![Page 1: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/1.jpg)
IPC Working Group 27-
Update on IT support for the IPC
GenevaJune 7, 2012
Patrick Fievet
Head of IT Operations and Support Section
![Page 2: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/2.jpg)
Agenda
Updates on IPC-related IT support
IPCRECLASS status
IPC-Eforum functional evolutions
Specification for the IPC scheme file
![Page 3: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/3.jpg)
IPCRECLASS
Opening for production use- STATUS mid-April 2012
No problem reported during one and half month testing period
Opening for production use: Occurred as planed on April 12, 2012
Missing some Residual Working lists (RWL)
![Page 4: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/4.jpg)
IPCRECLASS
Current STATUS:
Some Offices did not update their Email contact details
IPC reclassification process blocked to avoid inappropriate feedback from IPCRECLASS
2007, 2008 and 2012 RWL uploaded
Missing some residual Working lists (2009, 2010, 2011)
Reclassification Email submissions are piling up.
![Page 5: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/5.jpg)
IPCRECLASS
Perspectives:
Awaiting MCD provision of RWL for IPC revisions 2009, 2010, 2011
Unblock the email based submission part of the IPC reclassification process
Upload of working list for IPC 2013.01
![Page 6: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/6.jpg)
IPCRECLASS
Reminder about current login access limitation:
Login name should be typed in upper-case
Password should be typed in lower case
In case of failed login
![Page 7: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/7.jpg)
IPC E-FORUM
IPC-IEF 2012 Functional evolutions
![Page 8: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/8.jpg)
IPC E-FORUM
IPC-IEF 2012 Functional evolutions
Based on the reworked IPC-IEF 2012
Detailed requirement and functional specifications available under project CE445
Integrate into IPC IEF modified version of some IPC-calendar functionalities
![Page 9: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/9.jpg)
IPC E-FORUM
IPC-IEF 2012 Functional evolutions overview
Action list tab with various filters
E-mail reminders for deadlines i.e. For the next action in a project action plan
Filter by technical field
New file formats allowed for annex submissions
E-mail notifications grouping
Rapporteur summary
![Page 10: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/10.jpg)
New file formats for annex submissions
Limited list of authorized file formats
Automatic PDF conversion for some only
New formats:
MS Excel, MS PowerPoint,
Various image formats (TIF, JPG, PNG…)
XML, ZIP
Direct submission in PDF format
...And more if needed (but without automatic conversion to PDF)
Systematic virus checking
![Page 11: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/11.jpg)
New file formats for annex submissions
![Page 12: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/12.jpg)
Action List Tab
![Page 13: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/13.jpg)
Mailing list
![Page 14: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/14.jpg)
Rapporteur summary
![Page 15: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/15.jpg)
Rapporteur summary
![Page 16: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/16.jpg)
Demonstration (release not available outside WIPO)
Provisional plan for move into production: Week 25
IPC-IEF 2012 functional evolutions
![Page 17: IPC Working Group 27- Update on IT support for the IPC Geneva June 7, 2012 Patrick Fievet Head of IT Operations and Support Section.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649f2a5503460f94c45060/html5/thumbnails/17.jpg)
Specification of IPC XML scheme file
Specification of the current IPC XML scheme file
Available under QC010 project
Preparation for potential evolutions of the scheme
Preparatory steps for the FI/IPC/CPC parallel viewer
XML scheme files for CPC and FI as modifications of IPC scheme master files