Irptn presentation 12 feb 2013

26
be inspired, be moved eThekwini IRPTN Integrated Rapid Public Transport(IRPTN) 12 February 2013

Transcript of Irptn presentation 12 feb 2013

Page 1: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

e T h e k w i n i I R P T N

Integrated Rapid Public

Transport(IRPTN) 12 February 2013

Page 2: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

P R E S E N T A T I O N O U T L I N E

2012/01/23

1. IRPTN PROJECT

2. Scope of Work

3. Project Deliverables

2

Page 3: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

VISION AND CONTEXT

3 2011/10/24

Page 4: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

2030

Resources to afford what the city offers

Safe Environment in all areas of the Municipality

Ease of Movement and Access to Opportunity

Homely Neighbourhoods

Clean, green city

Our vision is: “By 2030, eThekwini Municipality will be Africa’s most caring and liveable city.”

City’s Vision

O U R V I S I O N

4

Page 5: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

O B J E C T I V E S

5

40 months ago the Municipality embarked on a process of developing a “wall to wall” public transport plan. The following were the planning objectives:

Equity of Access to Opportunity

Promotion of a liveable city

Rectify and enhance spatial structure

Quality of Service that is Acceptable to Car Users

Reduce the overall impact of transport on the environment

Have a Positive Impact on the City's Economy

Page 6: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

I R P T N S Y S T E M F E A T U R E S

• Fast

• Affordable

• Integrated ticketing with a long shelf life

• Universal accessibility

• Reliable timetables

• Pre-paid boarding services

• Level boarding

• Secure, weather protected

• Aesthetically pleasing

• Roller-shutter are used by the entrance/ exit

space to secure the internal space at night

• Developing of a station node with street

furniture, landscaping, lighting and paving

aesthetics

• Easily accessible to pedestrians

• Trunk System • Peak Period: Minimum vehicle

headway of 2 minutes • Off- Peak Period: Minimum vehicle

headway of 10 minutes

• Feeder System • Peak Period: Minimum vehicle

headway of 10 minutes • Off- Peak Period: Minimum vehicle

headway of 30 minutes

• Complementary System • Service is dictated by demand

6

Page 7: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

T R U N K N E T W O R K

Nantes BRT System

Page 8: Irptn presentation 12 feb 2013

DURBAN I R P T N

INFRASTRUCTURE

The system consists, inter-alia :

o Roads

• Road works

• Bridges

• Interchanges

• Intersections

o Associated buildings

• Terminal Stations

• Transfer Stations

• Depots

o Information and Communication Technology (ICT)

