Investor Forum Investor Forum IPP Projects to Procure 20 2014 iii IPP Procurement Division Jakarta, 19 March 2014 PT PLN (PERSERO)

description

Indonesia IPP project presentation by PLN

Transcript of IPP Discussion Forum - Handouts 19 March 2014

Investor ForumInvestor ForumIPP Projects to Procure 

202014

i i iIPP Procurement DivisionJakarta, 19 March 2014

PT PLN (PERSERO)

Introduction

• PLN will procure IPPs to develop some projects to meet electricity demand in Sumatra & Bangka Island through a competitive tender process

• 6 Projects:• 6 Projects: – 5 Coal Fired Steam Power Plant – 1 Gas Fired Power Plant

• PLN will enter into PPA with the selected IPP for 25 year term in a Build‐Own‐Operate‐Transfer (BOOT) scheme (coal), and 20 year term in a Build‐Own‐Operate (BOO) scheme (gas)20 year term in a Build‐Own‐Operate (BOO) scheme (gas). 

• No Government Guarantee will applicable

2

Disclaimer

The following information are subject to change. Final requirements will be determined in the PQ and RFP 

Documents.

3

General Criteria

• Consortium 2 – 4 membersConsortium, 2  4 members• Shall have adequate experience as IPP developer as well as O&M and/or EPC

• Shall have adequate financial strength• Has minimum of 5A2 rank from D&B (Dun & Bradstreet)  

di it fi i l t th d i k i di tregarding its financial strength and risk indicator• To comply with local content requirement

4

General Scope of work of IPP

• Power plant & its supporting facilities including required landPower plant & its supporting facilities, including required land acquisition

• Special facilities / Transmission line to the interconnection point 

• Town feeder 20 kV & relevant facilities to supply surrounding areaarea

5

Projects Locations

Meulaboh CFPP 3&4 (2x200 MW)(2x200 MW)

Bangka Peaker GFPP (100 MW)

Jambi CFPP(2x400 MW)

Bengkulu  CFPP (2x100 MW) Sumsel 1 Mine‐mouth 

CFPP (2x300 MW)

Sumbagsel 1 Mine‐mouth CFPP (2x150 MW) 6

Sumsel 1 Mine-mouth Coal Fired PP (2x300 MW)

• Scheme: Mine-mouth Coal Power Plant

• Net/Contracted Capacity: 2x300 MW (+/- 10%)

• Location: South Sumatra

• Connection Point: radial to Betung SS 275 kV (will be available 2015)

• Estimated investment: USD 800 M

• Expected COD: 2020

• Contract term: 25 years

• Contract scheme: BOOT

PLTU Sumsel-12x300 MW - 2020

Sumbagsel 1 Mine-mouth Coal Fired PP (2x150 MW)

• Scheme: Mine-mouth Coal Power Plant

• Net/Contracted Capacity: 2x150 MW (+/- 10%)

• Location: South Sumatra

• Connection Point: radialto existing Baturaja SS 150 kV

• Estimated Investment: USD 450 M

• Expected COD: 2018-2019

• Contract term: 25 years

• Contract scheme: BOOT

PLTU Sumbagsel-12x150 MW – 2018/2019

Mine Mouth Power Plant Criteria

1. Consortium, 2 – 4 members:,• Mining Company (minimum 10% of share in SPC)• Power Company (minimum 30% of share in SPC)• + Others (0 or 1 or 2)• + Others (0 or 1 or 2)

2. Coal Calorific Value (HHV, GAR in kcal/kg): TBD3. Coal Price Formula: As per applicable regulationp pp g

9

Mine Mouth Power Plant Criteria

1. Mining Company:g o pa y• Shall have coal mining experience: in operation and production• Holds IUP Operasi Produksi with Clean and Clear status for the 

d i iproposed mining area• Having sufficient coal reserve to  support power plant for 

minimum 30 years operation, proven by JORC report

2. Power Company:• Shall have IPP development experience• Has minimum of 5A2 rank from D&B

3. Other member• Has minimum of 5A2 rank from D&B• Has minimum of 5A2 rank from D&B

10

Mine Mouth Power Plant IPP Project Structure

Bidding Consortium

Power CompanyMining Company

Other Consortium 

Other Consortium 

Equity

CompanyMember Member

Majority C t l

Coal Mine(IUP/PKP2B)

Project Company

Power Purchase Agreement

Coal Supply Agreement

Control

Lenders

EPC  ContractorO&M  Contractor

11

Meulaboh 3&4 Coal Fired PP (2x200 MW)

• Scheme: Coastal Coal Power Plant (with passed‐through scheme for coal)

• Net/Contracted Capacity: 2x200 MW (+/‐ 10%)

• Location: Meulaboh, Aceh,• Connection Point: radial to 

Meulaboh SS 275 kV (will be available on 2017))

