Organization of the TOU team
PLATO System & TOUs Teams meeting
Padova, 01 Feb 2001
PLATO Activities in Italy
Padova, 1 Feb 2010 System &TOUs Team Meeting 2
Proposed TOUs WBS
Padova, 1 Feb 2010 System &TOUs Team Meeting 3
INAF (Oss. Astr. Padova, Catania and Milano)
Berne Univ. Firenze Univ.
Planned TOU activities
Padova, 1 Feb 2010 System &TOUs Team Meeting 4
Consolidation of mechanical design
Consolidation of mechanical design
Consolidation of optical designConsolidation of optical design
Verification lenses manufacturabilityVerification lenses manufacturability
Production of mechanical structure (Al)
Production of mechanical structure (Al)
Production of lensesProduction of lenses
Thermo mechanical analysis
Thermo mechanical analysis
TOU Straylight & Baffling
Padova, 1 Feb 2010 System &TOUs Team Meeting 5
Consolidation of optical designConsolidation of optical design
Straylight analysisStraylight analysis
Sun shieldSun shield
Consolidation TOU baffle design
Consolidation TOU baffle design
Production of TOU baffle prototype
Production of TOU baffle prototype
TOU Prototype
Padova, 1 Feb 2010 System &TOUs Team Meeting 6
Mechanical Structure
Mechanical Structure IntegrationIntegration
Verification Tests
Verification Tests
LensesLenses
TOU Prototype
TOU Prototype
System Team
System Team
TOU baffleTOU baffle
Other TOU activities
Study of GSE for the Implementation Phases
Definition of costsDefinition of developing plans
Padova, 1 Feb 2010 System &TOUs Team Meeting 7
What we need
We need to know about the SPC decision; In case timelines for DP are dramatically
changed (e.g., selection at the end 2010) , the PPLC has to re-define activities (prototype not feasible);
In case the selection is in the summer 2011: What is the agreement between ESA and national
agencies (NAs)?? It seems that the shortening of the DP comes from the NAs request to avoid waste of money on projects that will not continue.
Is there any agreement among NAs to not fund hardware??
Padova, 1 Feb 2 System &TOUs Team Meeting 8
What we need
In case ASI will fund the prototype activities: Is 1.5 yr from now enough? To deliver a telescope demonstrator in Jun 2011,
we need to deliver a TOU demonstrator not later than March 2011 (?). I.e. lenses and mechanical structure need to be ready for Dec 2010.
Assuming ordinary times for an industrial contract, we cannot have lenses for Dec 2010.
Can the PPLC rise ESA funds for this? (assuming this is faster with industries) Remind that this situation occurs because the
shrinking of the DP.