INVEST Implementation at the Tollway October 27, 2014

Transcript of INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois...

Page 1: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

INVEST Implementation at the Tollway October 27, 2014

Page 2: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Move Illinois Capital Program

2

Page 3: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

3

Implementation of INVEST at the Tollway The Illinois Tollway has integrated

INVEST throughout it processes

Will use all three INVEST Modules System Planning Operations & Maintenance Project Development

INVEST will help the Tollway

incorporate sustainability into the program measure progress identify barriers to sustainability report sustainability consistently to our

stakeholders

Page 4: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

INVEST Implementation – Annual and Project Processes

4

1. Goal Setting

2. Training

4. Program-wide Analysis

5. Identify Improvement

Initiatives

6. Implement Improvement

Initiatives

7. Annual Reporting

3.2 Implement Solutions

3.3 QA/QC

Evaluations

3.4 Evaluate Corridors

3.1 Evaluate Projects

Project Process (inner cycle)

Annual Process (outer cycle)

Page 5: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

System Planning

Sustainability evaluations were conducted on Tollway processes before INVEST was implemented, in order to obtain a baseline score the Tollway used for its most recent funding programs each program showed steady progress on

sustainability above the level of the previous one

5

Page 6: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

6

0

50

100

150

200

250

ILLINOIS TOLLWAY System Planning Baseline Scores

Total Points Available Total Annual Score

2000 Tollway 2000 62 points Not rated

2004 Pre-CRP 100 points Silver

2011 Move Illinois 148 points Platinum

2013 Move Illinois 159 points Platinum

Total Points Available = 240

Page 7: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

System Planning Highlights

Demonstrating Industry Leadership Integrating planning with the three legs of the Triple

Bottom Line of Sustainability (Social, Economic and Environmental)

Leveraging available technologies to improve capacity and efficiency of operations

Coordination with Operations & Maintenance and Project Development is positively affecting efficiency of delivery of Tollway projects

7

Page 8: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

System Planning Highlights (continued)

Opportunities for Improvement Continue coordination with CMAP and positively affect

sustainability of Analysis Methods, Air Quality, and Travel Demand Management in the region and at the Tollway

Improve focus on the Reduction of Energy and Fossil Fuel Consumption of the road users

Focus on Infrastructure Resiliency, including the use of Life Cycle Assessments of roadway components

Climate Change Adaptation of Tollway facilities

8

Page 9: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Operations & Maintenance

Decisions made in earlier System Planning and

Project Development steps influence the sustainability of the infrastructure, including operations and maintenance

Data collected in O&M in turn influences System

Planning and Project Development

9

Page 10: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

10

0

50

100

150

200

250

ILLINOIS TOLLWAY Operations & Maintenance Baseline Scores

Total Annual Score % Available Points Earned

2004 Pre-CRP 99 points Silver

2000 Tollway 2000 85 points Silver

2009 Most Pre-CRP Implementation 128 points Platinum

2013 Move Illinois 139 points Platinum

Total Points Available = 210

Page 11: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Operations & Maintenance Highlights

Demonstrating Industry Leadership Leveraging data in Pavement and Bridge Asset

Management system to evaluate the condition of roadways and provide input to planning and design (OM-7)

Efficiently and sustainably performing snow and ice control activities (OM-12)

Leveraging available technology for improvement operations and incident management (OM-13)

11

Page 12: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Operations & Maintenance (continued)

Opportunities for Improvement Focus on Internal Sustainability Planning and

execution of daily activities Tracking commitments made during permitting, right-

of-way acquisition, planning and design into design, construction and operations & maintenance

More efficiently leverage the data in the Asset Management system to inform planning and design phases

12

Page 13: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Project Development

Tollway implementing FHWA’s Project Development

module as base for their program Tollway has made adjustments based on Illinois

DOT’s I-Last rating system Tollway has made adjustments based on Tollway-

specific practices.

13

Page 14: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Project Development The Illinois DOT has their

own sustainability program: I-LAST

Illinois stakeholders were influential in developing I-LAST

The Tollway incorporated I-LAST measures into their INVEST program with the Tollway-specific supplements and criteria

14

Page 15: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Tollway’s INVEST Project Development Module

15

Tollway’s Project Development Module

FHWA’s 29 Criteria Tollway supplements to

10 of the FHWA criteria 8 Tollway-specific

criteria

Page 16: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Tollway-Specific Criteria

PD-50T: Alignment Selection PD-51T: Visual Aesthetics PD-52T: Noise Abatement PD-53T: Reduce, Reuse and Recycle Materials

(Design) PD-54T: Light Pollution PD-55T: Regional Employment PD-56T: Permeable Pavement PD-57T: Innovations

16

Page 17: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Tollway-Specific Supplements

PD-07 Habitat Restoration PD-09 Ecological Connectivity PD-10 Pedestrian Access PD-13 Freight Mobility PD-17 Energy Efficiency PD-18 Site Vegetation PD-19 Reduce and Reuse Materials PD-20 Recycle Materials PD-21 Earthwork Balance PD-24 Contractor Warranty (deleting)

17

Page 18: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Project Development

The Tollway’s INVEST Program consists of 10 steps Process is divided

into planning and construction stages

Submittals are required at each stage to ensure the process is followed

18

Page 19: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Project Development

Baseline Evaluations (before INVEST was implemented) More than 35 projects constructed between 1998 and

2014 Construction costs vary from $400k to $134M Equal distribution of bridge, HMA and PCC projects Equitable distribution of projects between Tollway’s

four capital improvement programs: Tollway 2000, Congestion Relief Program, On Road Tolling, and Move Illinois

19

Page 20: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Project Development

Demonstrating Industry Leadership Long-term economic analyses and financial sustainability

(PD-1) Progressive investigation and use of methods to recycle,

reduce and reuse materials (PD-20) Extensive use of available technologies to improve incident

management, safety and operational efficiency (PD-14) Strong vegetative management planning (PD-18) Proactive earthwork balancing on projects and between

projects (PD-21) Use of warm mix asphalt (PD-23)

20

Page 21: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Project Development

Opportunities for Improvement Consider Incorporation of Life Cycle Cost Analyses to

inform bridge and major elements type selection Implementation of FHWA’s newly released Highway Safety

Manual Tracking commitments made during permitting, right-of-

way acquisition, planning and design into design, construction and operations & maintenance

Focus on reduction of energy consumption by project by reducing demand and adding renewable energy sources

Focus on Contractor activities that promote sustainability, such as Environmental Training, Construction Noise Mitigation, Waste Management, etc.

21

Page 22: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

Future Project Development

Use of Life Cycle Assesment (LCA) – to develop a sustainability architecture for an objective environmental assessment of Tollway Construction Projects Pavement LCA Drainage LCA Structures LCA Lighting LCA Landscape LCA

22

Page 23: INVEST Implementation at the Tollway · 3 Implementation of INVEST at the Tollway The Illinois Tollway has integrated INVEST throughout it processes Will use all three INVEST Modules

THANK YOU Steve Gillen