IR for Grouting

download IR for Grouting

of 2

Transcript of IR for Grouting

  • 7/27/2019 IR for Grouting

    1/2

    NO:

    Unless otherwise approved,this inspection request form shall be submitted during

    the daily morning meeting among LTA,Contractor and QP(S)

    Contractor: Project:

    To: Date:

    LTA Time:

    The work described below has been inspected by our Site Engineer and is complete

    and ready for your inspection. A checklist is attached overleaf.

    Location

    Checked and Requested By:

    Chainage

    Activity

    Drawings Used for Construction

    Other Description

    The meeting noted that the information provided by the Contractor is adequate/not adequate*.

    QP(S) may proceed Request Rejected

    * delete where appropriate

    INITIAL INSPECTION DECISION BY QP(S)

    We have inspected the above referenced works and found them acceptable. You may proceed.

    However, please return the completed checklist upon completion of the remaining work.

    You cannot proceed. Please carry out corrective works as noted on the checklist and

    submit a fresh request for inspection.

    Other comments:

    RE/RTO Name & Signature/ Date

    FINAL INSPECTION BY QP(S)

    Work approved to Start:_________________________ Work Completed on:____________________

    LTA

    The above process for request for inspection of work by Contractor and approval by QP(S) in noted.

    LTA's representative/Date/Time

    INSPECTION REQUEST FORM FOR GROUTING WORKS

    SAMWOH CORPORATION PTE LTD SK E&C

    ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA

    GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL

    ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND

    ASSOCIATED ROAD WIDENING WORKS INTERCHANGE

    Contractor's PM Name & Signature

    _____________________________________

    QP(S) Name & Signature/Date