Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

36
introduction market analysis design & construction entitlements financial conclusions c
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    213
  • download

    0

Transcript of Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

Page 1: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c

Page 2: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c

505 CONGRESS STREETA VISION FOR SOUTH BOSTON

Page 3: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c

505 CONGRESS STREETA VISION FOR SOUTH BOSTON

tatsuyuki ariizumi

kristy wang

hasan halkali

jong yoon lim

leo shieh

paul stewart

Page 4: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusionsintroduction

Agenda

Market Analysis

Entitlements

Design & Construction

Financial

Conclusions

Page 5: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

1. Introduction:

- Site orientation (maps, photos)

- Overall program (number units, young professionals, new neighborhood…)

introduction

Page 6: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

market analysis

Page 7: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

2. Market Analysis:

- Market overview (economy, population… briefly)

- alternative uses (condo justification)

- Market study (mkt area, demand supply, submkt)

- marketability of our product

- general program inspired in comps

Issues KW- read write up, why each data is useful, convincing- projections forward

market analysis

Page 8: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

entitlements

Page 9: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

What we don’t want to happen…

The Boston Harbor AssociationSave the Harbor/Save the Bay

City of Boston Office of Civil RightsThe Children’s Museum

Artery Business CommitteeBoston Shipping Association, Inc.

Dorchester Heights AssociationGreater Boston Chamber of CommerceUMass/Boston: Urban Harbors Institute

National Park ServiceFort Point Cultural Coalition

Fort Point Arts CommunityAdaptive Environments

Conservation Law FoundationBoston Society of Architects

Boston Natural Areas NetworkBoston Harbor Island Alliance

Seaport Alliance for a Neighborhood Design

Walk BostonMassachusetts Bicycle Coalition

entitlements

Page 10: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Zoning

South Boston Waterfront IPOD (Article 27P)

General Use

FAR: 4.0

SCR: .50

Height: 150’

Parking: ~ .70 - 1.5

Proposed

Multifamily Residential

FAR: 5.95 (overall) / 4.94 (ex. parking)

SCR: .60

Height 250’

Parking: .70

entitlements

Page 11: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Development Review (Art. 80)

Multi-phase process

Site plan

Urban design

Historic resources

Infrastructure systems

Transportation

Environmental protection Areas of potential concern

Building area limits

Construction staging

Parking…

entitlements

Page 12: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Entitlements issues

Affordable Housing

Set aside of 14% of units

Moderate income households: 80% AMI

Public Benefits

Road work & offsite mitigation: $300K set aside

Property taxes: 40x increase from current tax revenue

Other

Strong public interest in jumpstarting development

No abutters, small parcel = less scrutiny & opposition

Schedule

Eighteen months allocated

entitlements

Page 13: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

design & construction

Page 14: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

that building looks really familiar…

design & construction

Page 15: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Site Orientation

Direct connection to downtown

Three blocks to waterfront

One block to Silver Line

Plaza faces Conv. Ctr & T stop

Secluded garden on West side

Tower looks away from vent bldg

Parking as buffer to rear

north

design & construction

Page 16: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Trees for summer shade

Retail facing plaza

Generous storage area

Parking hidden from st.

Private Entrances

Secluded garden

design & construction

Page 17: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Deck, outdoor barbecue

Multi-use space

Movie theater

Gym

design & construction

Page 18: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Signature curtainwall used sparingly

Efficient precast cladding

Shared rooftop garden

Brick and metal panel cladding

Parking abuts I-90 ramp

Rooftop garden

Generous glazing at duplexes

Pedestrian scale on Congress St

design & construction

Page 19: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Lower tier 8’-6” ceilings

Fan coil HVAC system

Laminate & tile floors

Shared laundry

Standard kitchens

design & construction

Page 20: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Middle tier 8’-6” ceilings

Fan coil HVAC system

Hardwood & tile floors

In-unit laundry

Granite counters

design & construction

Page 21: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Upper tier 10’-0” ceilings

Radiant + forced air HVAC systems

Hardwood & stone floors

In-unit laundry

European appliances

design & construction

Page 22: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Unit mix & rents

Unit type % of total Avg sq ft Avg rent / mo

Studio 22% 453 $1,525

One Bed 27% 581 $1,950

One Bed + den 22% 848 $2,325

Two Bed 23% 999 $2,675

Two Bed duplex 5% 1,006 $3,875

Three Bed 2% 1,452 $4,925

design & construction

Page 23: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

5. Construction Budget:

Hard costs $36.03M

Base building including site work $200 / gsf

Parking, average $20,000 / space

Contingency 3% of hard cost

Soft costs $6.67M

Design & legal fees 8% of hard cost

Development fee 2% of hard cost

Leasing fee 2% of hard cost

Other 6% of hard cost

Contingency 5% of soft cost

Construction loan interest $1.49M

Land acquisition $7.00M

Total development cost $283 / gsf $51.19M

design & construction

Page 24: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Duration(months) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

