    DESIGN OF SUB-STRUCTURE OF BARRAGE

    ASSIGNMENT

    QUESTION:

    a. Check the stability of structure against piping. Foundation materials are fine sand, coarse sand & sand + gravel. b. Calculate the uplift pressure at the point of application and thickness of floor. Points are A, B, C, D, E, F, G, H, I, J & K.

    specific gravity of material, =2.24specific weight of water, =1 tonsm3

    64

  • 8/14/2019 Irrigation Engineering Continution Part 1

    2/6

    Muhammad Farooq Zia (2005-CE-44)

    Compiled

    DESIGN OF SUB-STRUCTURE OF BARRAGE

    Solution:We know that according to Blighs theory our structure will be safe against piping if,

    HL 1C

    BLIGHS CREEP THEORY (CHECK AGAINST PIPING)

    SOILTYPE

    BLIGHSCOEFFICIENT

    C

    ROLLNO.

    HEAD H

    Roll No.100

    (m)

    TOTALCREEP

    LENGTH'L'

    (m)

    HL 1C HL1C

    FINESAND 15 38 0.38 11.42 0.03 0.07 SAFE

    COARSESAND 12 38 0.38 11.42 0.03 0.08 SAFE

    SAND +GRAVEL 9 38 0.38 11.42 0.03 0.11 SAFE

    64

  • 8/14/2019 Irrigation Engineering Continution Part 1

    3/6

    Muhammad Farooq Zia (2005-CE-44)

    Compiled

    DESIGN OF SUB-STRUCTURE OF BARRAGE

    BLIGHS CREEP THEORY (UPLIFT PRESSURE AT PARTICULAR POINT)POINTS ROLL

    NO.LENGTH UP

    TO THATPOINT

    Lpt=S+ x1+(m)

    TOTAL CREEPLENGTHL=S+2x1

    + 2x2+2x3 m

    h'= H 1- LptL

    (m)

    (specific wt. of

    water)

    (tons/m 3)

    (specificgravity

    of concrete

    )

    UPLIFTPRESSURE

    h'

    (tons/m 2)

    t=4h'3+1

    (m)

    A 38 0.00 11.42 0.38 1 2.24 0.38 0.20

    B 38 2.50 11.42 0.30 1 2.24 0.30 0.15

    C 38 2.98 11.42 0.28 1 2.24 0.28 0.15

    D 38 3.45 11.42 0.27 1 2.24 0.27 0.14

    E 38 3.93 11.42 0.25 1 2.24 0.25 0.13

    F 38 4.35 11.42 0.24 1 2.24 0.24 0.12

    G 38 4.77 11.42 0.22 1 2.24 0.22 0.11

    H 38 5.40 11.42 0.20 1 2.24 0.20 0.10

    I 38 5.91 11.42 0.18 1 2.24 0.18 0.10

    J 38 6.42 11.42 0.17 1 2.24 0.17 0.09

    K 38 11.42 11.42 0.00 1 2.24 0.00 0.00

    64

  • 8/14/2019 Irrigation Engineering Continution Part 1

    4/6

    Muhammad Farooq Zia (2005-CE-44)

    Compiled

    DESIGN OF SUB-STRUCTURE OF BARRAGE

    LANES WEIGHTED CREEP THEORY (CHECK AGAINST PIPING)

    SOILTYPE

    LANESSCOEFFICIENT

    C

    ROLLNO.

    HEAD H

    Roll No.100

    (m)

    TOTALCREEP

    LENGTH'L'

    (m)

    HL 1C HL1C

    FINESAND 7 38 0.38 12.82 0.03 0.14 SAFE

    COARSE

    SAND 5 38 0.38 12.82 0.03 0.20 SAFESAND +GRAVEL 4 38 0.38 12.82 0.03 0.25 SAFE

    64

  • 8/14/2019 Irrigation Engineering Continution Part 1

    5/6

    Muhammad Farooq Zia (2005-CE-44)

    Compiled

    DESIGN OF SUB-STRUCTURE OF BARRAGE

    LANES WEIGHTED CREEP THEORY (UPLIFT PRESSURE AT PARTICULAR POINT)POINT

    SROLL

    NO.LENGTH UP

    TO THATPOINT

    Lpt=S+ x1+(m)

    TOTAL CREEPLENGTH

    L=S+3x1+3x2+3x3 m

    h'= H 1- LptL

    (m)

    (specific wt. of

    water)

    (tons/m 3)

    (specificgravity

    of concrete

    )

    UPLIFTPRESSURE

    h'

    (tons/m 2)

    t=4h'3+1

    (m)

    A 38 0.00 12.82 0.38 1 2.24 0.38 0.20

    B 38 2.50 12.82 0.31 1 2.24 0.31 0.16

    C 38 3.21 12.82 0.28 1 2.24 0.28 0.15

    D 38 3.93 12.82 0.26 1 2.24 0.26 0.14

    E 38 4.40 12.82 0.25 1 2.24 0.25 0.13

    F 38 5.03 12.82 0.23 1 2.24 0.23 0.12

    G 38 5.67 12.82 0.21 1 2.24 0.21 0.11

    H 38 6.30 12.82 0.19 1 2.24 0.19 0.10

    I 38 7.06 12.82 0.17 1 2.24 0.17 0.09

    J 38 7.82 12.82 0.15 1 2.24 0.15 0.08

    K 38 12.82 12.82 0.00 1 2.24 0.00 0.00

    64

  • 8/14/2019 Irrigation Engineering Continution Part 1

    6/6

    Muhammad Farooq Zia (2005-CE-44)

    Compiled

    DESIGN OF SUB-STRUCTURE OF BARRAGE

    65