Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides...

74
Pakistan Donor Profiles UNRCO

Transcript of Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides...

Page 1: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Pakistan Donor Profiles

UNRCO

April, 2015

Page 2: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Contents

Introduction....................................................................................................................................................3

Summary of Donor Profiles...........................................................................................................................4

Detailed Donor Profiles:................................................................................................................................7

Asian Development Bank..........................................................................................................................7

Australian Department of Foreign Affairs and Trade (DFAT)................................................................11

Department of Foreign Affairs, Trade and Development (DFATD).......................................................14

UK Department for International Development (DFID).........................................................................17

The Netherlands.......................................................................................................................................21

The European Union (EU).......................................................................................................................24

Norway.....................................................................................................................................................26

Germany...................................................................................................................................................29

Japan International Cooperation Agency (JICA).....................................................................................34

Swiss Development Cooperation (SDC).................................................................................................37

US Agency for International Development (USAID).............................................................................40

The World Bank.......................................................................................................................................46

International Fund for Agricultural Development...................................................................................50

Korea International Cooperation Agency (KOICA)................................................................................52

Page 2 of 53

Page 3: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Introduction

In order to gain a better understanding of the programmatic focus of the donor community and funding trends in Pakistan, a comprehensive mapping of donor activities and the development of donor profiles was undertaken. This compendium will support the donor community to promote overall donor coordination efforts in accordance with OECD DAC aid effectiveness and good donorship principles. It is hoped that improved knowledge of which donors are active in which sectors and parts of the country will help avoid duplication of efforts and allow potential synergies to be highlighted. The donor profiles will also serve to inform the UN’s resource mobilization efforts.

In order to gain a holistic picture of the donor landscape, both development and humanitarian support is included in the profile. Information on loans as well as grants is included wherever possible. However, funding channeled through public diplomacy or political departments of embassies is not included. Where possible, the donor profiles include the sectors of engagement, geographical focus, type of funding, projects, implementing partners and overall investments. Not all donors have provided the same level of information, hence information disparities do exist.

It should be noted that this is a dynamic document. The donor profiles will be reviewed and updated on a regular basis in order to provide as up-to-date information as possible.

Methodology: A two-pronged methodology was adopted to gather the information on donor activities. In the first instance, a desk review of existing information available on donor websites and donor profiles compiled by different UN agencies, funds and programmes was carried out. This information was then expanded upon and revised through conducting individual interviews and meetings with the donor organizations. The collaboration of all partners included in this compendium has been much appreciated. Based on the information collected, two categories of information are being compiled and documented:

1. A profile of each donor summarizing key programmatic focus as per their country programmes, sector focus, geographical presence, and funding priorities and allocations.

2. A complete compendium of donors’ programmes and funding (which is being compiled separately).

The mapping and profiling was carried out in two phases. In the first phase, the study focused on major traditional donors like the Asian Development Bank (ADB), the Australian Department of Foreign Affairs and Trade (DFAT; formerly AusAID), the Canadian Department of Foreign Affairs, Trade and Development, the European Union (EU), the United Kingdom’s Department for International Development (DFID), the Japan International Cooperation Agency (JICA), Norway, the Netherlands, the Swiss Development Cooperation (SDC), the United States Agency for International Development (USAID) and the World Bank, which are presented in this document. In the second phase, other non-traditional donors, including, for example, the Gulf States, nonresident donors, INGOs, and leading private sector entities providing resources to Pakistan directly or through corporate social responsibility, will be covered.

This is a living document and will be updated over time. Information presented in this document is shared with donors for their feedback and revalidation, and the document will be revised based on the information update available.

Page 3 of 53

Page 4: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Summary of Donor Profiles

Donor Sectors /Thematic Areas Funding Details Total Budget (US$)*

Timeframe Geographical Focus

Asian Development Bank (ADB)

1. Investment and reforms in energy and infrastructure

2. Reforms to strengthen governance and promote structural transformation

3. Development of urban services

4. Effective implementation of projects and programs and capacity building

ADB’s indicative resources; including US$ 720 million Asian Development Fund (ADF) and US$ 1,460 million Ordinary Capital resource (OCR).

$2,180 Two year period, 2013–2014

Nation-wide

Australian Department of Foreign Affairs and Trade (DFAT, formerly AusAID)

1. Education and health2. Humanitarian and disaster

preparedness and response3. Economic development4. Governance5. General development support

Australian Aid Program $87.9M, OGD $4.2M

$92.1 2013-2014 Nation-wide, specifically under-privileged and remote areas

Department of Foreign Affairs, Trade and Development (DFATD)

1. Protecting children and youth2. Sustainable economic growth3. Governance

Development and Humanitarian

C$ 62.97 million

April 2012 to March 2013

Nation-wide

UK Department for International Development (DFID)

1. Building peace and stability2. Making democracy work3. Promoting macroeconomic

stability, growth and jobs4. Effective delivery of public

services

DFID allocation for 2013-14 was £260 million

$432.82 2013-14 Nation-wide

The Netherlands 1. Human security, rule of law and human rights

2. Promotion of trade and investment under the slogan: from aid to trade

Development and Humanitarian

$62.26 2012 Malakand Division of Khyber PakhtunKhwa province

European Union (EU) 1. Livelihood2. Formal & vocational Education

Development Cooperation

$544.50 2007-2013 Nation-wide especially areas affected by natural and manmade disasters

Norway 1. Fight poverty and bring about social justice

2. Governance3. Education4. Rural development, women

and gender equality and

Annual development budget NOK 100 million

$16.38 2013 Nation-wide, specifically neglected Areas

Page 4 of 53

Page 5: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Donor Sectors /Thematic Areas Funding Details Total Budget (US$)*

Timeframe Geographical Focus

human rights5. Culture, peace and

reconciliation; disaster prevention and preparedness

Germany 1. Governance2. Energy3. Education and vocational

training4. Health

Development 906.94 2009-2014 Nation-wide with a focus on KP & FATA

Japan International Cooperation Agency (JICA)

1. Ensuring human security and human development

2. Development of sound market economy

3. Achievement of balanced regional socio-economic development

Technical Cooperation Expenses

$18,927 2011 Nation-wide, specifically neglected Areas

Swiss Development Cooperation (SDC)

1. Promotion of micro enterprises through finance and vocational education

2. Support to sustainable practices regarding the use of natural resources.

3. Promotion of human rights and education, specifically the education of women and girls

Development and Humanitarian

$16.24 Annual Nation-wide with a focus on Khyber PakhtunKhwa, FATA and Northern areas

US Agency for International Development (USAID)

1. Increasing the capacity and efficiency of the power and energy sector

2. Fostering private sector-led economic growth and agriculture

3. Supporting stabilization efforts in regions susceptible to activity by violent extremists, particularly on the border with Afghanistan

4. Increasing access to and the quality of education

5. Health care

Civilian Assistance $ 2,670 million and Emergency Flood Response 1,157 million

$3,827.30 2009-2013 Nation-wide, especially underrepresented geographic areas, like Balochistan, the Northern Areas, Gilgit-Baltistan and AJK

World Bank 1. Economic governance2. Human development and

social protection3. Infrastructure to support

growth4. Security and reducing the risk

of conflict

$4.0 billion in new IDA/IBRD lending over FY 2012-14, Multi-Donor Trust Fund: $140 million for conflict-affected areas

4140 FY 2012-14 Nation-wide, (including Khyber PakhtunKhwa, FATA and Balochistan)

IFAD Rural Poverty Alleviation through empowering poor rural women

IFAD Country allocations are based

USD 90 million

2012-15 National

Page 5 of 53

Page 6: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Donor Sectors /Thematic Areas Funding Details Total Budget (US$)*

Timeframe Geographical Focus

and men to achieve higher incomes and improved food security:1. enhance the access of poor

rural men and women to productive assets, skills, services and improved technologies, with particular emphasis on productivity enhancement;

2. To strengthen the capacity of the rural poor to engage in and benefit from local development processes.

on Performance based Allocation System. IFAD financing consists of low-interest loans and grants. Loan to Pakistan are provided at 0.75% service charge with 40 years repayment period including a 10 year grace period.

KOICA 1. Agriculture and rural development

2. Health3. Water and sanitation4. Education5. Industries (i.e. Textile,

agriculture) and energy science and technology

6. Disaster Relief

KOICA Pakistan provides about 10 million U$ of grant aid. The sectors are given in the CSP 2014 and ongoing CSP 2015-16.

US 42.5 Million

1991 - 2013 Punjab with strategic focus on a comprehensive agriculture and rural development by introducing and adopting Korean development experiences.

*Note: Donor contributions have been converted into US$ million for data standardization purposes.

Page 6 of 53

Page 7: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Detailed Donor Profiles:

Asian Development Bank

Since its establishment in 1966, ADB has worked in Pakistan for improving people’s lives. By targeting potential investments in partnership with developing member countries and other stakeholders, ADB strives to alleviate poverty and helps to create an environment in which people can share the benefits of sustained and inclusive growth. ADB assists developing member countries to evolve into thriving modern economies, which are well integrated with each other and the world.

Thematic focus: ADB works with the government and the private sector to improve Pakistan’s economy and inclusive growth. Aligned with national development objectives, ADB’s partnership priorities aim to attract investment, create industries and jobs, and improve the quality of citizens’ life while focusing on the following areas:

1. Investment and reforms in energy and infrastructure2. Reforms to strengthen governance and promote structural transformation3. Development of urban services4. Effective implementation of projects and programs and capacity building

Geographical Focus: ADB programs have a nation-wide outreach in Pakistan.

Country Programme Strategy: The Country Partnership Strategy (CPS) for Pakistan defines ADB's strategic approach for 2009-2013 and is aligned with Pakistan’s own Development Strategy 2020. The ADB's comparative strengths complement efforts of other development partners. Based on the aforementioned thematic areas, the strategy provides the framework for ADB's partnership priorities and the future direction of its assistance to the country.

The Country Operations Business Plan (COBP 2013-2014 OBP) for Pakistan describes the consistency of the business plan with the country partnership strategy (CPS 2009-2013). The CPS 2009–2013 is in accordance with ADB’s Strategy 2020 and the COBP retains this focus.

Programs and Projects: ADP has 144 approved technical assistance projects in Pakistan, which are at different stages of implementation. 18 new public and private sector projects are proposed for approval.

ADB support for reforms and investments in key infrastructure sector programmes include power and energy, transport (including the National Trade Corridor) and water resources. This assistance will reduce the cost of doing business in Pakistan and strengthen the underlying competitiveness of the economy. Support for a new generation of economic reforms will be provided by reducing distortions, accelerating market creation as well as addressing governance and institutional bottlenecks.

Pakistan is one of the largest recipients of ADB’s private sector development assistance with over $ 1 billion approved equity investments, loans (including co-financing) and guarantees. In line with ADB’s Country Partnership Strategy, power and energy infrastructure projects are among the key priority sectors for ADB’s private sector operations in Pakistan. The ongoing portfolio comprises three domestic

Page 8: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

gas-based thermal independent power projects, including Pakistan's first private sector hydropower project, the first privately owned wind power project, a privatized electricity utility, and an equity fund.

