Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Inventory and Modernization of Exterior Lighting at Campus Westend, Goethe-Universität Frankfurt am Main
Author: Jason Selvarajan, B.Sc. Environmental Engineering, Metropolia University of Applied Sciences, Finland
Pioneers into Practice Programme 2014, Climate-KIC Centre Hessen
Host: Facility Management Unit of Campus Westend
Reporting period: May 2nd 2014 - June 6th 2014
1
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 2
Some of the Facility Management Staff
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Content• Short Introduction
• ShowerMagic
• Inventory of light fixtures and bulbs
• Photo survey & MapBox - Online interactive map
• Exterior lighting energy consumption & cost
• Modernization possibilities
3
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Why Energy Efficiency?
• Slow down climate change
• Reduce impact on the environment
• Save resources
• Save money
• Be more practical
4
Wednesday, May 28, 14
6
ShowerMagic is a ShowerWater filter that cleans and reuses water
To save water, energy and the environment
Wednesday, May 28, 14
Many Experiments
SAND AND ACTIVATEDCARBON
ULTRA VIOLET LIGHT
COMBINED
7
Many experiments were carried out to test the filters
Wednesday, May 28, 14
Sand Filters
T1 T9
Sand filter ExperimentsSand filter Experiments
Test number/name Bag height (cm)
Bag width (cm) Temperature (C) Total test dust mass
pre-filter (g)Total test dust mass
post-filter (g) Filtration efficiency
S1 10 19 39.5 50.01 0.41 98.34
S9 30 19 38.5 50.01 0.31 98.76
SAND AND ACTIVATED CARBON SYSTEM DIAGRAM
9
RESULTS
Some results for the particle filter
Wednesday, May 28, 14
Ultra Violet Irradiation Reactor
6600 uW for 99% deac-va-on of E.coli
Peak effective wavelength of 265 nm discovered by Gates and isolated to 253.7 by Ehrismann and Noethling in 1932.
10
Background info on UV-C
Wednesday, May 28, 14
Calculating Dosage
Dosage depends onEXPOSURE TIME flow rateREACTOR DIMENSIONS
UV-C OUTPUT of BULBBULB DIMENSIONSirradiance zonediminishing factortransmissivity
variableflow rate
flow rate
desired dosage
bulb length
outer diameter of quartz sleeve
outer diameter of bulb
inner diameter of shell
bulb UV-output
circumference of bulb
cross-sectional area (for vol)
volume
Volume in liters
time in tube
diameter or irradiance zone
circumference of irradiance zone
surface area or the irradiance zone
diminishing factor (RATIO)
exposure time
REAL bulb Fluence/ s cm^2
REAL Fluence/ s cm^2 in irradiance zone
Total Irradiance
unit l/min ml/s µW cm cm cm cm µW*s cm cm^2 cm^3 L s cm cm cm^2 : s µW*s/cm^2µW*s/cm^2µW
Purion 2500H10.00 166.6710000.0080.64 2.50 1.50 4.00 265.00 4.71 7.66 617.510.62 3.71 3.34 10.48 844.990.45 3.71 981.84441.55373107.340.00 10000.00
90% reduciton ecoli2600.00143.50l/h m^3/h 400 j/m^2400 j/m^2 2500L/3600s2500L/3600s 400j@2500L + 3600s =400j@2500L + 3600s =400j@2500L + 3600s = 99% reduction6600.0056.53600.00 0.60 0.69 l/s 277.78
12
Wednesday, May 28, 14
E.coli Plate Counts
UV experimentsUV experiments
Test number/name Starting NTU Temperature (C) Flow rate (l/min)
Pre-UV concentration (CFU/ml)
Post-UV concentration (CFU/ml)
Reduction (%)
UV1 0.00 40.00 9.97 2.60E+06 0 100.0000
UV2 16.00 38.90 10.17 7.30E+05 3 99.9996
UV3 96.80 42.00 9.84 4.70E+05 0 100.0000
UV4 961.00 37.60 9.87 1.35E+06 4 99.9997
UV
13
Some excellent results for UV sterilization
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
• Short Introduction
• ShowerMagic
• Photo survey & MapBox - Online interactive map
• Inventory of light fixtures and bulbs
• Exterior lighting energy consumption & cost
• Modernization possibilities!
