    Receive outage calls and call in necessary personnel during power outages and emergencies.

    Maintains power-plant operating log and prepares power generation and transmission equipment operating reports.

    Prepares equipment malfunction reports, makes inspections and from observation, determines whether equipment is operating properly.

  • Training

    ABB Automation, Riyadh

    Nov2008-Jan2009

    Objective: Tested transformer protection panel equipped with RET 541 Numerical relay at ABB

    Manufacturing plant. In addition training received in designing, production and testing of EHV

    Control and protection panels.

    Skills Mat lab, Gams, Dome.

    C, C++.

    AutoCAD, Micro Station.

    Education Profile

    ME Energy Systems Engineering (Currently pursuing)

    2014-15 University College Dublin, Ireland

    MBA Project Management (Part Time) First Class

    2011-2013 Sikkim Manipal University, Riyadh, Saudi Arabia Grade A

    B Tech Electrical and Electronics Engineering First Class

    2006-2010 National Institute of Technology, Trichy, Tamil Nadu GPA 6.8

    References Reference available on request.