Introduction to VEAPS your Industrial Automation and Integration Team

18
Introduction to VEAPS, Inc. www.VEAPS.com 432 South Emerson Ave. Suite 310 Greenwood, IN 46143 (317)- 550-4317

Transcript of Introduction to VEAPS your Industrial Automation and Integration Team

Page 1: Introduction to VEAPS your Industrial Automation and Integration Team

Introduction to VEAPS, Inc.

www.VEAPS.com

432 South Emerson Ave.

Suite 310

Greenwood, IN 46143 (317)- 550-4317

Page 2: Introduction to VEAPS your Industrial Automation and Integration Team

Agenda

� Company Information

� Customers

� Core Competencies

� Project Management Approach at VEAPS

� Contact Information

Page 3: Introduction to VEAPS your Industrial Automation and Integration Team

Background

Company Information

• Formed to fill the need for structured project management

expertise in delivery of engineering and automation projects

• Certified Minority Business Enterprise with the state of Indiana

• Headquarters in Greenwood, Indiana

Page 4: Introduction to VEAPS your Industrial Automation and Integration Team

Corporate Leadership

• Brad VanPelt, PMPPresident

• Bill KincaidVice President - Engineering

Company Information

Page 5: Introduction to VEAPS your Industrial Automation and Integration Team

• Our Success is Predicated on Your Success

• Disciplined and Structured Project Management Approach

• To Be Recognized as Leaders in Project Delivery

• Provide the Right People for the Job

Corporate Philosophy

Company Information

Page 6: Introduction to VEAPS your Industrial Automation and Integration Team

Industries Served

• Food and Beverage

• Pharmaceutical

• Medical Device

• Consumer Products

• Water Treatment

• Industrial Manufacturing

Manufacturing Market Focus

Manufacturing Integration Expertise

• Material Handling

• Liquid Processing

• Powder Handling

• Filling

• Secondary Packaging

• HVAC

• Utilities

Company Information

Page 7: Introduction to VEAPS your Industrial Automation and Integration Team

Food &

Beverage

Industrial

Manufacturing

Life Sciences

Other

Customers

Page 8: Introduction to VEAPS your Industrial Automation and Integration Team

Core Competencies

� Validation

� Engineering

� Automation

� Project Management

� Services

Page 9: Introduction to VEAPS your Industrial Automation and Integration Team

• Complete Validation Packages

• Protocol Execution

• Compliance

• Computer System Validation

• Test Method Validation

• CFR Parts 11, 210, 211, and 820

• GAMP V

Validation

Core Competencies

Page 10: Introduction to VEAPS your Industrial Automation and Integration Team

• Process Design

• Equipment and Instrument Specifications

• Power Distribution

• Line Performance Improvement

• Process Optimization

Engineering

Core Competencies

Page 11: Introduction to VEAPS your Industrial Automation and Integration Team

• PLC Programming - Rockwell, Siemens, Koyo,

Mitsubishi, GE

• HMI Development - RSView, WonderWare

• Data Historian - FactoryTalk Historian, OSI Pi,

InSQL

• S88, S95

Automation

Core Competencies

Page 12: Introduction to VEAPS your Industrial Automation and Integration Team

• Complete Systems Integration

• Capital projects and new installations

• Major Plant Expansions

• Smaller Maintenance Projects

• Multi-discipline Projects

• Construction Management

• Commissioning and Validation

• Vendor Management

Project Management

Core Competencies

Page 13: Introduction to VEAPS your Industrial Automation and Integration Team

• Technical Staff Augmentation

• Gap Assessment

• Computer Aided Design

Services

Core Competencies

Page 14: Introduction to VEAPS your Industrial Automation and Integration Team

Overview

Project Management Approach

VEAPS Approach is Based on

• PMI Project Management Body of Knowledge (ANSI/PMI 99-001-2008)

� Five Process Groups

� Nine Knowledge Areas

• Strict Adherence to PMI Code of Ethics

• Disciplined, methodical processes

• Industry-standard and proprietary tools and techniques

• Appropriate Stakeholder Communications

Page 15: Introduction to VEAPS your Industrial Automation and Integration Team

PM Process Groups

Initiating Planning Executing Closing

Monitoring &

Controlling

Project Management Approach

Page 16: Introduction to VEAPS your Industrial Automation and Integration Team

Typical Deliverables (1 of 2)

Initiating• Project Charter

• Stakeholder Register

Planning• Project Management Plan

� Quality Plan (Commissioning)

� Staffing Plan

� Communications Plan

� Risk Management Plan

� Procurement Plan

• Requirements Document

• Schedule

• Budget

Executing• Project Team Directory

• Project Team Deliverables

• Commissioning Test Protocols

• Bid Specs, Selection Matrix,

Issue POs

• Status updates, Progress

Reports, Project Team

Meetings, etc.

Project Management Approach

Page 17: Introduction to VEAPS your Industrial Automation and Integration Team

Typical Deliverables (2 of 2)

Monitoring & Controlling• Factory Acceptance Test

• Receive Equipment and Services

• Change Control Review (Approve/Reject)

• Accept/Reject Commissioning

• Performance Reports (Schedule

and Budget metrics)

• Monitor & Control Risks (Updated

Risk Register, Review new Risks)

Closing• System Acceptance

• Lessons Learned

• Operations Support (SOPs)

• Training Documents

• User’s Manuals

• Maintenance Plan (Spare Parts,

Recommended PM schedule,

etc.)

Project Management Approach

Page 18: Introduction to VEAPS your Industrial Automation and Integration Team

• Address

432 South Emerson Ave.

Suite 310

Greenwood, IN 46143

Contact Information

Thank You!

• Web

www.VEAPS.com

• Phone

Terrance Bradford 317-760-6873

• Email

[email protected]