17
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Photo + Map Survey
18
Color codes and symbols used for cataloging
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Photo + Map Survey
19
Many lamps were missing - around 50 are not cataloged
The naming of the lamps is weird
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 20
G12 socket and Metal
G24q-3 socket and CFL lamp
The two most common light fixtures
Type B
Type A
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
MapBox
23
Free for 3000 usersOpenStreetMap.org (open source map)Online - use your smart phoneCustomizable
http://tinyurl.com/pdlbjbe
Satellite view
Photos
Information
Location
Classification
Also list view!
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Content
24
• Short Introduction
• ShowerMagic
• Photo survey & MapBox - Online interactive map
• Inventory of light fixtures and bulbs
• Exterior lighting energy consumption & cost
• Modernization possibilities!
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Classification of Light Fixtures...
25
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
...and Bulbs
26
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 27
Comparison of ENERGY CONSUMPTION of Lamp A to All Other Lamps
A B
0
37.5
75.0
112.5
150.0
Lamp type
Distribution of Lighting Fixtures
Num
ber o
f Lam
ps
A B C D E F G H
0
3750
7500
11250
15000
Lamp type
Powerconsumption of Lighting Fixtures
Tota
l Pow
er C
onsu
mpt
ion
of L
amps
(kW
h)
52%
48%
Comparison of Lamp A to All Other Lamps
The Two most common lamps
Lamp A is a hotspot
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Content
28
• Short Introduction
• ShowerMagic
• Photo survey & MapBox - Online interactive map
• Inventory of light fixtures and bulbs
• Exterior lighting energy consumption & cost
• Modernization possibilities!
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
6.0
8.8
11.5
14.3
17.0Annual Night Time Durations in Minutes
Ligh
ts O
N d
urat
ion
(h)
Calculated Night Time Predicted Night Time
01 (Jan) 02 03 04 05 06 07 08 09 10 11 12
9.2
9.5
9.7
10.0
10.2
22.04.14 23.04.14 24.04.14 25.04.14 26.04.14 27.04.14 28.04.14 29.04.14 30.04.14
Comparing Calculated and Measured Lighting Periods Over 9 DaysLi
ghts
ON
dur
atio
n (h
)
DateCalculated lux Measured lux
29
Lux data from SAUTE vs solar chart
Used to simulate daily fluctuations
To see if there is a significant change to costs... answer is very low so solar charts can be used
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 30
Number of Lamps Power Consumption of All Lamps (Watts)Power Consumption of All Lamps (Watts)Power Consumption of All Lamps (Watts)
268 214622146221462Total Night Time / Lamps ONTotal Night Time / Lamps ONTotal Night Time / Lamps ONTotal Night Time / Lamps ON
Minutes / year Hours / year Avg. / day
Sum of calculated 257056 4284 12
Sum of predicted 260803 4347 12
Difference 3747 62 0
Total Power ConsumptionTotal Power ConsumptionTotal Power ConsumptionTotal Power Consumption
Low est. High est.91950389 93290710 Wh / yearWh / year
91950 93291 kWh / yearkWh / year92 93 MWh / yearMWh / year
Total cost (0.198€/kWh)Total cost (0.198€/kWh)Total cost (0.198€/kWh)Total cost (0.198€/kWh)
Low est. High est. 0 c/kWh
18206 18472 € / year€ / year50 51 € / day€ / day
4 4 € / hour€ / hour
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Content
31
• Short Introduction
• ShowerMagic
• Photo survey & MapBox - Online interactive map
• Inventory of light fixtures and bulbs
• Exterior lighting energy consumption & cost
• Modernization possibilities!
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 32
HID ‘High Intensity Discharge’ High Pressure Sodium, Metal Halide, etc...
OLED now OLED in 5 years
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 33
PowerLumens
Color tempVoltage
Socket typeSize
New lamp costsInstallation costs
Savings (kWh or €)
Payback period+
Ecological Footprint
Technical Financial
Calculating the ecological footprint should be the next step in the modernization
process along with testing the replacement of existing bulbs to
LEDs
The eco footprint is important because the
embedded energy of LEDs is very high so the REAL (non-monetary) savings are less
than we think they are.