PROJECT 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Entitlements 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

BRA Scope Determination 4 1 1 1 1

Project Impact Approval 4 1 1 1 1

BRA Adequacy Determination 4 1 1 1 1

Building Permit 6 1 1 1 1 1 1

Task

design & construction

Page 25: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Duration(months) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

PROJECT 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Entitlements 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

BRA Scope Determination 4 1 1 1 1

Project Impact Approval 4 1 1 1 1

BRA Adequacy Determination 4 1 1 1 1

Building Permit 6 1 1 1 1 1 1

Design 12 1 1 1 1 1 1 1 1 1 1 1 1

Schematic Design 3 1 1 1

Design Drawings 3 1 1 1

Construction Drawings 6 1 1 1 1 1 1

Final Construction Drawings 4 1 1 1 1

Task

design & construction

Page 26: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Duration(months) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

PROJECT 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Entitlements 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

BRA Scope Determination 4 1 1 1 1

Project Impact Approval 4 1 1 1 1

BRA Adequacy Determination 4 1 1 1 1

Building Permit 6 1 1 1 1 1 1

Design 12 1 1 1 1 1 1 1 1 1 1 1 1

Schematic Design 3 1 1 1

Design Drawings 3 1 1 1

Construction Drawings 6 1 1 1 1 1 1

Final Construction Drawings 4 1 1 1 1

Contractor Buyout 4 1 1 1 1

GC Bid & Award 2 1 1

Subcontractor Buyout 2 1 1

Task

design & construction

Page 27: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Duration(months) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

PROJECT 34 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Entitlements 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

BRA Scope Determination 4 1 1 1 1

Project Impact Approval 4 1 1 1 1

BRA Adequacy Determination 4 1 1 1 1

Building Permit 6 1 1 1 1 1 1

Design 12 1 1 1 1 1 1 1 1 1 1 1 1

Schematic Design 3 1 1 1

Design Drawings 3 1 1 1

Construction Drawings 6 1 1 1 1 1 1

Final Construction Drawings 4 1 1 1 1

Contractor Buyout 4 1 1 1 1

GC Bid & Award 2 1 1

Subcontractor Buyout 2 1 1

Construction 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Sitework 2 1 1

Foundations 3 1 1 1

Parking Deck Superstructure 3 1 1 1

Tower Structure 5 1 1 1 1 1

MEP & Fire Protection 9 1 1 1 1 1 1 1 1 1

Building Envelope 8 1 1 1 1 1 1 1 1

Roofing 2 1 1

Interior Finishes 8 1 1 1 1 1 1 1 1

Landscaping 2 1 1

Task

design & construction

Page 28: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

Duration(months) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

PROJECT 43 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Entitlements 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

BRA Scope Determination 4 1 1 1 1

Project Impact Approval 4 1 1 1 1

BRA Adequacy Determination 4 1 1 1 1

Building Permit 6 1 1 1 1 1 1

Design 12 1 1 1 1 1 1 1 1 1 1 1 1

Schematic Design 3 1 1 1

Design Drawings 3 1 1 1

Construction Drawings 6 1 1 1 1 1 1

Final Construction Drawings 4 1 1 1 1

Contractor Buyout 4 1 1 1 1

GC Bid & Award 2 1 1

Subcontractor Buyout 2 1 1

Construction 18 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Sitework 2 1 1

Foundations 3 1 1 1

Parking Deck Superstructure 3 1 1 1

Tower Structure 5 1 1 1 1 1

MEP & Fire Protection 9 1 1 1 1 1 1 1 1 1

Building Envelope 8 1 1 1 1 1 1 1 1

Roofing 2 1 1

Interior Finishes 8 1 1 1 1 1 1 1 1

Landscaping 2 1 1

Lease up 9 1 1 1 1 1 1 1 1

Task

design & construction

Page 29: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

financial

Page 30: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

6. Financial:

- assumptions

- holding period (property management)

- property level

- deal structure

- investment level

- sensitivity

Issues JY- bridging finance for lease-up period- holding period (better return if we keep it after stabilized)

jy

financial

Page 31: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

7. Conclusions:

- potential challenges

- good opportunity for everybody

- yanni, we’re buying the site

jy

conclusions

Page 32: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c

Page 33: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c

Page 34: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c

tatsuyuki ariizumi

kristy wang

hasan halkali

jong yoon lim

leo shieh

paul stewart

Page 35: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c505 CONGRESS STREETA VISION FOR SOUTH BOSTON

Page 36: Introductionmarket analysisdesign & constructionentitlementsfinancialconclusions c.

introduction market analysis design & constructionentitlements financial conclusions

c