Isabella Pagano PLATO TOUs PM [email protected] Padova, 1 Feb 20101System &TOUs Team...

10
Isabella Pagano PLATO TOUs PM [email protected] Padova, 1 Feb 2010 1 System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs Teams meeting Padova, 01 Feb 2001

Transcript of Isabella Pagano PLATO TOUs PM [email protected] Padova, 1 Feb 20101System &TOUs Team...

Page 1: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

Isabella PaganoPLATO TOUs [email protected]

Padova, 1 Feb 2010 1System &TOUs Team Meeting

Organization of the TOU team

PLATO System & TOUs Teams meeting

Padova, 01 Feb 2001

Page 2: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

PLATO Activities in Italy

Padova, 1 Feb 2010 System &TOUs Team Meeting 2

Page 3: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

Proposed TOUs WBS

Padova, 1 Feb 2010 System &TOUs Team Meeting 3

INAF (Oss. Astr. Padova, Catania and Milano)

Berne Univ. Firenze Univ.

Page 4: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

Planned TOU activities

Padova, 1 Feb 2010 System &TOUs Team Meeting 4

Consolidation of mechanical design

Consolidation of mechanical design

Consolidation of optical designConsolidation of optical design

Verification lenses manufacturabilityVerification lenses manufacturability

Production of mechanical structure (Al)

Production of mechanical structure (Al)

Production of lensesProduction of lenses

Thermo mechanical analysis

Thermo mechanical analysis

Page 5: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

TOU Straylight & Baffling

Padova, 1 Feb 2010 System &TOUs Team Meeting 5

Consolidation of optical designConsolidation of optical design

Straylight analysisStraylight analysis

Sun shieldSun shield

Consolidation TOU baffle design

Consolidation TOU baffle design

Production of TOU baffle prototype

Production of TOU baffle prototype

Page 6: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

TOU Prototype

Padova, 1 Feb 2010 System &TOUs Team Meeting 6

Mechanical Structure

Mechanical Structure IntegrationIntegration

Verification Tests

Verification Tests

LensesLenses

TOU Prototype

TOU Prototype

System Team

System Team

TOU baffleTOU baffle

Page 7: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

Other TOU activities

Study of GSE for the Implementation Phases

Definition of costsDefinition of developing plans

Padova, 1 Feb 2010 System &TOUs Team Meeting 7

Page 8: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

What we need

We need to know about the SPC decision; In case timelines for DP are dramatically

changed (e.g., selection at the end 2010) , the PPLC has to re-define activities (prototype not feasible);

In case the selection is in the summer 2011: What is the agreement between ESA and national

agencies (NAs)?? It seems that the shortening of the DP comes from the NAs request to avoid waste of money on projects that will not continue.

Is there any agreement among NAs to not fund hardware??

Padova, 1 Feb 2 System &TOUs Team Meeting 8

Page 9: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

What we need

In case ASI will fund the prototype activities: Is 1.5 yr from now enough? To deliver a telescope demonstrator in Jun 2011,

we need to deliver a TOU demonstrator not later than March 2011 (?). I.e. lenses and mechanical structure need to be ready for Dec 2010.

Assuming ordinary times for an industrial contract, we cannot have lenses for Dec 2010.

Can the PPLC rise ESA funds for this? (assuming this is faster with industries) Remind that this situation occurs because the

shrinking of the DP.

Padova, 1 Feb 2 System &TOUs Team Meeting 9

Page 10: Isabella Pagano PLATO TOUs PM isabella.pagano@oact.inaf.it Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.

Padova, 1 Feb 2010 10System &TOUs Team Meeting