IOU LEAST COST-BEST FIT (LCBF): ALIGN WITH RPS CALCULATOR?
![Page 2: IOU LEAST COST-BEST FIT (LCBF): ALIGN WITH RPS CALCULATOR? 1.](https://reader035.fdocuments.in/reader035/viewer/2022081007/56649d705503460f94a52cda/html5/thumbnails/2.jpg)
2
Overview of LCBF Alignment Panel Discussion
• Purpose: – Understand IOUs’ perspective on how the issues discussed
during the workshop might inform the 2015 LCBF revisit and the determination of need in RPS procurement plans going forward
• Out of Scope:– Panel discussion is not about how the RPS calculator can be used
to rank RPS RFO bids or supplant the IOUs’ LCBF methodology
• Panel format:– IOU presentations on current LCBF methodology– IOU panel discussion regarding possible changes to LCBF – Facilitated Q&A with stakeholders
![Page 3: IOU LEAST COST-BEST FIT (LCBF): ALIGN WITH RPS CALCULATOR? 1.](https://reader035.fdocuments.in/reader035/viewer/2022081007/56649d705503460f94a52cda/html5/thumbnails/3.jpg)
3
What is LCBF?• 2003: CPUC defines LCBF and establishes LCBF ranking
process
– Methodology used by IOUs to rank offers in RPS annual RFO
• 2004 - 2012: CPUC makes incremental improvements to LCBF
• 2012: CPUC requires standardized variables in IOUs’ net market value calculation (NMV), which is part of LCBF
– NMV: (energy value + capacity value) – (post-TOD adjusted PPA price + transmission network upgrade costs + congestion costs + integration costs) + ancillary services value