Iraqi Kurdistan Region
DohukClick
ErbilErbil
SulaimaniaSulaimania
• Prepared by Eng. Hazim M.
• Shingal
KarkukKarkuk
MINISTRY OF INDUSTRY AND ELECTRICITY
Minister
Deputy OfMinister
General Directory Of planning And
Finance Monitoring
General directory of Divan
Deputy of Minister For Electrical Affairs
General directory of Petroleum and Minerals
General Directory ofIndustry
Ministry Of Industry and Electricity
General Directory Of Transmission
General Directory Of Generation
General DirectoryOf Distribution
General Directory ofElectrical Projects
FinanceDepartment
AdministrativeDepartment
Regional Electricity Office
Erbil
Sulaimania
Dohuk
History
History History
History
History of Erbil Governorate• Erbil Governorate Established in 1921 • The location of Erbil Governorate is in the North East of Iraq.• Erbil Governorate Area is about 15,410 sq KM• Erbil Governorate Population 1,750,000 Person• Max. Electricity Demand (475) MVA• Number of consumers (140,000)• Electrification Rate (67%) • Erbil Governorate includes 7 Administrative Units
• Back
• (Erbil_Shaqlawa_Mergasor_Choman_Soran_Koya_Makhmor)
History of Dohuk Governorate
• Dohuk Governorate Established in 27-May-1969 • The location of Dohuk Governorate is in the North of Iraq.• Dohuk Governorate Area is about 10,715 sq KM• Dohuk Governorate Population 859,800 Person• Max. Electricity Demand (300) MVA• Total Number of Consumers (76,700)• Number of Domestic Consumers (67,7308)• Electrification Rate (70%)• Dohuk Governorate includes 6 Administrative Units
• (Dohuk_Sumail_Zakho_Amadya_Shekhan_Akra)
History of Sulaimaniyah Governorate
• The Governorate Established in 1921 • The location of the Governorate is in the North East of Iraq.• The Governorate Area is about 18,785 sq KM• Erbil Governorate Population 1,500,000 Person• Max. Electricity Demand (490) MVA• Number of consumers (128,000)• Electrification Rate (72%)
Erbil
Sulaimania
Dohuk
Exist power Generation
Hydro P.P
29 MW Diesel P.P
Dokan HPS5x80MW
Darbadikhan HPS3x83MW
29MW Plant in Erbil Governorate
29MW Diesel power Generation
29 MW Diesel Power Plant:The project is specified as a diesel generation power plant ,is implemented by BWSC Company.The project over all cost is nearly 28 million USD including spare parts for 5 years and lobe oil for 2 years.On 1/12/1999 the design of this project was started. The operation of this project started on 17/4/2001. The area of project is 24100m2 The power plant contains 4 units with 7.46 MW for each one.The units are diesel engines manufactured by MAN B&W Germany.The diesel engines are 16v32/40 type, 4 strokes and 750 rpm.The alternators were manufactured by ABB with 11kv and 50 Hz out put.The power plant will be connected with North Erbil substation grid through 2 outgoing feeders.Normally the power plant can be synchronized with the grid The plant has been designed to be operated on heavy fuel oil, diesel fuel oil and crude with certain specifications.
Erbil
Sulaimania
Dohuk
Exist Gen. and 132kv System
Hydro P.P
29 MW Diesel P.P Dokan HPS5x80MW
Darbadikhan HPS3x83MW
132/33/11 SS
132kv Line
Existing
Under Construction
Proposed
Erbil & Dohuk Substations
Erbil
Dohuk
132kV 33kV
Substations
400kV
KEC
From Dokan
From Chuarqurna
From Mosul
WGInt
Line Projects33kV 132kV
Erbil
Sulaimania
Dohuk
Exist Power Generation
Hydro P.P
29 MW Diesel P.P
Bakorman HPS50 MW
Darbadikhan HPS3x83MW
Proposed. Hydro P.P
Proposed T.P.P
Propos. Power Generation
300 MW GTPSumail
1000MW TPP
450 MW GTP(BOO)
200 MW GTP(BOO)
Bekhma HPP1500MW
Dokan HPS5x80MW
Balinda MHPS50 MW
Deralok MHPS150 MW
Begova MHPS60 MW
Dohuk And Erbil 400 and 132 kV Network
Duhok
SalahaddinErbil
Dokan
From Dibis
Qaraqush
Turkey
Harir
Existing
Proposed
Zakho
Sarsink
Sumail
Akre
400/132 SS
132/33/11 SS
Bekhma Hydro SS
Hydro
Power
Scheme
s
Bakorman
Deralok
Balinda
Hydro Power plant
150 MW
120 MW
66 & 26 MW
MAIN GENERATION SLIDE
Dam Site
Deralok
Dam
Site 150MW
DamTable
Bakurman Dam Site (66MW)
DamTable
Balinda Dam Site (120MW)DamTable
Deralok Run-of- River Deralok Run-of- River Scheme Scheme
PP==30 MWMW
DetailsContract signed with Hidro Dizayn Engineering on 7th July, 2005Agreement clauses comprises:- Surveying and Mapping Studies
- Drilling and Giological Studies
- Civil design Studies
- Basic Drawings
- Feasibility Report Writing
Begova Dam Site 60MW
DamTable