Province / Region

Project Name Project Budget (US$ million)

Project Start Date

Project End date

Federal MFF-Power Transmission enhancement Investment Programme-Tranche 1

10.449 2006 2017

Federal MFF-Power Transmission enhancement Investment Programme - Proj II

170 2007 2014

Federal Power Transmission Enhancement Investment Programme -Tranche 3

243.24 2011 2016

Federal MFF-National Highway Development Sector Investment Programme - Proj 2

230 2009 2014

Federal MMF-Power Distribution Enhancement Investment Prog. Tranch 1- Support Project

9.407 2008 2018

Federal MFF-Power Distribution Enhancement Investment Programme-Tranche 2

172.3 2010 2015

Federal MFF-Power Distribution Enhancement Investment Programme-Project 3

245 2012 2016

Federal MFF-Power Distribution Enhancement Investment Programme-Tranche 4

167 2013 2017

Federal MFF-National Trade Corridor Highway Investment Programe - Project 1

170 2007 2014

Federal MFF- Energy Efficiance Investment Programme - Tranche 1

40 2009 2014

Federal MFF- Energy Efficiance Investment Programme - Tranche 1

19.654 2009 2017

Federal Social Protection Development Project 436.629 2013 2019

Federal Jamshoro Power Generation Project 840 2013 2019

Federal Jamshoro Power Generation Project 30 2013 2024

Federal Jamshoro Power Generation Project 29.819 2013 2019

Federal / Sind

Component A and B: National Highways and Provincial Roads

415.522 2011 2014

Federal / Sind

Component C: Irrigation and Drainage and Flood Protection

167.875 2011 2014

Punjab/KP MFF-Renewable Energy Developmet Sector Intvestment Programme - Project 1

126.605 2006 2014

Punjab/KP MFF-Renewable Energy Developmet Sector Intvestment Programme - Project 1

5.466 2006 2014

Punjab MFF-Punjab Irrigated Agriculture Investment Programme - Project 1

222.489 2006 2015

Punjab MFF-Punjab Irrigated Agriculture Investment Programme - Project 1

10.357 2006 2015

Page 8 of 53

Page 9: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget (US$ million)

Project Start Date

Project End date

Punjab Punjab Irrigated Agriculture Investment Programme (Tranche 2)

265.129 2011 2016

Punjab MFF-Punjab Irrigated Agriculture Investment Programme - Project 3

73 2012 2017

Sind MFF-Sindh Cites Improvement Investment Programme - Project 1

39.377 2008 2014

Sind MFF-Sindh Cites Improvement Investment Programme - Project 2

25.1 2012 2017

Sind MFF-Sindh Cites Improvement Investment Programme - Project 2

74.392 2012 2017

Sind Flood Emergency Reconstruction Project 48.127 2011 2014

Implementing Partners: As a multilateral development bank, ADB collaborates with the Government of Pakistan and the State Bank of Pakistan. Through the implementation of its microfinance lending and technical assistance, ADB has also entered into partnerships with the Khushhali Bank, the Bank of Khyber and a number of NGOs involved in microfinance in the country.

Funding Allocation: ADB’s indicative resources for the two year period, 2013–2014, are US$ 2,180 million, including US$ 720 million Asian Development Fund (ADF) and US$ 1,460 million Ordinary Capital resource (OCR).

The total firm lending program proposed for Pakistan in 2013–2014 amounts to US$ 2,468 million (US$ 1,108 million ADF, US$ 1,360 million OCR) for 17 loans in the priority sectors, an annual average of $1,234 million a year. About 55% of this (and 90% of OCR) lending will be provided through multi-tranche financing facilities (MFFs). The non-lending technical assistance program for 2013–2014 currently stands at about US$ 10.05 million for 14 projects and mainly comprise of project preparatory technical assistance. Efforts will be made to mobilize co-financing for technical assistance projects.

As of December 2012, total ADB’s lending facility to Pakistan amounted to US$ 22,571.89 million as per following sectoral distribution:

Page 9 of 53

Page 10: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Funding Mechanism: ADB provides funding to Pakistan by using lending, non-lending and cost-sharing arrangements. The main devices for assistance are, however, loans, grants, policy dialogue, technical assistance and equity investments.

Page 10 of 53

Page 11: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Australian Department of Foreign Affairs and Trade (DFAT)1

DFAT works with the governments of developing countries to help them improve the way they deliver economic and community services. The aid is delivered to support the delivery of goods and services (e.g. humanitarian relief, building health clinics and schools, immunizing children), building national institutions and capacities, and initiating policy dialogue and reform by engaging local counterparts in government, civil society and business.

Thematic Focus: DFAT programme support is primarily focused on the following sectors:

1. Education and Health2. Humanitarian and disaster preparedness and response3. Economic development4. Governance 5. General development support

Geographical Focus: DFAT works in all geographical areas of Pakistan with a more focused approach towards under-privileged and remote areas of the country.

Country Programme Strategy: The Governments of Australia and Pakistan signed the Partnership in October 2011. Aid to Pakistan supports efforts to maintain stability and democratic governance, and achieve economic development and poverty reduction in line with the Millennium Development Goals (MDGs). It focuses on three primary sectors: health, education and economic development (agriculture and rural development). Issues related to governance and emergency management response are secondary in its priorities. However, underpinning Australia’s aid program in Pakistan is support to gender equality.

Programmes and Projects: DFAT has invested US$ 297.4 million in Pakistan over the previous three years. Its investment has contributed to important development results such as:

1. Training of 8,966 community midwives in rural areas of Khyber PakhtunKhwa since 2008. Over 4,800 of these women have already been deployed to serve the community

2. Providing free textbooks for 1.56 million children and stipends for 146,560 girls in middle and high school

3. Performing over 13,000 cataract surgeries and treating more than 52,700 people for eye-related diseases.

During 2012-13, DFAT has provided US$ 85.7 million in development assistance to Pakistan for:

a. Screening up to 200,000 children for malnutrition and provide nutrition support for up to 180,000 women.

b. Improving the quality of education in 584 schools in Balochistan, Gilgit-Baltistan and Khyber PakhtunKhwa covering more than 145,000 children.

1 In November 2013, the Australian Agency for International Development (Australian AID) ceased to be an executive agency and was integrated into the Department of Foreign Affairs and Trade.

Page 11 of 53

Page 12: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

c. Basic work skills training (such as carpentry and plumbing) for more than 1,600 people and support 150 new community organizations to implement community infrastructure projects such as road and bridge repair, irrigation and drinking water supply.

Province / Region

Project Name Project Budget USD

Project Start Date Project End date

National Australian Development Scholarships

$ 9.00 2014 2014

KP Khyber Pakhtunkhwa Education Capacity Development Plan

$7.90 2011 2015

KP Early Childhood Care and Education in Khyber Pakhtunkhwa

$14 2011 2014

KP Communication for Effective Social Service Delivery (CESSD)

$3.67 2011 2016

Balochistan and KP

Agriculture Sector Linkages Program (ASLP) Phase II

$12.90 2010 2015

Balochistan Support to Maternal and Child Health in the Border Areas

$13.60 2012 2015

Implementing Partners: DFAT programs are mutually agreed upon by the governments of Australia and Pakistan. These programs are implemented in partnership with government organizations, multi-lateral development organizations, donors, non-governmental organizations (NGOs), academia, media, volunteers, and the private sector.

Funding Allocation: DFAT allocated US$ 96 million for Pakistan in 2012-13. Out of this funding, US$ 74 million were allocated for emergency assistance and reconstruction, US$ 6.6 million were earmarked for agriculture sector linkages programmes and US$ 10 million were allocated for human rights projects. A separate allocation of US$ 120 million was made for IDPs.

DFAT has an estimated budget of US$ 87.9 million for 2013-14, which will be spent on priority sectors as per following allocations:

Page 12 of 53

Page 13: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

An overview of DFAT development assistance to Pakistan from 2001-02 to 2013-14 as follows:

Funding Mechanism: DFAT provides funding to Government of Pakistan mostly in the form of development grants.

Page 13 of 53

Page 14: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Department of Foreign Affairs, Trade and Development (DFATD)2

Canada and Pakistan share a long history of development cooperation with an aid program that stretches back to the Colombo Plan of 1951. Canada’s bilateral relationship with Pakistan pursues a broad range of mutual interests including: development cooperation, people-to-people linkages, regional security, defense, good governance, human rights, trade and investment.

Thematic Focus: Canada’s bilateral development program in Pakistan is aligned with the Government of Pakistan priorities and focuses on: 1) Children and youth with an emphasis on improved basic education through teacher training; 2) Sustainable economic growth with an emphasis on women’s economic empowerment; and 3) Improved governance through accountable public institutions.

In addition, Canada is supporting initiatives to strengthen routine immunization and health systems in Pakistan as part of its commitment to support the global effort to eradicate polio.

Geographical Focus: Canada works in all geographical areas of Pakistan.

Country Programme Strategy: Canada’s development cooperation program of Pakistan is outlined in the 2009-2014 Bilateral Cooperation Strategy.

Programmes and Projects: Canada’s key bilateral projects as of July 2014 are listed below:

Province / Region Project Name Project Budget CDN$(Millions)

Project Start Date

Project End date

National Country Planning and Analysis Fund $ 0.5 2007 2015National Strategic Technical Assistance

Response Transfer Fund$ 3 1996 2014

National Polio Plus for Pakistan $20 2013 2015National Debt for Education Conversion $132.63 2006 2015National Pakistan Electoral System Support $8 2013 2016Balochistan Balochistan Responsive Fund $4.95 2007 2015National Promoting Employment for Women $8 2010 2015Gilgit Baltistan, Khyber Pakhtunkhwa

Enhancing Employability and Leadership for Youth

$16 2011 2017

Azad Jammu and Kashmir

Rebuilding Sustainable Communities $20 2007 2015

Punjab and Sindh Financial Literacy and Business Development Services for Women

$9.2 2011 2016

Punjab and Sindh Community Infrastructure Improvement

$15.4 2010 2015

2 In June 2013, the Canadian International Development Agency (CIDA) and the Department of Foreign Affairs and International Trade (DFAIT) were merged to form the Department of Foreign Affairs, Trade and Development (DFATD)3 The Debt for Education Conversion is a debt swap managed by DFATD on behalf of the Department of Finance. Apart from monitoring and evaluation, there are no fund flows from DFATD’s aid budget to support this initiative.

Page 14 of 53

Page 15: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region Project Name Project Budget CDN$(Millions)

Project Start Date

Project End date

Gilgit Baltistan, Balochistan and Sindh

Strengthening Teachers Education Programme

$11.6 2007 2015

In addition to the above projects, Canada also programs in Pakistan through its Multilateral and Global Programs Branch and Partnership for Development Innovation Branch.