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 34
FUSE
BALLAST
TEAM WORK
SOCKET
Vorschaltgerät
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Inventory and Modernization of Exterior Lighting at Campus Westend, Goethe-Universität Frankfurt am Main
Author: Jason Selvarajan, B.Sc. Environmental Engineering, Metropolia University of Applied Sciences, Finland
Pioneers into Practice Programme 2014, Climate-KIC Centre Hessen
Host: Facility Management Unit of Campus Westend
Reporting period: May 2nd 2014 - June 6th 2014
36
DONE !
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 37
6LFKXDQ�-R\RX�*URXS6LFKXDQ�-R\RX�(QHUJ\�VDYLQJ�7HFKQRORJ\�&R���/WG
$GG���5RRP������&HQWUDO�EOGJ���2SWRHOHFWULF�,QGXVWULDO�3DUN��1R������6HF�����&KDQJFKHQJ�5G���6KXDQJOLX�&RXQW\�&'��6LFKXDQ��&KLQD
,7(0�12� 1$0( '(6&5,37,21 3,&785(881,7�35,&(��86'�
3&6�
&HO��������������������������7HO����������������������������������������)D[᧶���������������&RQWDFW᧶&DURO����������6N\SH��FDUROEDQT�����������(PDLO�061᧶FDURO#MR\RX�JURXS�FRP
JY - AG19G12-10WA
G12 led light
Power: 10WLED Qty: 108 pcs
Voltage: AC85-265VFrequency:50/60HZ
Material: AlumLED Type: smd 2835
Lumens: 1100lmBeam Angle: 360°
Working Temp: -20ć~+45ć
$10.54Working Temp: 20ć 45ć
CCT: 2700-7000KCRI: 70<Ra<85
Size: ĭ30*103mmWarranty: 2 years
Packing: 100 pcs / box
Power: 10WLED Qty: 102 pcs
JY - AG19G12B-10WA
G12 led light
y pVoltage: AC85-265VFrequency:50/60HZ
Material: AlumLED Type: smd 5050
Lumens: 1100lmBeam Angle: 360°
Working Temp: -20ć~+45ćCCT: 2700-7000K
CRI: 75<Ra<85Si ĭ30*108
$12.46
Size: ĭ30*108mmWarranty: 2 years
JY - AP30G12-20WA
20w par30 g12led light $21.08
Power: 20 /30 /40 WLED Qty: 12 pcs
JY - AP30G12-30WA
30w par30 g12led light $23.00
LED Qty: 12 pcsVoltage: AC85-265VFrequency:50/60HZMaterial: Alum + PC
LED Type: 3030 (imported)Lumen efficiency: 78lm/WBeam Angle: 25 / 45 / 60°
Working Temp: -20ć~+45ćPF:0.95
CCT: 2700-7000K
JY - AP30G12-40WA
40w par30 g12led light $23.96
CRI: 75<Ra<85Size: ĭ90*120mmWarranty: 3 years
Above price For EXWValidity: 30 daysPacking: Neutral packing
Very fast response
http://www.remlux.de/produkte-1/led-kompaktlampe-plc/
Less trapped light with this design
This focused beam might work with Type A lights!
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 38
0
5625
11250
16875
22500
Lamp type
Comparison of Lamp A and B to All Other Lamps
Pow
er C
onsu
mpt
ion
of L
amps
Current
With LED
Chart 1
A and B C, D, E, F, G and H Total
50% energy saving!
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 39
Lamp type Name Power (W)Power
Consumption (W) or /(kWh)
per 1000h
Luminous efficiency
(lumen/watt)Socket
Bulb Length (mm)
Initial Lumens
Lifespan (h) based on
B50?
Lifespan single
numberColor temp (Kelvins)
Lamp changes / 10 years (4300 h/
year)
Lamp cost $?