o Fare and revenue collection systems

o Control Centre

8

Page 9: Irptn presentation 12 feb 2013

DURBAN I R P T N

INFRASTRUCTURE

Median running BRT system along trunk routes

Low entry system with level boarding and alighting along trunks and along

feeder routes where possible

Closed ticketing system on trunk routes

Open ticketing system on feeder and complementary routes

Staged pedestrian crossings with stagger

Universally Accessible facilities

9

Nantes

Page 10: Irptn presentation 12 feb 2013

DURBAN I R P T N

RIGHT OF WAY

10

Page 11: Irptn presentation 12 feb 2013

DURBAN I R P T N

STATIONS AND PRECINCTS

11

STEP 1: REALISING THE NEED FOR CHANGE

AND MORE SUSTAINABLE LIVING

Page 12: Irptn presentation 12 feb 2013

DURBAN I R P T N

STATIONS AND PRECINCTS

12

STEP 2: SEEING IRPTN INFRASTRUCTURE AS

A CATALYST FOR CHANAGE

Page 13: Irptn presentation 12 feb 2013

DURBAN I R P T N

STATIONS AND PRECINCTS

13

STATION PRECINCT BUILT

FORM AND TODS: IYER

URBAN DESIGN STUDIO TO

SUPPLY – INTRO

DEVELOPMENT

STEP 3: SEEING THE CHANGE

TRANSIT ORIENTATED DEVELOPMENT

Page 14: Irptn presentation 12 feb 2013

DURBAN I R P T N

CORRIDOR C1

14

Feeder / Complementary Midi Bus Trunk Bus

Feeder / Complementary Bus

Page 15: Irptn presentation 12 feb 2013

DURBAN I R P T N

CONTROL CENTRE

15

Page 16: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

I R P T N S Y S T E M C O N F I G U R A T I O N

16

Control Centre

Depot Depot

1. ROW 2. Stations, Station

Precincts and P&R

4. Depots 5. Control Centre

6. ICT, Integrated

Fare Management

3. Terminal Stations

Page 17: Irptn presentation 12 feb 2013

DURBAN I R P T N

NETWORK AND PHASING

17

Phasing % Trunk –

Feeder Trips

Planned

Operational Year

Phase 1

C3

25

2016

C1 2017

C9 2018

C2 (Rail) 40 2016

Phase 2 C5, C7 20 2022

Phase 3 C4, C8 9 2025

Phase 4 C6 6 2027

C1

C9

C3

C6

C6

C7

C7

C5

Umhlanga

CBD

Umlazi

Mpumalanga

Pinetown

Chatsworth

Rossburgh

Tongaat

Hillcrest

Warwick

Bridge City

Airport

Prospecton

Merebank

C8

C8

C4

C2

Park and Ride

Transfer Station

Page 18: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

S E R V I C E C O V E R A G E

Currently 50% of population has access to scheduled services

Estimated 85% of population will have access to scheduled services

18

Page 19: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

I R P T N W O R K S T R E A M S

19

COUNCIL/ EXCO/GB

PROGRAMME BOARD

PROGRAMME MANAGER

INFRA- STRUCTURE

MARKETING, COMMS & CHANGE

MANAGEMENT

ITS,& IFMS

OPS PLAN, PT TRANSFORMATION

& NEGOTIATIONS

PT MRE & REGS BOARD

SKILLS DEVELOPMENT

INTEGRATED CORRIDOR

DEVELOPMENT

IRPTN SUSTAINABILTIY

INITIATIVES

Page 20: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

A C H I E V E M E N T S T O D A T E

Achievements to date includes:

MUVO Card

Wall to Wall IRPTN Complete

Preliminary Design for Phase 1 Complete

Universal Access

Rebranding, Marketing and Change Management

Depot Upgrades

Fleet Procurement: Phase 0 Vehicle Purchase

20

Page 21: Irptn presentation 12 feb 2013

DURBAN I R P T N

MUVO CARD

21

Page 22: Irptn presentation 12 feb 2013

DURBAN I R P T N

OUR ACHIEVEMENTS

22

Page 23: Irptn presentation 12 feb 2013

DURBAN I R P T N

OUR ACHIEVEMENTS

23

Page 24: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

O T H E R E T A I N I T I A T I V E S

24

Support Programs

Public Transport Brands

Startegic Program

Transport Authority ETA

IRPTN

New PT Brand

Stakeholder Negotiation

Projects

People Mover

Transition projects

MUVO

Ambassador Programs

Other

Freight & Logistics

Road Safety Plan

Non-Motorized Transport

Page 25: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

H I G H L E V E L S C O P E O F W O R K

Delivery of change management interventions that will assist the IRPTN Programme to

achieve its objectives and realise key business benefits.

Ensuring community and stakeholder participation and buy-in

Develop sufficient capacity within ETA to deal effectively with the change

Ensuring sustainability of the change brought about by the project

Work closely with “Marketing & Communications” service provider and ensure synergy between both functions

2012/01/23 25

Page 26: Irptn presentation 12 feb 2013

b e i n s p i r e d , b e m o v e d

P R O J E C T D E L I V E R A B L E S

Change Vision

Benefits realisation model

Change readiness report

Change Management strategy and plan – and provide input into the Marketing

Strategy and Plan

Strategy and Plan linked to Stakeholder matrix

Stakeholders impact assessment of the change

Implementation of all of the above

26