Through its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada has provided over C$100 million in humanitarian assistance to Pakistan, through experienced partners such as the United Nations, the International Red Cross and Red Crescent Movement and Canadian non-governmental organizations. This assistance was provided in response to humanitarian crises arising from ongoing conflict between the Pakistani army and militant groups in the north-west of the country as well as people affected by catastrophic flooding.

Canada’s Partnership assistance consists mainly of health and human development programming, including a project with the Aga Khan Foundation of Canada focusing on health systems in several countries including Pakistan.

Implementing Partners: DFATD Development programmes and projects are implemented in partnership with government organizations, multi-lateral development organizations, donors, non-governmental organizations (NGOs), academia, media, volunteers and the private sector. CARE International, WFP, UNICEF, Aga Khan Foundation, Kashf Foundation, the International Labour Organization and the International Federation of Electoral Systems are some of the active partners of DFATD in Pakistan.

Funding Allocation: As per the most recently available financial figures, Canada’s aid to Pakistan for 2012-13 amounted to C$89.04 million4. Of this, C$62.97 million was delivered through DFATD and C$26.07 million was delivered through Finance Canada, the International Development Research Centre and the provincial and municipal governments.

DFATD’s assistance of C$62.97 million can be further broken down into C$30.76 million from Multilateral and Global Program Branch, C$20.43 from Geographic Program Branch, C$1.73 million from Partnership with Canadians Branch, C$0.47 from Foreign Affairs and Trade and $9.57 through imputed long-term institutional support through multilateral partners.

DFAIT – Development 2012-2013Geographic Branch 20.43Partnership with Canadians Branch 1.73Multilateral and Global Program Branch 30.76Imputed long-term institutional support through multilateral 9.574 Canada’s fiscal year goes from April 1st to March 31st. All figures are taken from DFATD’s web-site (http://www.international.gc.ca/development-developpement/dev-results-resultats/reports-rapports/sria-rsai-2012-13.aspx?lang=eng) and are quoted in Canadian $’s. As of Mar 31st, 2013 the Bank of Canada exchange rate was US$0.9836 to C$1.0

Page 15 of 53

Page 16: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

DFAIT – Development 2012-2013partners.Foreign Affairs and Trade 0.47Finance Canada 24.81International Development Research Centre 1.18Provinces and Municipalities 0.09

Funding Modalities: Canada development assistance is predominantly made up of grant funding and also includes debt forgiveness. In humanitarian crisis, Canada provides financial assistance to experienced partners instead of donating clothing, food or other items.

UK Department for International Development (DFID)

Page 16 of 53

Page 17: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

DFID aims at securing a constructive Pakistani engagement with the international and regional security agendas, to support sustainable development, democracy and human rights in Pakistan, to improve UK’s economic interests and to provide high-quality public services.

Thematic Focus: To achieve this objective, DFID Pakistan focuses its programme interventions on the following areas in collaboration with the Government of Pakistan:

1. Building peace and stability 2. Making democracy work3. Promoting macroeconomic stability, growth and jobs4. Effective delivery of public services

Geographical Focus: DFID has programmes and projects all over Pakistan.

Country Programme Strategy: DFID’s priorities in Pakistan from 2011 to 2015 include education, women and children’s health, creating jobs and supporting economic growth, strengthening democracy and governance, and building peace and stability in conflict-affected areas. Between 2011 and 2015, UK strives to achieve the following results:

1. Education: 9.3 million children in primary education benefitting from DFID support in Punjab and Khyber Pakhtunkhwa; support training of 90,000 teachers per year; improve the infrastructure of more than 20,000 classrooms in Punjab and Khyber Pakhtunkhwa, and 178,000 children attain basic minimum standard of literacy and numeracy in 2 school years in Sindh province.

2. Health: increase the number of additional births delivered with the help of nurses, midwives, female health visitors or doctors by one million, helping prevent 3,800 mothers dying in childbirth; prevent 340,000 children from becoming undernourished in the Punjab and Khyber Pakhtunkhwa; save the lives of 120,000 children, including 44,000 newborns, by expanding basic community level health services across the country; and help 500,000 couples chose when and how many children to have by providing access to family planning and contraceptives.

3. Economy: help 1.23 million people, more than half of them women, access microfinance loans to enable them to set up their own small business and lift themselves out of poverty; expand branchless banking so that three million people can access financial services from their mobile phones; and provide job and skills training for 40,000 people.

4. Democracy and governance: DFID support contributed to the increase in voter turnout in the 2013 general election. DFID is also working directly with provincial and district governments in Punjab and Khyber Pakhtunkhwa to improve delivery of essential services to the public including education and health.

5. Women and girls: Women and girls are at the centre of everything UK aid does. The UK’s support will support 2 million more girls in school by 2015/16; increase the number of births delivered with the help of nurses, midwives and doctors by 1 million; help 500,000 couples choose when and how many children they have; help around 700,000 women access financial services such as micro-loans; and support women’s rights in Pakistan including tackling domestic violence, empowering women to get involved in local politics, and strengthening legislation.

Page 17 of 53

Page 18: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

6. Building peace and stability: DFID has 3 programmes totaling £89.3m over 4 years, which were designed to directly respond to the Post Crisis Needs Assessment (PCNA). These comprise contributions to a World Bank-led multi-donor trust fund aimed at benefitting approximately 4.84 million people across KP, FATA and Balochistan; a programme to rehabilitate vital education and transport infrastructure – rebuilding 66 bridges and 40 schools damaged in flooding and military operations; and a programme supporting capacity building in the Rule of Law and Peacebuilding sector which will deliver 7 model police stations in KP benefitting 250,000 people.

7. Humanitarian assistance: DFID will continue to provide lifesaving humanitarian assistance when needed and promote early recovery from disasters which help communities build resilience to future shocks. The current programme includes early recovery support to the 2012 floods, response to the 2013 Baluchistan earthquake and displacement in KP/FATA.

8. Programmes and Projects: Currently DFID has 28 major programmes in Pakistan operational in different parts of the country, which will be completed during the period of next five years. The estimated cost of these programmes is £ 1.906 billion including humanitarian assistance programme of £25.8 million for 2013.

Province / Region

Project Name Project Budget USD(Millions)

Project Start Date

Project End date

National Pakistan Financial Inclusion Programme

83.7m(£50.3m)

2008 2015

National Maternal and Newborn Health 151.5m(£91.0m)

2008 2015

National Pakistan Education Task Force 4.4m(£2.7m)

2009 2014

National Education Sector Voice and Accountability Project

8.3m(£5.0m)

2010 2015

National Innovation Fund for Education 10.0m(£6.0m)

2010 2015

NationalCitizen Damage Compensation Programme

108.4m(£65.1m)

2011 2014

NationalSupporting Transparency, Accountability and Electoral Processes in Pakistan (STAEP)

19.8m (£11.9m) 2010 2014

National Transforming Education in Pakistan 33.3m(£20.0m)

2011 2016

National Humanitarian Assistance to floods 2011/2012 in Pakistan

53.1m(£31.9m)

2011 2014

NationalPakistan National Cash Transfers Programme

500.0m(£300.3m)

2012 2020

NationalPredictable Humanitarian Emergencies in Pakistan During 2013

59.8m(£35.9m)

2013 2015

National Supporting Electoral Reform in Pakistan

9.5m(£5.7m)

2012 2014

National Portfolio Risk Assurance Programme 2.5m(£1.5m)

2013 2016

Page 18 of 53

Page 19: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget USD(Millions)

Project Start Date

Project End date

National Enterprise and Asset Growth Programme

333.6m(£200.4m)

2014 2024

National Poverty and Growth Programme 7.5m(£4.5m)

2013 2021

KP Immediate Bilateral Support for Vital Transport and Education Infrastructure in Border Areas

36.6m(£22.0m)

2010 2015

KP Khyber Pukhtunkhwa Education Sector Programme

338.8m(£203.5m)

2011 2016

KP Sub National Governance - Khyber Pakhtunkhwa and Punjab

63.5m(£38.1m)

2011 2017

KP Peacebuilding Support to PCNA (PSP)

50.3m(£30.2m)

2011 2016

KP, FATA Emergency Assistance to Internally Displaced Persons in Conflicted Affected Areas of Pakistan

22.5m(£13.5m)

2013 2014

KP, FATA, Balochistan

Pakistan: Support to Multi-Donor Trust Fund (MDTF) for Northwest Frontier Region

69.1m(£41.5m)

2010 2016

KP, Punjab AAWAZ Voice and Accountability Programme

57.4m(£34.5m)

2012 2017

KP, Punjab Provincial Health & Nutrition Programme

266.4m(£160.0m)

2013 2018

Punjab Punjab Economic Opportunities Programme (PEOP)

50.0m(£30.0m)

2008 2015

Punjab Punjab School Education Programme I

133.2m(£80.0m)

2009 2014

Punjab Punjab Education Support Programme II

583.6m(£350.5m)

2013 2019

Punjab, Sindh, KP, FATA

Delivering Reproductive Health Results Programme

50.0m(£30.0m)

2012 2016

Sindh Education Fund for Sindh 71.7m(£43.1m)

2012 2018

Implementing Partners: DFID has a wide range of partnerships with government entities at national, provincial, regional and district levels. It also involves private sector, academia, media and local civil society organizations in programme implementation in addition to its strategic partnership with the World Bank in Pakistan.

Funding Allocation: DFID has a planned allocation of £260 million for 2013-14, while 2012-13, £203.1 million were spent on eight priority areas as cited below:

Project Budget total by year

Page 19 of 53

Page 20: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Funding Mechanism DFID provides funding through development grants and trust fund modalities. It also provides technical assistance in priority areas mutually agreed upon by the Governments of UK and Pakistan. DFID also provide direct budgetary support to the Government of Pakistan on a limited scale.

The Netherlands

Page 20 of 53

Page 21: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

The Dutch policy priorities for development cooperation have undergone fundamental changes in 2011 based on the findings of a study commissioned by the Dutch government, entitled “more ambition and less pretention.” According to this study, the Netherlands should reduce the number of its partner countries and focus much more on sectors where it has a comparative advantage and value added: water management, food security, rule of law and reproductive health. The study also recommends putting more emphasis on investments and trade as engines for economic growth, employment and human development.

Thematic Focus: The Dutch government also decided to refocus its support and services in the coming years in Pakistan on the following two sectors:

1. Human security, rule of law and human rights and 2. Promotion of trade and investment under the slogan: from aid to trade.

Geographical Focus: Currently, the Dutch Embassy has projects in Malakand Division of Khyber PakhtunKhwa province only.

Country Programme Strategy: The policy shift of the Dutch development cooperation have resulted in the decision of the government of the Netherlands to end its current bilateral development cooperation program in Pakistan. Therefore, all projects in education, water and environment and governance will be completed before 2015. This also implies that no new funding requests will be accepted by the Dutch government in the afore-mentioned sectors.