A
B
<B>
REMLUX (uni has these
VR II 70 80 92 G12 19 x 100 7400 12000-15000 14000 3000 3 10
PHILIPS CDM-T Replacement G12 Led Bulb
10 10 110 G12 30 x 100 1100 35000 35000 3000 1 10
Novara B / Novara VRB 26 26 69 G24q-3 120 1800 12000 12000 3500 4 6
G12-10W 11 11 12 G24q-3 130 1000 50000 50000 3500 1 10
HPL-N 125W/542 11 11 64 G24q-3 130 700 50000 50000 4250 1 30
Calculate Energy Savings by using LEDs
Might be too low... I would recommend trying this and the 20, 30 and 40 watt bulbs with
spotlight designs
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan 40
Maintenance & Running costs per year Savings (€) / year Initial Cost Expected ROI /years
TOTAL 9020 4190 0.5
Changing lamps A and B to LEDs
Maintenance cost / 10
years
Maintenance cost /
year
Operating cost / 10
years
Total Running Cost /10
years
Total Running
Cost / year
Number of lamps
Maint & Running costs per
year
Savings / year Initial Cost Expected
ROI /years Bulb link Other link
31 3 662 695 70 128 9294 0 0 http://www.radium.de/en/products/metal-halide-lamp-ceramic-burner-rcc-t-70wwdl230g12http://www.radium.de/en/products/metal-halide-lamp-ceramic-burner-rcc-t-70wwdl230g12
12 1 82 96 10 128 1385 7909 1280 0.2 http://www.jzl-led.com http://www.alibaba.com/product-detail/PHILIPS-CDM-T-Replacement-G12-Led_1801292018.html?s=p
22 2 214 238 24 97 2516 0 582 http://www.1000bulbs.com/product/2805/FC26-G24Q335OD.htmlhttp://www.hessamerica.com/Products/Lighting/Illuminating_Bollard/NOVARA_/?variant=3452378489781
9 1 91 100 10 97 1054 1462 970 0.7 http://www.xinxuantech.com; http://xinxuantech.en.alibaba.com Shenzhen Xinxuan Technology Co., Ltd
26 3 91 119 12 97 1405 1111 2910 2.6 http://www.remlux.de/produkte-1/led-kompaktlampe-plc/http://www.remlux.de/produkte-1/led-kompaktlampe-plc/
Two leds were chosen. The Philips CDMT to replace lamp type A and G12 -10 to replace
lamp type B
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
The Plan
41
Modernizing is really inexpensive and relatively fast to perform
The ROI is within the bulb warranty
Risk is low, gain is high
Purchase sample bulbs from Chinese Suppliers (3-4) and redo what I did with Uli with different
light fixtures
Test for quality and
performance
Order and replace old bulbs with new LEDs
Win
Wednesday, May 28, 14
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 Jason Selvarajan
Inventory & Modernization of Exterior Lighting at Campus Westend 28.05.2014 - Jason Selvarajan
Thoughts...
42
• Point lights towards the foot path, not the grass
• Optimize system for locating and changing broken lamps
• Use Mapbox to track bulb lifetime
• Use Mapbox to track changes (if no other system is in use)
Wednesday, May 28, 14
Danke Schön
43
I am extremely grateful for this opportunity to learn and hopefully make an impact on both the Facility Management Unit and ALL of campus Westend.I’ve met several students from this campus and even people wanting to study here and everyone shows interest and support for my project.
Wednesday, May 28, 14
SPECIAL THANKS
44
Dirk Seitz for getting the project goingMilan Bosnjak for SAUTER & KNX Dieter Dreher for technical drawings and bulb informationRainer Born for LED lamps and toolsUli Ackerman guidance and support for installation of 14 LED lampsSteffi Lebedew for the DienstfahradNadja Fabel for making me speak a little GermanUwe Brede for interesting conversations and tours of the campus.Christoph Denecke & Detlef Wittwer for the initial/outline of the project at Campus Westend
+ Everyone ElseSaaba for keeping my office neat :)
...also Super Bonus Double Thanks to Christoph Denecke for all his help and advice throughout the project (making introductions, translating everything, guiding & clarifying my questions and showing me around the campus and Frankfurt.- if this project is a success it is because of your kindness!
Wednesday, May 28, 14