• Estimated investment: USD 600 M

• Expected COD: 2018‐2019Expected COD: 2018 2019• Contract term: 25 years• Contract scheme: BOOT

ill id h l d• PLN will provide the land

12

Jambi Coal Fired PP (2x400 MW)

S h i l• Scheme: conventional inland Coal Power Plant

• Net/Contracted Capacity: 2 400 MW ( / 10%)2x400 MW (+/‐ 10%)

• Location: Sarolangun, Jambi

• Connection Point: Incomer Future MuaraEnim ‐ New Aur Duri 500 kV ( ill b il blkV (will be available on 2019)

• Estimated investment: USD 1200 MUSD 1200 M

• Expected COD: 2019‐2020

• Contract term: 25 years• Contract scheme: BOOT

13

Bengkulu Coal Fired PP (2x100 MW)

• Scheme: Coastal Coal Power Plant (with passed‐through schemepassed through scheme for coal)

• Net/Contracted Capacity : 2x100 MW apac y 00(+/‐ 10%)

• Location: Bengkulu• Connection Point: radialConnection Point: radial 

to Pulo Baai SS 150 kV (will be available on 2016))

• Estimated investment: USD 300 M

• Expected COD:2019Expected COD:2019• Contract term: 25 years• Contract scheme: BOOT 14

Conventional Coal PP IPP Project Structure

Bidding Consortium

Consortium Member

Consortium Member

Consortium Member

Consortium Member

Equity

MemberMember Member Member

Coal Supplier(s) Project Company

Power Purchase Agreement

Coal Supply Agreement

Lenders

EPC  ContractorO&M  Contractor

15

Bangka Peaker Gas Fired PP 100 MW

• Scheme: Gas fired Power• Scheme: Gas fired Power Plant (with passed‐through scheme for the gas). Applicant shallgas). Applicant shall provide the gas supply under minimum a 8 year supply contract.pp y

• Net/Contracted Capacity: 100 MW 

• Location: BangkaLocation: Bangka• Connection Point: radial to future Kelapa SS 150 kV (will be available on 2015)(will be available on 2015)

• Estimated investment: USD 100 M

• Expected COD: 2018 ‐2019• Expected COD: 2018 ‐2019• Contract term: 20 years• Contract scheme: BOO 16

Bangka Peaker Gas Fired PP IPP Project Structure

Bidding Consortium

Gas SupplierConsortium Member

Consortium Member

Consortium Member

Consortium Member

Equity

MemberMember Member Member

Project Company

Power Purchase Agreement

Gas Supply Agreement

Lenders

EPC  ContractorO&M  Contractor

17

Indicative Implementation Schedule

SchedulePQ RFP Bid

LoI (Winning PPA

Projects

Sumsel 1 MM CFPP Q1 2014A il

Q2 2014J

Q4 2014O t b

Q3 2014D b

Q1 2015M h

PQ Issuance

RFP Issuance

Bid Submission

(Winning Bidder Award)

PPA Signing

April June October December March

Sumbagsel 1 MM CFPP

Q1 2014April

Q2 2014June

Q4 2014October

Q4 2014December

Q1 2015March

M l b h 3&4 CFPP Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015Meulaboh 3&4 CFPP Q1 2014April

Q2 2014June

Q3 2014September

Q4 2014November

Q1 2015February

Bengkulu CFPP Q1 2014April

Q2 2014June

Q3 2014September

Q4 2014November

Q1 2015FebruaryApril June September November February

Bangka Peaker GFPP Q1 2014Mei

Q3 2014July

Q4 2014October

Q4 2014December

Q1 2015March

Jambi CFPP Q1 2014 Q4 2014 Q1 2015 Q2 2015 Q2 2015Jambi CFPP Q1 2014August

Q4 2014October

Q1 2015February

Q2 2015April

Q2 2015July

18

Things to Prepare

• Feedback submission• Networking to establish consortium• Expression of Interest• D&B rating application• Coal / gas supply preparation• Lender approaching• Expression of Interest from Equipment suppliers

19

Contacts

IPP Procurement DivisionPT PLN (Persero)Head Office, Main Building 13th floorHead Office, Main Building 13 floorJl. Trunojoyo Blok M I/135, Kebayoran Baru, JakartaIndonesia 12160Ph.:  +62 21 722 7049 (direct)

61 21 722 1234 (h ti ) t 1652+61 21 722 1234 (hunting) ext. 1652Fax: +62 21 725 1511www.pln.co.id

Division Head: Hernadi Buhron ([email protected])

IPP Procurement Planning:1 Jefri Rosiadi (jefri rosiadi@pln co id)1. Jefri Rosiadi ([email protected])2. Dwi Hartono ([email protected]) 3. Sekar Paramita ([email protected]

Booklet related to IPP procurement can be downloaded through this link:http://www.pln.co.id/dataweb/ipp/bookletipp.pdf

20

Thank you

21

Feedback and Questions lare welcome

22