The focus of the current bilateral development cooperation program is on basic education, water and environment, and governance.

Programmes and Projects: The current focus of the Dutch bilateral development cooperation is on education, water and environment and governance. The education portfolio consists of 8 projects, covering pre-primary, primary, secondary and technical/vocational education and training. Most projects started in response to both natural disasters (earthquake and floods) and human emergencies in conflict affected districts, in particular in Khyber PakhtunKhwa and Balochistan. Construction and rehabilitation of (girls) schools and classrooms, improvement of sanitary facilities, provision of textbooks and complementary learning materials, teacher training and school based planning and management are part and parcel of most of the projects. Specific attention is paid to learning outcomes, safety and creating a child-friendly learning environment.

The current water and environment portfolio consist of 13 projects and programs. Collaboration in the water and environment sectors are based on the priorities defined in the National Environmental Policy of the Government of Pakistan.

The Governance portfolio consists of 7 projects aimed at implementing electoral reforms, strengthening the functioning of Parliament, supporting community and public institutions for improved governance, protecting basic human rights and finally enhancing peace and security through integration of women’s human rights. The support also includes training of young diplomats in international relations and diplomatic practice, and training of judges in international criminal law.

Page 21 of 53

Page 22: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Budget in USD Project End Date

National Human Rights Fund III (The Asia Foundation)

3,425,000.00 2015

National TVET Reform support program (GIZ) 20,550,000.00 2015

National ISL Bank-Netherlands WSPP-Phase II (World Bank)

2,192,000.00 2014

National REVIP (IWMI) 3,973,000.00 2014

National National Impact Assessment Prog.-(IUCN) 3,288,000.00 2014

National Pakistan Domestic Biogas Prog. (RSPN) 4,247,000.00 2014

National Re-integrating Street Children (LettuceBee Kids)

33,873,250.00 2014

National Snow Leopard Conservation (Snow Leopard Foundation)

34,250,000.00 2014

National Human Capacity Development for Minorities (Caritas)

33,414,300.00 2014

National Youth Empowerment regarding SRHR (Idrak)

33,988,330.00 2014

National Women Mentoring Women in Business (LUMS)

9,970,860.00 2014

National Prince Claus Laureate Naiza Khan Exhibtion (Kuch Khaas)

4,896,380.00 2014

National Safe the Children – Service Delivery (Pakistan en Afghanistan)

4,110,000.00 2015

National The Citizen First (Oxfam Novib) 5,480,000.00 2015

National Partnership for Peace (International Rescue Committee UK)

7,946,000.00 2015

National UNICEF Peace building Social Cohesion and Resilience Program

3,425,000.00 2015

National Global Human Rights Defence (Pakistan, India, Bangladesh)

2,329,000.00 2015

National IMPACT Alliance Oxfam Novib 8,083,000.00 2015

KP, FATA, Balochistan

Multi-Donor Trust Fund KP, FATA and Balochistan (World Bank)

4,795,000.00 2015

KP Strengthening Rule of Law in Malakand (UNDP)

1,918,000.00 2015

KP Support Public Safety and Justice in Malakand Division (DTCE)

2,877,000.00 2015

KP Battagram Education program (Save the Children)

19,180,000.00 2015

Balochistan Criminal Justice in Balochistan (UNODC) 2,466,000.00 2015

Funding Allocation: As of 2012, the Dutch government has contributed € 110.2 million to various programmes and projects in Pakistan in the following sectors:

Page 22 of 53

Page 23: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Funding Modalities: The Dutch has a limited budget for small-scale and short-term projects in Pakistan. This budget is available for projects that concern development, poverty reduction, health, gender, education, environment, etc. (ODA) and other projects that focus on the strengthening of ties between Pakistan and the Netherlands, for example cultural projects (Non-ODA).

Implementing Partners: The Dutch were implementing projects with a number of government and non-government entities as well as with UN agencies. A brief account of these partnerships is below:

1. Education: The programs are implemented by international agencies such as UNICEF, Save the Children, World Vision and GIZ in close collaboration and coordination with the Provincial and District Education government officials and the other development partners.

2. Water & Environment : Current programs undertaken with the government, NGOs, private sector include the Asian Development Bank, World Bank and IWMI wetlands, mangroves, groundwater, biodiversity, Indus River, livelihoods with local government, communities, UNDP, IUCN and WWF with RSPN & SNV with UNDP and provincial governments.

3. Governance: These programs are implemented by international agencies like The Asia Foundation, UNDP, UNWOMEN, and The Netherlands Institute for International Relations Clingendael, The Hague Forum for Judicial Expertise, and also by local NGOs like Strengthening Participatory Organization (SPO).

Page 23 of 53

Page 24: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

The European Union (EU)

Cooperation between the European Union (EU) and Pakistan dates back to 1974, but the 2004 cooperation agreement paved the way for closer relations. The EU’s Humanitarian Aid and Civil Protection Department (ECHO) has been working in Pakistan for a number of years, responding to people affected by natural disasters and conflict. Humanitarian aid to Pakistan has totaled almost € 313 million since 2009. Various relief items were channeled and assistance was provided to flood victims through the EU Civil Protection Mechanism.

As part of the EU’s response to the devastating floods that hit Pakistan, the European Parliament and the Council signed measures granting the country emergency autonomous trade preferences effective as of November 2012. As a result, certain export goods can enter the EU duty free or will be subject to certain ceilings (tariff rate quotas).

Thematic Focus: The current thematic focus of the EU is on two main priorities:

1. Rural development and natural resources management – the main concern here is the deteriorating state of the environment and declining water resources. The objective is to improve livelihoods and spur income generation and employment in rural communities, including those with big refugee populations.

2. Education and human resources development – the aim is to increase access to basic education and improve vocational training to prepare the growing number of young people for the job market.

Geographical Focus: EU programme and project assistance has a county wide coverage with a focused approached towards areas affected by natural and manmade disasters.

Country Programme Strategy: In line with Pakistan’s policy priorities, the EU’s programme strategy for Pakistan (2007-2013) aims at reducing poverty. The first focal area for assistance is rural development and natural resources management in Khyber PakhtunKhwa and Baluchistan with a view to reducing regional disparities and promoting stability in Pakistan’s sensitive provinces bordering Afghanistan. The second focal area will be education and human resource development which is a critical ingredient for developing a well-trained work force and creating a moderate and stable Pakistan. Activities carried out in the field of higher education will be financed within the context of the regional programming for Asia. Other areas of assistance are trade development, democratization and human rights and anti-money laundering.

To maximize the impact of EC assistance, key cross-cutting issues, in particular the environment, conflict prevention, gender, HIV/AIDS, human rights and governance are mainstreamed in this CSP. Programmes and Projects: The EU support goes to programmes in the areas of human rights, democratization and trade development. There are two major initiatives currently being implemented in Pakistan:

Page 24 of 53

Page 25: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

1. Support for track2 dialogue between India and Pakistan (implemented through the Jinnah Institute in Islamabad and the Centre for Dialogue and Reconciliation in Delhi): this project includes the organization of conferences both in Delhi and Islamabad gathering civil society, think tanks and media but also government officials. The objective is to discuss sensitive issues in order to create mutual understanding and goodwill on both sides. This project lasted for 18 months and will soon be prolonged for another 18 months. Among other issues such as water, Afghanistan post-2014 and media, Kashmir was the main focus of the initial contracting period and will remain one of the main angles for the next 18 months.

2. Peace-building in Kashmir (implemented through Conciliation Resources): the overall objective of the project is to contribute to a more productive and inclusive peace process between India and Pakistan by facilitating the participation of people from all regions of Kashmir and creating constituencies for peace on both sides of the Line of Control (LoC). The project focus includes cross LoC dialogue and advocacy training workshop for civil society, engagement of women ‘mentors’ with women on respective sides of the LoC, advocacy activities and meetings with parliamentarians from both sides of Kashmir, joint university activities or support the development of a Memorandum of Understanding between cross LoC Chambers and Traders Associations.

Implementing Partners: EU has been engaged with a wide range of implementing partners including Democracy Reporting International, WB, UNDP, Internews, International Alert, Search for Common Ground, Community Appraisal and Motivation Programme Society – CAMP, PAIMAN Alumni Trust, International Foundation for Electoral Systems, Trust for Democratic Education and Accountability (TDEA) / Free and Fair Elections Network

Funding Allocation: Under the Development Cooperation Instrument (DCI), an indicative allocation of € 398 million has been earmarked for Pakistan for the period 2007-2013. These resources may be supplemented by projects and programmes financed under the regional programmes for Asia and under various thematic programmes. An overview of the past seven years (2000-2007) EU’s grant cooperation with Pakistan as follows:

`Funding Mechanism: EU provides funding through development grants and technical assistance in priority areas agreed upon by the member states.

Page 25 of 53

Page 26: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Norway

The Government of Pakistan and Norway have long standing relations. Norway established diplomatic relations with Pakistan when it gained independence in 1947 and there has been a Norwegian Embassy in Islamabad since the 1970s. A cornerstone in the bilateral relations is the development cooperation with an emphasis on education, health, good governance and culture. Norway is also a major humanitarian donor to Pakistan.

Thematic Focus: The overall objective of Norway’s development policy is to fight poverty and bring about social justice. In 2014, Norway’s development priorities for Pakistan will include good governance, education, rural development, women and gender equality and human rights. In addition, the embassy supports projects related to culture, peace and reconciliation and building local capacities for disaster prevention, preparedness and response.

Geographical Focus: Norway’s development programme and project has a county-wide coverage with a focused approached towards neglected areas of the country.

Country Programme Strategy: Norwegian development policy is strongly aligned with the country’s foreign policy and national interest in international stability and in “safeguarding global public good”. The human rights approach and the focus on poverty reduction lost some importance in Norwegian cooperation in the last years, while the orientation to growth became more important. Norway’s focus on global poverty reduction is driven by a combination of moral responsibility and national interests. Its development policy is based on a commitment to solidarity and the Millennium Development Goals (MDGs), the belief in a strong United Nations and a human-Rights-based-approach. Development policy aims at challenging structural sources of inequality, injustice, oppression and discrimination. The government is a strong supporter of multilateral development system, aid effectiveness, policy coherence and innovative financing mechanisms.

Programmes and Projects: Norway has a number of new and on-going development initiatives in Pakistan. UNODC and Norway signed a project agreement on 6 June 2013 with a grant of NOK 1.75 million. The project will support improved institutional capacities for police training and crime scene investigation skills and processes, as well as improved training in prosecutor career development and police-prosecutor cooperation. NOK 15 million is also being provided to a 3-year programme (2012-2014) for home based workers managed by UN Women. A total of NOK 20 million is expected to be spent in 2014 on the phasing out of the Norwegian-Pakistan Partnership Initiative managed by UNFPA, UNICEF and WHO.

