Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

14
Introduction to the UK Infrastructure Transitions Research Consortium (ITRC) David Alderson School of Civil Engineering and Geosciences Newcastle University

description

Introduction to the UK Infrastructure Transitions Research Consortium (ITRC). David Alderson School of Civil Engineering and Geosciences Newcastle University. Overview. Project aim and challenges Consortium Work Streams National Infrastructure Asset Database, Newcastle Visualisation - PowerPoint PPT Presentation

Transcript of Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

Page 1: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

Introduction to the UK Infrastructure Transitions Research Consortium

(ITRC)

David AldersonSchool of Civil Engineering and Geosciences

Newcastle University

Page 2: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Overview

• Project aim and challenges• Consortium• Work Streams• National Infrastructure Asset Database, Newcastle• Visualisation – Examples– Challenges

• Links and Contact

Page 3: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

ITRC Aim and Ambition

Aim: To develop and demonstrate a new generation of simulation models and tools to inform the analysis, planning and design of national infrastructure

Challenges:• Analysing the long term state of NI systems• Uncertainties e.g. in demand, economic

conditions, costs, performance• The complexity of multiple governance

arrangements and projects• The capacity of UK industry to compete in

globalised markets for infrastructure services

Page 4: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Consortium

Lead Universities • Cardiff University • University of Leeds • University of Southampton • Newcastle University • University of Oxford • University of Sussex • University of Cambridge

Support• Engineering and Physical Sciences Research Council Programme Grant £4.7 million• University contributions £1 million• Industry contributions £1.6 million

Page 5: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

ITRC Partners

Over 40 partners in industry and government:• Government departments,

agencies and local authorities• Utility companies• Engineering and multi-

disciplinary consultants• Contractors• Insurers• Research organisations and data

providers• Engineering institutions• NGOs

Page 6: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

ITRC Work Streams

6

Page 7: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Work Stream Integration

Page 8: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

National Infrastructure Database - Newcastle

ITRCPopulation

ITRCEconomics

ITRCEnergy

ITRCHazards

ITRCWater

ITRCTransport

ITRCWaste

ITRC spatial database comprises of 100’s layers organised into separate

databases by sector.

Page 9: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Visualisation – Economics and Demographics

NetCDF

Population (Leeds)

Economics (Cambridge)

Page 10: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Visualisation – Networks

Gas Transmission Electricity Transmission Regional Electricity Distribution

OS Strategi Roads OS Strategi Rail

Network Interdependency

Database (PostGIS)

NetworkX

Page 11: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Visualisation Challenges

• Spatial and a-spatial• High dimensionality data• Multiple scales of modelling• Infrastructure complexity – Volume– Interdependencies – Failure– Uncertainties

• Infrastructure performance

MIT Atlas of economic complexity

Cartogram of population (Male 25-29), 2054

Infrastructure Performance (ITRC FTA Executive Summary)

Page 12: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Links

ITRC Newsletter:http://www.itrc.org.uk/news/newsletters/subscribe-toitrc-newsletter/

Fast Track Analysis Executive Summary Report:http://www.itrc.org.uk/outputs/fta/

EPSRC ITRC Programme Grant:http://gow.epsrc.ac.uk/NGBOViewGrant.aspx?GrantRe=EP/I01344X/2

Page 13: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Contact

Twitter: http://twitter.com/#!/ukitrc/

Email: [email protected]

Project Manager (Benjamin Kidd):[email protected]

Page 14: Introduction to the UK Infrastructure Transitions Research Consortium (ITRC)

www.itrc.org.uk

Thank you.

[email protected]