Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT...

10
Ipswich City Precinct

Transcript of Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT...

Page 1: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

Ipswich City Precinct

Page 2: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

6. ICC Precinct Installation Standards

& Regulatory Compliance

ICT Infrastructure Integration & Convergence

1. Pit & Pipe Underground

Plant

2. ICT Equipment Containment

Facilities

3. Cable Plant, Wireless

Capacity & Coverage

8. Disaster Recovery

7. Vendor Warranted Systems Certified Installers

4. Security, CCTV, Access Control,

Incident Recording, Notification

5. ICT Network Voice, Data,

Video, Internet Services

Page 3: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

1/ Pit & Pipe Underground Plant• Communication cable perimeter & service corridors

- site internal service pathways - interconnect to external service pathways

• Pit type, construction suitability, loading capacity• Pit security• Pit placement, co-ordination with other services• Pit environmental conditioning, drainage• Conduit capacity• Conduit above ground pathway location and identification• Provision for initial cable plant installation and expansion capability• Adaption for change and future requirements• Records and management

1. Pit & Pipe Underground

Plant

Page 4: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

2/ ICT Equipment Containment Facilities and Pathways• External exchange service provider facilities

• Building entrance room

- Primary pathway

- Alternate pathway

• Building main equipment rooms

• Building floor telecommunication rooms

• Near rooftop communication rooms for

- Satellite earth terminal equipment

- Microwave & line of site terminal equipment

- Radio and paging terminal equipment

• Spatial & environmental (Mechanical, Electrical, Fire, Security) considerations

• Adaption for change and future requirements

• Records and management

2. ICT Equipment Containment Facilities & Pathways

Page 5: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

3/ Cable Plant, Wireless Capacity and Coverage• Precinct campus subsystem cabling (backbone)

- Optical fibre & unshielded copper twisted pair

• Building subsystem cabling (backbone)

- Optical fibre & unshielded copper twisted pair

• Horizontal subsystem cabling

- Optical fibre &/ or copper twisted pair

• Wireless coverage, survey

• Wireless capacity, flexibility for adapt and change

• Multiple wireless application and service delivery considerations

• Adaption for change and future requirements

• Records and management

3. Cable Plant, Wireless

Capacity & Coverage

Page 6: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

4/ Electronic Services (Hardware / Software)• Cloud Based Access Control / Alarm systems

• Cloud Based CCTV (Cameras and Digital Recording inc. Meta data)

• IPTV (Commercial / Residential ) with advertising revenue

• Internet Services (Commercial / Residential )

• Voice Over Internet Protocol (VOIP)

• Energy Monitoring / Control

• Cloud backup storage / disaster recovery (DR)

• Building Management Systems (BMS)

• Managed Virtual and Dedicated Servers

• Adaption for change and future requirements

• Records and management

4 Electronic Services (Hardware

/ Software)

.

Page 7: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

5/ ICT Network, Voice, Data Video, Internet Services• Precinct admin and management data network

• Precinct admin and management voice network

• Precinct radio (voice) admin & management network

• Current/ initial internet service delivery capability

• Adaption for change and future requirements

• Records and management

5. ICT Network Voice, Data,

Video, Internet Services

Page 8: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

6/ ICC Precinct Standards and Regulatory Compliance• Local pit & pipe installation and practice standards

• Local cable installation and practice standards

• Cable vendor installation and practice standards

for maintaining warranty and certification

• State Government standards

• Australian mandatory and recommended regulatory

Installation standards

• Adaption for change and future requirements

• Records and management

6. ICC Precinct Installation Standards

& Regulatory Compliance

Page 9: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

7/ Vendor Warranted Systems, Certified Installers• End to end manufacturer/ vendor warranted systems

• Manufacturer/ vendor certified installers

• Regulatory certified installers

• Local manufacturer/ vendor representation for

ongoing maintenance and warranty response

• Records and management

7. Vendor Warranted Systems Certified Installers

Page 10: Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.

ICT Infrastructure Integration & Convergence

8/ Disaster Recovery• Workshop emergency and disaster recovery planning

• Major incident facility consideration

• Draft, presented for review, tested and final

disaster recovery plan

• Adaption for change and future requirements

• Records and management

8. Disaster Recovery