On the humanitarian front, Norway contributed NOK 10 million (approx. US$ 1.6 million) to the Emergency Response Fund Pakistan, while providing a combined total of NOK 50 million to organizations such as Save the Children, UNHCR, NRC and the Norwegian Red Cross/IFRC/ICRC.

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

National Realization of human rights in Pakistan 1,373,917.88 2012 2014

National Responsive Education and Awareness for Child Protection (REAP)

837,754.80 2012 2014

Page 26 of 53

Page 27: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

National Institutional Cooperation Programme, Phase II

4,188,774.02 2009 2014

National OCHA Capacity Building Project 931,750.89 2013 2014

National Coalition for the rights of minorities 50,265.29 2014 2014

National, Punjab

Access Justice for Marginalized 1,591,734.13 2012 2014

National, Punjab

Women's Economic Empowerment: Home Based Workers

2,513,264.41 2013 2015

GB Chitral Integrated Development Programme 7,204,691.32 2009 2014

GB Garamchashma Hospital 393,744.76 2013 2014

GB Harnessing capacities in DRR in hazardous areas of Pakistan

1,340,407.69 2011 2014

GB Women Economic Empowerment: Phase-II 1,022,060.86 2013 2014

KP, GB Culture Cooperation with Aga Khan Cultural Service Pakistan

1,725,774.90 2012 2014

KP Sport & Play for Development and Peace, Mardan

820,999.71 2012 2015

KP Reducing vulnerability through DRM in KPK 2,871,497.08 2011 2014

KP, FATA Communities waging peace through youth and mother's peace groups

113,594.86 2013 2015

Punjab Cultural Diversification Programme (CDP) 753,979.32 2012 2014

Punjab House of Peace - Dar ul Aman 1,233,175.07 2012 2014

Sindh Norway Pakistan Partnership Initiative 24,361,909.70 2008 2014

Implementing Partners: Norway works in collaboration with national and local level development partners throughout the country besides the UN system. Some of these partners include UNODC, OCHA, NDMA, and Non-Government Organizations.

Funding Allocation: The annual development budget managed by the Norwegian Embassy in Pakistan is targeted at NOK 100 million. Norway is the third largest contributor to the ERF having contributed NOK 45 million in total (approx. US$ 7.5 million) since 2010. Norway is also the Fund’s most consistent contributor having allocated funding every year since its establishment. In 2013, Norway also allocated NOK 5.5 million to support a capacity building project with the NDMA coordinated by UN OCHA, which is still ongoing.

Page 27 of 53

Page 28: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Funding Mechanism: The Embassy of Norway does not issue calls for applications though accepts and evaluates project applications throughout the year. While the embassy mainly grants project and programme support, funding for small scale grants may also be allocated. As most grants are offered for multi-year projects, every year only a limited portion of the total development budget may be allocated for new projects. All grants are made public online at the Norwegian Ministry of Foreign Affairs’ Grants Portal.5

All grant applicants are expected to be aware of and demonstrate measures in the fight against corruption, a clear gender perspective and considerations of project impacts on the environment and the vulnerability to climate change. Grant recipients are expected to be familiar with UN Security Council resolution 1325 on women, peace and security.

All disbursements committed by the Norwegian Embassy, beyond the budget year of the grant letter, are subject to parliamentary appropriations.

5 http://udtilskudd.regjeringen.no

Page 28 of 53

Page 29: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Germany

Development cooperation between Pakistan and Germany goes back to 1961 and has a funding volume of some 2.5 billion Euro to date. Pakistan was thus one of Germany's first partner countries. The regional focus of this cooperation has traditionally been the north-western part of the country. Germany is one of few donors to have its own implementing structures. It is active in Khyber-Pakhtunkhwa Province (KP) and is one of a few of Pakistan's partners to be implementing measures in the Federally Administered Tribal Areas (FATA) along the border with Afghanistan. Individual measures are also carried out in Gilgit-Baltistan, Azad Jammu Kashmir, Sindh and the Punjab.

Thematic Focus: The following areas are priority areas of cooperation: Governance Energy Education including vocational education and training Health

Geographical Focus: The German development cooperation has nation–wide projects with a focus on Khyber Pakhtunkhwa province and the Federally Administered Tribal Areas (FATA).

Country Programme Strategy: The Country Strategy 2015 to 2020 is under development.

Programmes and Projects: German Development Cooperation has a number of new and on-going development initiatives i.e. Education, Energy, Health and Governance in Pakistan.

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

National Tuberculosis Control Programme 11,100,000.00 2010 2014

National Safe Blood Transfusion 34,580,000.00 2009 2014

National Microfinance Programme 23,520,000.00 2010 2020National Glacier Monitoring Project 8,300,000.00 yet to be

definedyet to be

definedNational Strengthening the Gender Crime Center of

PPB6,230,000.00 2009 2015

National Health Sector Support 23,520,000.00 2013 2015

National Support to TVET Reform 14,940,000.00 2010 2016

National National Basic Education Project 4,840,000.00 2010 2015

National RAHA Capacity Development 4,840,000.00 2009 2015

National, KP, FATA

Support to Good Governance 37,070,000.00 2010 2016

National, KP Geohazard Assessment Northern PAK 2,770,000.00 2008 2015

AJK Health Infrastructure Programme AJK 38,180,000.00 2006 2014FATA FATA Development Program 14,660,000.00 2009 2015

Page 29 of 53

Page 30: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

FATA FATA Health Programme 7,470,000.00 2009 2014

GB Harpo Hydropower Project 29,740,000.00 2009 2014

GB Health Programme GB 10,380,000.00 2004 2014

KP Livelihood and Community Infrastructure Program

43,710,000.00 2009 2014

KP Support to Infrastructure Development in KP

13,830,000.00 2014 2016

KP Support to Development Planning in KP 8,300,000.00 2011 2014KP Hydropower Keyal Khwar 134,320,000.00 2009 2017KP Hydropower and Renewable Energy

Programme13,830,000.00 2013 2016

KP Basic Health KP 8,720,000.00 2000 2014KP Education Sector Development

Programme6,920,000.00 2008 2016

KP RAHA 38,040,000.00 2013 2016KP Promotion of Biodiversity 6,920,000.00 2012 2015

KP Edu Swap II: School-Infrastructure KP 35,410,000.00 ongoing ongoing

KP Dev Swap III: Housing Reconstruction KP 41,500,000.00 ongoing ongoing

KP Dev Swap IV: Rehabilitation of Schools KP 34,580,000.00 ongoing ongoing

KP Dev Swap V: Health Infrastructure 27,670,000.00 ongoing ongoing

KP, FATA Reproductive Health and Family Planning 3,460,000.00 2012 2015

KP, FATA and ICT

Reproductive Health in Rural Areas 20,060,000.00 2010 2015

KP, FATA, Balochistan

Multi-Donor Trust Fund 27,670,000.00 2010 2015

KP, GB Hydropower Development Programme 86,320,000.00 yet to be defined

yet to be defined

KP, GB Social Health Protection 24,210,000.00 yet to be defined

yet to be defined

Punjab Grid Station Ghazi Road 15,630,000.00 2008 2016

Punjab Promotion of Basic Education in Punjab 6,230,000.00 2009 2015

Punjab Water Efficiency Programme PAK 4,150,000.00 yet to be defined

yet to be defined

Punjab Support to Punjab Prosecution Service 3,180,000.00 2011 2014

Page 30 of 53

Page 31: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

Punjab, KP Renewable Energy and Energy Effiency Project

12,450,000.00 2011 2014

Sindh Strengthening Civil Law Enforcement in Sindh

4,150,000.00 2013 2015

to be defined

SME Support 13,830,000.00 yet to be defined

yet to be defined

Implementing Partners: Following departments and implementing partners are conducting projects funded by the German development cooperation under the respective thematic areas.

Education: Departments of Education in KP, ICT, AJK, Balochistan, Punjab, FATA NAVTTC, Departments of Technical Education (TEVTA) in all provinces and regions

Energy: Ministry of Water and Power WAPDA AEDB SMEDA PPAF

Health: Department of Health in KP, AJK, Gilgit-Baltistan and FATA National Planning Commission and national Ministry for Health Social Security Stakeholders Civil Society Organizations BISP

Governance:• provincial government and selected district authorities in KP• FATA Secretariat• Federal Board of Revenue• Federal Statistics Office• Geological Survey of Pakistan

Others: NRSP World Bank SAARC Secretariat

Funding Allocation: The German development cooperation has been allocating funding in the energy, health, governance, education sectors and in debt swaps.

Page 31 of 53

Page 32: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Provincial and Administrative Areas wise Focus - GDC

Funding Mechanism: The German development cooperation mainly implements through GIZ and KfW. In addition, funding is provided to INGO and NGO partners:

1. Technical Cooperation: Die Deutsche Gesellschaft für Internationale Zusammenarbeit GmbH (GIZ) is the largest implementer of Technical Cooperation. GIZ has been engaged in Pakistan on behalf of the German Federal Ministry for Economic Cooperation and Development (BMZ). GIZ further sub-grants different projects to different organizations and institutions as per required implementing expertise.

Page 32 of 53

Khyber Pakhtunkhwa - KP41%

Federally Administered Tribal Areas - FATA

2%

KP & FATA9%

country-wide13%

Punjab3%

Dept Swaps24%

Gilgit Baltistan - GB4%

AJK4%

Page 33: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

2. Financial Cooperation: Die Kreditanstalt für Wiederaufbau (KfW) works on behalf of the German Government to reduce poverty, protect the climate, ensure peace and organise globalisation in such a way that those living in the world's poorer regions will benefit. In practice, this means: food security and basic education for all, healthy economic growth that does not occur at the expense of the environment, reliable energy supply that helps preserve the climate and financial services that are available to all and enable people to escape from poverty.

Japan International Cooperation Agency (JICA)

The JICA Pakistan Office was established in 1983 under the Exchange of Notes signed between the Government of Pakistan and the Government of Japan. It is part of a network of more than 90 offices worldwide. An agreement was signed between the two governments in April 30, 2005, which will

Page 33 of 53

Page 34: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

facilitate technical cooperation through JICA in Pakistan more effectively under a solid umbrella framework.

Thematic Focus: JICA has defined the following three priority areas for development assistance to Pakistan:

1. Ensuring human security and human development2. Development of a sound market economy3. Achievement of balanced regional socio-economic development

Geographical Focus: JICA’s development programme and projects have a county-wide coverage with a focused approach towards neglected areas of the country.

Country Programme Strategy: JICA follows the Country Assistance Program of the Government of Japan, which defines medium and long term goals for the country aimed at "building a sustainable society." Under this specific goal JICA strengthens polio eradication and immunization measures, and provides water and sewer infrastructure as well as institutional arrangements to respond to rapid urbanization. JICA also provides assistance for building power transmission and road networks primarily through ODA loans and strengthens domestic industries through technical cooperation. Other assistance JICA provides includes technical assistance for disaster preparedness at the national level while utilizing Japan's expertise as a country frequently being affected by natural disasters.

