IR Diaphram Wall

download IR Diaphram Wall

of 2

Transcript of IR Diaphram Wall

  • 7/27/2019 IR Diaphram Wall

    1/2

    INSPECTION REQUEST FORM FOR DIAPHRAGM WALL NO:

    Unless otherwise approved,this inspection request form shall be submitted

    during the daily morning meeting among LTA,Contractor and QP(S)

    Contractor: Project:

    To: Date:

    LTA Time:

    The work described below has been inspected by our supervisory personnel and is complete

    and ready for your inspection. A checklist is attached overleaf.

    Location

    Checked and Requested By:

    Chainage

    Activity

    Drawings Used for Construction

    Other DescriptionContractor's PM Name & Signature

    INITIAL INSPECTION DECISION BY QP(S)

    We have inspected the above referenced works and found them acceptable. You may proceed.

    However, please return the completed checklist upon completion of the remaining work.

    You cannot proceed. Please carry out corrective works as noted on the checklist and

    submit a fresh request for inspection.

    Other comments:

    RTO/RE Name & Signature/ Date

    FINAL INSPECTION DECISION BY QP(S)

    LTA

    LTA's representative/date/time

    _______________________________________

    QP(S) Name&Signature/Date

    work approved to start:_____________________ work completed on:_________________________

    The above process for request for inspection of work by Contractor and approval by QP(S) is noted.

    ___________________________________

    SAMWOH CORPORATION PTE LTD SK E&C

    ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA

    GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL

    ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND

    ASSOCIATED ROAD WIDENING WORKS INTERCHANGE

    The meeting noted that the information provided by the Contractor is adequate/not adequate*.

    QP(S) may proceed Request Rejected*delete where appropriate

  • 7/27/2019 IR Diaphram Wall

    2/2

    CHECKLIST FOR DIAPHRAGM WALL

    Chainage:

    S/No Description of Works Checked by Confirmed by

    Contractor QP(S)

    1 Check setting out

    2 Check services plan

    3 Locate services with cable detector and digging trial trench

    4 Check soil sample at trench base and confirm by contractor's

    Professional Engineer

    5 Check certificate of fitness of excavating crane & service crane

    6 Check certificate of crane operator

    7 Check excavating crane and service crane located on firm bases

    8 Check cover blocks/spacers

    9 Check steel cage reinforcement

    10 Ensure cleanliness of excavated trench

    11 Provision of tremie pipe

    12 Quantity of ready-mix concrete : m3

    ------------------

    13 Check concrete grade Grade :

    ------------------

    14 Take slump test Desired slump mm

    ------------------

    15 Take cube samplesNo of sets: Reference:

    16 Check verticality of panel

    17 Check calculated depth of penetration

    18 Check CWS joint/Water stop

    19 Check cut-off level of panel

    20 Check provision of couplers

    21 Check recess to form box-outs between the steel cages and the

    near face of the diaphragm wall

    22 Check sufficient temporary traffic devices if lane

    closure is required

    23 Others

    No:

    Date/Time: Location: