1

Introduction to building Estimating in South Australia

Page 2: Introduction to building Estimating in South Australia 1.

2

ArchitecturalFloor plan

Page 3: Introduction to building Estimating in South Australia 1.

3

Architectural plan building details

Page 4: Introduction to building Estimating in South Australia 1.

4

Architecturalelevations

Page 5: Introduction to building Estimating in South Australia 1.

5

Truss Layout via Pryda software

Page 6: Introduction to building Estimating in South Australia 1.

6

Truss Report via Pryda software

Page 7: Introduction to building Estimating in South Australia 1.

7

Conventional manual layout with trusses

Page 8: Introduction to building Estimating in South Australia 1.

8

Production Truss plan used for manufacture- Critical measurements shown

Council Truss plans- Loads and engineering shown

Truss “T4”

Page 9: Introduction to building Estimating in South Australia 1.

9

Truss “T10”

Page 10: Introduction to building Estimating in South Australia 1.

10

How the plans look on site

Page 11: Introduction to building Estimating in South Australia 1.

11

Page 12: Introduction to building Estimating in South Australia 1.

12

Page 13: Introduction to building Estimating in South Australia 1.

13

Truss to conventional hip end

Truss T 4

Page 14: Introduction to building Estimating in South Australia 1.

14

Truss to conventional hip end (close up)

Truss “T4”

Page 15: Introduction to building Estimating in South Australia 1.

15

Truss to conventional hip end(Halfway point)

Truss “T10”

Page 16: Introduction to building Estimating in South Australia 1.

16

Truss T10

Truss to conventional hip end(side view truss “T10”

Page 17: Introduction to building Estimating in South Australia 1.

17

Steel Facia

Hip end & Steel Facia

Page 18: Introduction to building Estimating in South Australia 1.

18

Valley boards

Page 19: Introduction to building Estimating in South Australia 1.

19

Panel “N”

Pryda software wall layout

Page 20: Introduction to building Estimating in South Australia 1.

20Wall frame panel “N” Engineering for the lintel, for the size

Pryda software Engineering-Based on wind speed and loading

Page 21: Introduction to building Estimating in South Australia 1.

21

Wind speed is indicated on the architectural drawings

Residential categories are:28 Km/h (N1)33 Km/h (N2)41 Km/h (N3)

The wind speed determines both bracing and beam loading for the building

Strip bracing OS panel bracing

Page 22: Introduction to building Estimating in South Australia 1.

22

OS Bracing

Lintel

Page 23: Introduction to building Estimating in South Australia 1.

23

Timber take-off list

Computer Manual

Page 24: Introduction to building Estimating in South Australia 1.

24

The Building process on site

Page 25: Introduction to building Estimating in South Australia 1.

25

Strip bracing

Top plate bracing

Bottom plate

Truss tie down

Page 26: Introduction to building Estimating in South Australia 1.

26

Finished valley , Facia and gutters

Underside of eaves, facia and gutter

Brick work Tied to frame

Page 27: Introduction to building Estimating in South Australia 1.

27

Fully trussed roof

Non-load bearing internal wall

Page 28: Introduction to building Estimating in South Australia 1.

28

Typical multi dwellingMulti storey site- Scaffolding

Page 29: Introduction to building Estimating in South Australia 1.

29

Floor trusses

2 StoreyBracing &Tie downs

Plumbing to be taken into considerationwith floor trusses

Page 30: Introduction to building Estimating in South Australia 1.

30

Party fire walls between buildings

Fire check13 & 16mm

Shaft liner25mm