Programmes and Projects: Consistent with these priorities, JICA actively implements a range of sector specific programs, which are agreed upon by both, the governments of Japan and Pakistan. The sectors that the Government of Japan has mainly focused on are health and sanitation, education, irrigation and water resource development, agriculture, industrial development, governance and environment.

Technical Cooperation

Province / Region

Project Name Project Start Date

Project End date

National The Project for Improvement of Training Capacity on Grid System Operation and Maintenance

2011 2014

GB The Project for Promotion of Value Added Fruit Products in Gilgit-Baltistan

2012 2016

KP Project for Capacity Development of Technical and Vocational Centers in Khyber Pakhtunkhwa

to be decided to be decided

KP Project for Strengthening of Routine Immunization to be decided to be decided

Punjab Strengthening Irrigation Management System Including Agriculture Extension through Farmers' Participation in the Punjab Province

2009 2014

Punjab Non-Formal Education Promotion Project 2011 2014

Punjab Project for Integrated Solid Waste Management Master Plan in Gujranwala

2014 2016

Balochistan Project on In Country Training and Provision of to be decided to be decided

Page 34 of 53

Page 35: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Start Date

Project End date

Equipment for Baluchistan University of Information Technology Engineering and Management Sciences (BUITEMS)

Sindh Livestock Farmers Entrepreneurship Development Project

2014 2019

JICA - Grant Aid for PakistanProvince / Region

Project Name Project Budget

Project Start Date

Project End date

National The Project for the Improvement of Audio Visual Equipment of the National Institute of Folk and Traditional Heritage

13,327,855.00

2012 2014

National Project for Rehabilitation of Pakistan Medium Wave Radio Broadcasting Network

13,327,855.00

2010 2016

Punjab Project for Retrieval of Sewerage and Drainage System in Faisalabad

6,572,509.00 2012 2015

Sindh Project for the Improvement of Child Health Institute in Karachi

13,693,529.00

2012 2015

Sindh, Punjab and ICT

Project for Airport Security Improvement 18,726,358.00

2013 2016

JICA - Loan Aid for Pakistan

Province / Region

Project Name Project Budget

Project Start Date

Project End date

National PK-P55 (Indus Highway III) 35,624,346 2006 2017National PK-P56 (Dadu-Khuzdar Transmission

System)149,079,516 2006 2015

National PK-P57 (East-West Road Improvement (N-70))

114,927,489 2008 2017

National PK-P58 ( Punjab Transmission and Grid Station Project)

109,528,986 2008 2015

National PK-P61 (National Transmission Lines and Grid Stations Strengthening Project)

141,458,100 2010 2017

National PK-P63(Polio Eradication Project) 48,035,192 2011 2015KP PK-P62(Khyber Pakhtunkhwa Emergency

Rural Road Rehabilitation Project)48,047,639 2011 2020

Punjab PK-P59 (Punjab Irrigation System Improvement Project)

87,819,498 2008 2017

Sindh PK-P60 (Rural Road Construction Project II (Sindh))

224,215,900 2008 2015

Page 35 of 53

Page 36: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Implementing Partners: JICA has a diverse group of national and provincial implementing partners in the public sector, which include the National Transmission and Dispatch Company, the Water and Power Development Authority, the Karachi Electric Supply Corporation, the Ministry Of Railways (Railway Board), the National Highway Authority, the Ministry of Local Government and Rural Development, the Ports and Shipping Wing , the Ministry of Communication, the Communication and Works Department, the Government of Khyber PakhtunKhwa, the Works and Services Department, the Government of Sindh, the Irrigation and Power Department, the Government of Punjab, the Agricultural Development Bank of Pakistan, the Pak-American Fertilizers Ltd, the Education Department and the Government of Balochistan

Funding Allocation: JICA has made the following disbursement for financial year 2011:

1. ODA loans: 13.1 billion ¥ 2. Grants aid: 3.358 billion ¥3. Technical cooperation expenses: 1.928 billion ¥

Funding Mechanism: JICA provides bilateral aid in the form of technical cooperation, ODA loans and grants.

Swiss Development Cooperation (SDC)

The Office of the Swiss Agency for Development and Cooperation (SDC) is part of the Embassy of Switzerland and has operated in Pakistan since 1966. Switzerland and Pakistan have a long-standing relationship and the Swiss government has supported the Government of Pakistan in its development strategy for more than 40 years. Switzerland aims at contributing to the development in the region and

Page 36 of 53

Page 37: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

peaceful coexistence of the people through improving the lives of the most vulnerable population and enhances local governance and human rights.

Thematic Focus: In Pakistan, SDC concentrates on three basic tenants of development:

1. Promotion of micro enterprises through finance and vocational education.2. Support to sustainable practices regarding the use of natural resources.3. Promotion of human rights and education, with emphasis placed upon the education of women

and girls.

SDC Humanitarian Aid (SDC-HA) assists the Government of Pakistan in emergencies with relief and reconstruction programmes.

Geographical Focus: SDC operates nationwide with a strong focus on Khyber PakhtunKhwa, FATA and Northern areas.

Country Programme Strategy: SDC’s long-term development strategy for Pakistan focuses on reducing poverty, fighting discrimination and supporting disadvantaged population groups. The SDC aims to achieve this by empowering the population through strengthening local governance, increasing incomes by teaching the local people how to better manage their natural resources and supporting the vulnerable populations, such as women and children.

Programmes and Projects: SDC focuses on alleviating poverty, empowering people by improving good governance and livelihoods and supporting disadvantaged population groups. The SDC has also provided extensive humanitarian assistance in the form of emergency relief, reconstruction / rehabilitation and prevention / preparedness activities.

Development Cooperation: Switzerland’s long-term commitment in Pakistan focuses on reducing poverty, fighting discrimination and supporting disadvantaged population groups.

The SDC’s activities in Pakistan that fall under the current “Pakistan Hindukush Programme” (PHP) are built on two main pillars, namely improving the living conditions of the rural population by contributing to enhance livelihoods and strengthening resilience of population.

Swiss Humanitarian Aid (SHA): SDC’s humanitarian aid activities focus on reconstruction and rehabilitation along with the prevention and preparedness for the benefit of victims of natural disasters as well as on the measures to improve living conditions of refugees and internally displaced persons by:

Reconstructing / rehabilitating infrastructure, particularly schools. Providing water, sanitation and hygiene (WASH) facilities to the communities. Community based Disaster Risk Reduction (CBDRR) activities. Secondments and financial contribution to international organizations.

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

KP, FATA Livelihoods Programme Hindukush Pakistan 17,091,941 2012 2015

KP, FATA Water and Sanitation (WSP South Asia), 2,546,812 2012 2015

Page 37 of 53

Page 38: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Global ProgrammeKP, FATA Water for Livelihoods Project 4,788,007 2011 2013

KP, FATA Rehabilitation of Drinking Water Supply in KPK after the Floods 2010

5,206,816 2011 2014

KP Water and Energy Security through Microhydels in the Hindukush (MHP)

1,765,790 2011 2013

KP Reconstruction of Schools 5,206,816 2011 2014

KP Community-Based Disaster Risk Reduction Project

470,000 2013 2015

FATA FATA Development Programme 3,239,815 2013 2015

Implementing Partners: SDC works with a wide range of public and private sector partners. These include the following:

1. Local and national non-governmental organizations and public institutions;2. United Nations agencies such as the United Nations Development Program (UNDP), the United

Nations Children's Fund (UNICEF), the International Labor Organization (ILO) and the International Union for Conservation of Nature (UICN);

3. International financial institutions such as the World Bank and the Asian Development Bank;4. The government of Khyber PakhtunKhwa Province and to some extent the national government

as well the State Bank of Pakistan.5. Commercial banks and leasing companies. In the recent past, SDC has supported the First

Women Bank and the Bank of Khyber. Partnerships are currently implemented with Network Leasing and Orix Leasing.

6. Other donors: SDC has reactivated a MSE Donor dialogue focusing on microfinance and improving coordination among donors.

Funding Allocation: SDC’s funding commitments to Pakistan equal 14.5 CHF million a year.

Funding Mechanism: The SDC provides support by either directly implementing its projects or by working with the Government of Pakistan or local non-governmental organizations that act as the SDC’s implementing partners. Furthermore, the SDC contributes financially to programmes of other organizations, such as the International Committee of the Red Cross (ICRC), the Office of the United Nations High Commissioner for Refugees (UNHCR), the World Food Programme (WFP) and other organizations providing aid, which the SDC rates as effective and worth for an investment.

After natural disasters, such as the 2010 floods, the SDC supported multilateral partners with various experts from the Swiss Humanitarian Aid Unit. The beneficiaries of this secondment were the United Nations Office for the Coordination of Humanitarian Affairs (UN-OCHA), the World Food Programme (WFP) and the World Bank.

Page 38 of 53

Page 39: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

US Agency for International Development (USAID)

For more than 60 years, the United States and Pakistan have worked together to forge a relationship that benefits the people of both countries. This cooperation produced transformative ideas and institutions that are still being considered landmark accomplishments to this day. This cooperation is fosters Pakistan’s economic and social progress as well as reinforces the country’s role in the world.

The historic Enhanced Partnership with Pakistan Act of 2009 launched a robust new era of cooperation with Pakistan on development. The infusion of new resources provided for integrated, longer-term development programs in key sectors that are priorities for both Pakistan and the United States.

Thematic Focus: The United States has a deep interest in a stable, democratic and prosperous Pakistan as well as long-term constructive bilateral partnership. The USAID assistance program focuses on five priority sectors with crosscutting themes of civic participation, accountability and women’s empowerment:

1. Increased sustainable energy supplied to the economy;2. Improved economic status of focus populations;3. Increased stability in focus areas;4. Improved opportunities for learning and work;5. Improved maternal and child health outcomes in focus areas;

Geographical Focus: USAID programs are implemented in all areas of Pakistan, with a focus on under-represented geographic areas, including:

i. Federally Administered Tribal Areasii. Khyber Pakhtunkhwaiii. Southern Punjabiv. Sindhv. Balochistanvi. Gilgit-Baltistanvii. Azad Jammu Kashmir

Country Programme Strategy: USAID program strategies are based on the national development priorities identified by the Government of Pakistan (GOP) in various sector development strategies. In addition, the program strategies also take into account priorities expressed by the Pakistani public in polling, media, and civil society discussions.

Programmes and Projects: Working with the Government Pakistan, other U.S. Government agencies as well as multilateral and bilateral donors, USAID Pakistan has focused its program over the last year on five areas essential to Pakistan’s stability and long-term development, which are also reflective of the Government of Pakistan’s development priorities. Over the last year, USAID has streamlined the number of projects to less than 70 and has also chosen to implement over half of all funding through local government and non-government organizations in Pakistan. Supporting the civilian government’s

Page 39 of 53

Page 40: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

capacity to meet the needs of its citizens is a vital element of USAID’s program, as is working with non-governmental organizations and the private sector.

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

National Agribusiness Project 39,947,381 2011 2015

National Anti-Fraud Hotline Program 2,964,668 2010 2015

National Assessment and Strengthening Program 44,407,228 2010 2015

National Emergency Food Security Program in Pakistan

889,705 2013 2014

National Field Epidemiology Laboratory and Training Program

6,783,498 2005 2014

National Gender Equity Program 40,000,000 2010 2015

National Maternal and Child Health Program 387,000,000 2013 2019

National Pakistan Grain Storage Program 2,500,000 2011 2014

National Pakistan Private Investment Initiative 24,000,000 2013 2023

National Pakistan Reading Project 159,738,358 2013 2018

National Pakistan Strategy Support Program 22,713,134 2011 2015

National Political Parties Development Program 21,500,000 2011 2016

National Prevention of Election Related Violence 2,500,000 2013 2015

National Small Grants and Ambassador's Fund Program

49,988,052 2010 2015

National Strengthening Citizen Voice and Public Accountability Program

45,000,000 2011 2016

National Training for Pakistan Project 33,927,813 2013 2017

National U.S. Pakistan Science & Technology Cooperative Program

12,402,034 2005 2018

National, AJK Mangla Dam Rehabilitation Project 150,000,000 2013 2017

National, Punjab Repair and Rehabilitation of the Muzaffargarh Thermal Power Station

15,778,195 2010 2014

National, Sindh Guddu Power Station Project 19,123,730 2010 2014

National, Sindh Repair and Rehabilitation of the Jamshoro Thermal Power Station

19,329,150 2010 2014

Page 40 of 53

Page 41: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

GB Satpara Development Project 19,753,163 2012 2017

FATA FATA Infrastructure Project 611,500,000 2010 2014

FATA FATA Institutional Strengthening Project 17,959,598 2011 2016

KP KP Reconstruction Program 149,900,000 2010 2014

KP Municipal Services Program – KP 84,750,000 2012 2016

KP Tarbela Dam Repair & Maintenance 16,500,000 2010 2014

KP, FATA Conflict Victims Support Program in KP & FATA

25,000,000 2012 2015

KP, FATA FATA-KP Health Program 30,499,998 2012 2017

KP, FATA Gomal Zam Irrigation Project 52,000,000 2011 2014

KP, FATA Peshawar - Torkham Road Rehabilitation 67,000,000 2012 2014

KP, Sindh Water and Sanitation Program 5,736,576 2011 2016

KP, Balochistan, FATA

NWFP/FATA/Balochistan Multi-Donor Trust Fund

25,000,000 2010 2015

Punjab Dairy Project 14,018,777 2011 2014

Punjab USAID Power Distribution Program 230,000,000 2010 2015

Punjab Women's Hostel Project 6,000,000 2011 2014

Punjab, Sindh Pakistan Trade Project 37,118,147 2009 2014

Punjab, Sindh, KP USAID Pakistan Entrepreneurs 29,999,830 2009 2014

Punjab, Sindh, KP and Balochistan

Agriculture Innovation Project 30,000,000 2013 2016

Punjab, Sindh, KP, FATA, Balochistan, GB and ICT

Pakistan Firms Project 92,255,031 2009 2014

Punjab, Sindh, KP, FATA, GB, and KP

Merit and Needs Based Scholarship Program

37,400,000 2004 2016

Sindh Health Infrastructure Improvement 21,734,087 2011 2015

Page 41 of 53

Page 42: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget USD

Project Start Date

Project End date

Sindh Municipal Services Program - Sindh 22,000,000 2012 2016

Sindh Sindh Basic Education Project 81,000,000 2011 2016

Sindh, KP, Balochistan, FATA, GB and ICT

USAID Energy Policy Program 80,283,410 2011 2015

Balochistan Balochistan Agriculture Project 25,400,000 2009 2015

Balochistan Construction of 6 University Faculties and Rehabilitation/Reconstruction of Flood Damaged Schools

40,000,000 2010 2015

Balochistan Kalat-Quetta-Chaman Highway Construction

90,000,000 2013 2015

Implementing Partners: USAID programs are mutually agreed upon by the governments of the United States and Pakistan. These programs are implemented in partnership with government organizations, non-governmental organizations (NGOs) and the private sector;

1. Abraaj Capital Limited2. Aga Khan Foundation3. Agribusiness Support Fund4. Associates in Development Pvt. Ltd.5. Aurat Foundation6. Benazir Income Support Program7. CDM Constructors, Inc.8. Center for Disease Control9. Chemonics International, Inc.10. Creative Associates International11. Dairy and Rural Development Foundation12. Deloitte Consulting LLP13. Education and Literacy Department, Government of Sindh14. FATA Secretariat15. Food and Agriculture Organization16. Forman Christian College17. Government of Khyber Pakhtunkhwa18. Halcrow Pakistan Pvt. Ltd19. Higher Education Commission20. Information Management & Mine Action Program 21. International Finance Corporation

Page 42 of 53

Page 43: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

22. International Food Policy Research Institute23. International Organization for Migration24. International Relief and Development25. International Rescue Committee26. Internews27. Jhpiego28. John Snow, Incorporated29. KNCV Tuberculosis Foundation30. Lahore University of Management Sciences31. Macro International, Inc.32. Management System International33. Marie Stopes Society34. Mennonite Economic Development Associates 35. Mercy Corp36. Ministry of Water and Power, Govt. of Pakistan37. National Academy of Sciences, Washington38. National Democratic Institute39. National Development Consultants40. National Engineering Services of Pakistan (Pvt.) Limited41. National Rural Support Program 42. Provincial Reconstruction, Rehabilitation and Settlement Authority, Govt. of KP43. Population Services International44. Public Health Institute45. Rural Support Program Network 46. The World Bank47. Transparency International - Pakistan48. Trust for Democratic Education & Accountability 49. United Nations Children's Fund50. United Nations Development Program51. United State Department of Agriculture52. United States Institute of Peace53. World Food Program54. World Health Organization55. World Learning, Inc.

Funding Allocation: From October 2009 to December 2013, USAID Pakistan disbursed 3.4 billion USD.

KLB Disbursement from October 01, 2009 - December 31, 2013

Sectors Amount $ in Million

Energy 266.648Economic Growth & Agriculture 230.784

Page 43 of 53

Page 44: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Sectors Amount $ in Million

Stabilization 765.121Education 276.499Health 216.316Humanitarian/Flood Assistance 1,092.009Cash Transfer 549.000

TOTAL 3396.38

Funding Mechanism: The U.S assistance is directed through the Government of Pakistan, local and international NGOs and private sector companies. In programs where USAID Pakistan partners directly with the Government, USAID Pakistan signs activity agreements with the implementing Pakistani government agency. Before any award is signed, USAID Pakistan also conducts pre-award surveys of all government and non-government institutions with which USAID Pakistan considers signing a direct award. Currently, funding mechanisms include:

a. Direct funding for federal government projects and programsb. Direct funding for provincial government projects and programsc. Direct funding to Pakistani NGOsd. Direct funding to Pakistani private sector companiese. Direct funding to international NGOsf. Direct funding to non-Pakistan private sector companiesg. Multi-donor trust fundsh. Direct grants to multilateral organizationsi. Public-private partnerships with private sector companies

Page 44 of 53

Page 45: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

The World Bank

The World Bank’s support to Pakistan is directly linked to country’s own development vision. The organization supports the Federal and Provincial Governments in implementing various reform programs aimed at encouraging growth, investment and employment generation. Reforms at the provincial level are specifically aimed at improving delivery of social services like education, health, clean drinking water and sanitation. These efforts have yielded impressive results in many areas.

Thematic Focus: The World Bank has supported the Government of Pakistan in the following four strategic pillars emanating from the current country partnership strategy:

1. Economic governance2. Human development and social protection3. Infrastructure to support growth4. Security and reducing the risk of conflict

Geographical Focus: The World Bank has been working in all provinces including Federally Administered Tribal Areas (FATA)

Country Programme Strategy: The World Bank Country Partnership Strategy was updated with a Progress Report in 2012, which—in consultation with the Government of Pakistan—now covers the period up to 2014. The overall focus of the strategy is to help Pakistan's economy to get back onto a path of high and sustained growth. The partnership remains centered on the existing pillars of the Strategy and evolves federal and provincial priorities as validated by the government and other stakeholders during various consultation sessions. In consultation with the Government, the strategy period was extended to include FY 2014 in order to synchronize it with the national political cycle and the IDA cycle.

The World Bank Group Pakistan is currently preparing its new Country Partnership Strategy for the next five years, covering Fiscal Years 2015-2019. It will be designed to focus on the twin goals of ending extreme poverty and promoting shared prosperity.

Programmes and Projects: The World Bank uses lending and analytical work to help Pakistan achieve its goals. Pakistan’s portfolio (IDA/IBRD/MDTF) consists of 34 projects with a total commitment of $4.4 billion. In addition, the Bank maintains an extensive and ongoing analytic work program on a wide range of economic and sector specific topics.

The regional agenda will continue to be a Bank focus. South Asia remains one of the least integrated regions in the world undermining growth efforts. Many of the Bank’s country-specific Pakistan projects in trade and transportation, ports and power will help regional cooperation. Beyond this, the Bank expects to support increased trade cooperation between Pakistan and its neighbors. This will be particularly important in strengthening the trade corridor with Afghanistan during its transition period. A

Page 45 of 53

Page 46: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

regional power line (CASA-1000) is also being supported that would connect Central Asia, Afghanistan and Pakistan.

Province / Region

Project Name Project Budget – USD (Millions)

Project Start Date

Project End date

National Second Improvement to Financial Reporting and Auditing Project (PIFRA II)

108.5 2005 2014

National Third Poverty Alleviation Fund 250 2009 2015

National Electricity Distribution and Transmission 196.8 2008 2014

National Water Sector Capacity Building and Advisory Services Project

38 2008 2014

National Karachi Port Improvement 115.8 2011 2015

National Tertiary Education Support Project 300 2011 2015

National Partnership for Polio Eradication III 139.7 2009 2014

National Flood Emergency Cash Transfer 125 2011 2014

National Social Safety Net TA 210 2009 2016

National Tarbela 4th Extension Hydropower Project

840 2012 2018

National Natural Gas Efficiency Project 200 2012 2017

KP/ FATA/ Balochistan

KP/FATA/Balochistan Governance Project (MDTF)

8.8 2011 2015

KP/FATA KP/FATA Economic Revitalization Project (MDTF)

20 2011 2015

FATA FATA Rural Livelihoods & Infrastructure (MDTF)

12 2012 2015

FATA FATA Urban Centers Project (MDTF) 7 2012 2015

FATA FATA Rural Roads Project (MDTF) 16 2012 2015

KP Revitalizing Health in KP (MDTF) 16 2012 2015

KP KP Emergency Roads Recovery (MDTF) 17.1 2011 2014

KP KP Southern Area Development 18 2013 2015

KP Competitive Industries Project in KP (MDTF)

9 2013 2015

Punjab Land Record Management 115.7 2007 2014

Page 46 of 53

Page 47: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Province / Region

Project Name Project Budget – USD (Millions)

Project Start Date

Project End date

Punjab Punjab Barrages Improvement Phase II Project

145.6 2010 2016

Punjab Punjab Irrigated Agriculture Production 250 2012 2018

Punjab Punjab Education Sector II 350 2012 2015

Punjab Punjab Cities Governance Improvement 150 2012 2017

Punjab Punjab Health Sector Reform Project 100 2013 2017

Punjab Punjab Public Management Reform Program

50 2013 2018

Sindh Sindh Water Sector Improvement 150.2 2007 2015

Sindh Sindh Skills Development 21 2011 2014

Sindh Sindh Education Sector II 400 2012 2017

Balochistan Balochistan Small Scale Irrigation 25 2008 2014

Balochistan Balochistan Education Support 22 2006 2014

Balochistan Promoting Girls Education in Balochistan (MDTF)

10 2012 2015

Balochistan Balochistan Disaster Management Project (MDTF)

5 2012 2015

National Second Improvement to Financial Reporting and Auditing Project (PIFRA II)

108.5 2005 2014

Implementing Partners: The World Bank works in collaboration with federal ministries, autonomous bodies and provincial and regional departments throughout the country. The Bank has programs and partnerships with local civil society organizations and private sector.

Funding Allocation: To support the aforementioned thematic areas, the Bank will remain engaged with a robust program projected at up to $4.0 billion in new IDA/IBRD lending over FY 2012-14. An increasing portion of the Bank’s portfolio is being managed at the province level, consistent with the recent 18 th Constitutional Amendment. The Bank also manages a Multi-Donor Trust Fund (MDTF) of about $140 million for conflict-affected areas, which provides grants to Khyber PakhtunKhwa, FATA and Balochistan.

Page 47 of 53

Page 48: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

An overview of the Bank’s fiscal commitments to Pakistan over the period from FY 2009 to FY 2013 is given in the following table.

Commitments by Fiscal Year (in millions of dollars)FY 2009 1,610FY 2010 300FY 2011 1,553FY 2012 1,790FY 2013 744

Total 6,136

Funding Mechanism: The World Bank has rolled out an innovative lending instrument that ties funding directly to the delivery of results. The newly introduced Program-for-Results (PforR) modality does not provide financing to cover a program’s expense. Instead, it disburses money upon the delivery and verification of predefined results. PforR is designed to help improve the capacity, transparency and performance of a recipient country’s government systems and institutions focused on improving national systems such as those for the health and education sector. PforR complements two existing World Bank lending instruments, namely policy-based loans that fund policy changes and project-support loans that finance project expenditures or inputs. PforR is used in combination with any or both of the two.

Page 48 of 53

Page 49: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

International Fund for Agricultural Development

IFAD's work in Pakistan aims to combat rural poverty by promoting rural development. It is active in the country since 1978. Comprehensive assessment tools, such as the Country Programme Evaluation and the Country Strategic Opportunities Programme (COSOP), enable IFAD to fine-tune its efforts. For example, the most recent COSOP calls for an emphasis on high-value crops, livestock development, market access and climate change mitigation. These recommendations inform both current and future projects and help ensure the efficiency and effectiveness of IFAD's work.

Thematic Focus: To achieve these objectives, IFAD's strategy focuses on:

Eradicating poverty in vulnerable and remote areas Achieving community participation Identifying opportunities for innovation Supporting partnerships between the public and private sectors.

Geographical Focus: In order to ensure that the Country Programme has a sustained impact on reducing rural poverty, IFAD focuses its support on areas that have a high incidence of poverty or that suffer from specific development problems due to their geographical location. In coming years, greater efforts will be made to promote local innovation, policy dialogue and knowledge management.

A defining characteristic of IFAD's strategy is its focus on people. By promoting skills enhancement, vocational training and access to financial services, IFAD aims to provide rural households with wider opportunities, including increased access to markets and to partnerships with the private sector.

Country Programme Strategy: According to the COSOP developed in 2009, IFAD's overarching strategic objectives in Pakistan are:

a. to connect rural people with the skills, services and technologies that will enable them to increase productivity;

b. to build and support local capacity through the promotion of participatory development processes.

Programmes and Projects:

Province / Region

Project Name Project Budget – USD (Millions)

Project Start Date

Project End date

Balochistan: Gwadar and Lasbela

Gwadar-Lasnela Lavelihood Support Project

Total Cost: USD 34.5 million IFAD Share:

USD 30 million

2013 2019

Punjab: Bahawalnagar, Bahawalpur, Muzafargarh and Rajanpur

South Punjab Poverty Alleviation Project Total Cost: USD 50 million IFAD Share: USD 41

million

2011 2017

Page 49 of 53

Page 50: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Implementing Partners:

IFAD has worked in partnership with non-governmental organizations, which helps mobilizing communities and encourages rural poor people to own the project activities. In Pakistan IFAD’s principal development partners are the World Bank and the Asian Development Bank. IFAD has co-financed four, now completed, projects with the World Bank. The Fund has also built up a strong partnership with the Asian Development Bank, which has co-financed 18 out of 19 projects in Pakistan. Other partners have been FAO, WFP, the Provincial and National governments of Pakistan, the Pakistan Poverty Alleviation Fund, civil society, non-governmental and community-based organizations and increasingly private enterprises.

Page 50 of 53

Page 51: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Korea International Cooperation Agency (KOICA)

The fact that Korea graduated from being a recipient country to becoming a donor country in such a short period of time is an impressive example of the successful transformation of an economy. By sharing its first-hand experiences, Korea can greatly contribute to the development of other emerging economies. In this vein, the Korea International Cooperation Agency (KOICA) was established in 1991 as the implementing partner for grant aid and technical cooperation. It aims to resolve global development issues in concert with the international community by contributing to the sustainable socio-economic development of developing countries and by assisting their efforts to reduce poverty and improve the quality of life.

The KOICA Pakistan Office was established in 2010 and currently carries out five projects, mainly with focuses on ICT, textile industry, water resources and the construction of facilities such as vocational training centers. In addition, KOICA offers short and long term training program as part of its technical cooperation, where more than 1000 Pakistani government officials were sent to Korea to participate. They have forged a strong cooperative partnership with KOICA through its alumni association.

Through the Fourth High Level Forum on Aid Effectiveness in Busan, South Korea, KOICA actively participates as a policy maker in the field of international development to ensure that development aid leads to tangible and sustainable improvements and to address the post-2015 development agenda.

Thematic Focus: KOICA has four thematic priority areas and seven sectorial priorities in Pakistan.

1. Developing human resources2. Improving health3. Assisting the rural poor4. Providing humanitarian assistance

The sectorial priorities include:

1. Water and sanitation2. Education3. Agriculture and rural development4. Health5. Industries (i.e. textile, agriculture) and energy6. Science and technology7. Disaster relief

Geographical focus: At present, KOICA has development projects mainly in the Punjab province with a strategic focus on a comprehensive agricultural and rural development.

Country Programme Strategy: Korea’s development cooperation programme for Pakistan is outlined in the 2014 Country Partnership Strategy (CPS) published by the Korean Government. The CPS 2015 is currently under development. The Grant Aid Program involves the construction of facilities, the provision of equipment, training and the dispatch of experts from Korea and vice versa.

Page 51 of 53

Page 52: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

KOICA assesses projects based on its expertise in given areas and to the extent to which its experience can make a valuable contribution.

Programmes and Projects:

The KOICA Alumni Association of Pakistan (KAAP) operates as a coordinating body for arranging meetings, events and workshops for alumni.

Province / Region Project Name Project Budget (USD)

Project start Date

Project End Date

Punjab/Islamabad Pak-Korea National Capacity Building Institute for Water Quality Management at PCRWR, Islamabad

3 M 2011 2013 (in progress)

Punjab/Islamabad Pak -Korea ICT Center of Excellence at CTTI Islamabad

5 M 2011 2013 (in progress)

Punjab/Rawalpindi & Pothawar region

Pak-Korea Capacity Building Center for Agri & Livestock Technology , PMAS-Arid Agriculture University Rawalpindi

3.5 M 2012 2015 (in progress)

Punjab/Kasur District Waste Water Treatment facility in Patoki, District Kasur

4 M 2012 2014 (in progress)

Punjab/Faisalabad Pak-Korea Technical Textile Center in National Textile University-Faisalabad,

6.5 M 2013 2016 (in progress)

Punjab/Mandi Bahuddin

Provision of Water Supply Schemes in Mandi Bahauddin, Punjab

4M 2011 2014 (completed)

Sindh/Karachi Pak-Korea Garment Technology Institute, Karachi

2M 2011 2013 (Completed)

KP/Malakand Division KOICA- JICA Joint Training program for the Crises Effected People of Malakand Division

0.6 M 2009 2010 (completed)

KP/FATA Rehabilitation programs with UN-HABITAT for IDPs of FATA & KPK

3.3M 2009 2009 (completed)

Page 52 of 53

Page 53: Introduction - United Nations in · Web viewThrough its Multilateral Branch, Canada provides long-term institutional support and short-term humanitarian assistance. Since 2010, Canada

Implementing Partners:

The main coordinating department is the Economic Affairs Division. Other partners include:

Ministry of Textile Division (MINTEX), also at the provisional level in Sindh Urban Housing Development, Public Health Engineering Department (HUD-PHED)

Lahore Punjab Higher Education Commission (HEC), Islamabad PMAS-Arid Agriculture University (AAUR), Rawalpindi National Textile University (NTU), Faisalabad Center for Construction Training Technology (CTTI), Islamabad Pakistan Council on Research in Water Resources (PCRWR), Islamabad Japan International Cooperation Agency (JICA), Pakistan Office (previous projects) Ministry of Education and Professional Trainings (previous projects) UN-HABITAT (previous project) World Food Program (future collaboration) Turkish International Cooperation Agency (TIKA) United Nation Development Program (UNDP) United Nation High Commission on Afghan Refugees (UNHCR)

Funding Allocation:

For the period covering 1991 and 2013, KOICA’s has granted development aid amounting to 42.5 million USD, which were allocated to the following areas:

1. Development Projects (42.8% ) 2. Humanitarian Crisis Aid, directly or indirectly via Multilateral Donors (31.4%)3. Technical Assistances, including training and capacity building (13.4%)4. Volunteer Groups (World Friends Korea) (11.8%)5. Others (0.6%)

Funding Mechanism: KOICA Pakistan provides development aid in the form of technical cooperation totalling about 10 million U$ annually as agreed upon in the Economic Cooperation Framework signed by the governments of Korea Pakistan.

Page 53 of 53