Introduction to 1 st EN-RSSO Networking Meeting

9
Introduction to 1 st EN-RSSO Networking Meeting Ans Pardons

description

Introduction to 1 st EN-RSSO Networking Meeting. Ans Pardons. RSSO Networking meetings aim to exchange information, share experience and create a team of excellence. Receive official news (department, RP, CERN) Know each other (´s activities) Exchange experience (2014 = LS1) - PowerPoint PPT Presentation

Transcript of Introduction to 1 st EN-RSSO Networking Meeting

Introduction to 1st EN-RSSO Networking MeetingAns Pardons

• Receive official news (department, RP, CERN)• Know each other (´s activities)• Exchange experience (2014 = LS1)• Receive training and tools for task as RSSO

• Mailing list EN-RSSOs• EDMS structure EN RSO RSSO• INDICO RSSO training & networking

https://indico.cern.ch/category/5753/

RSSO Networking meetings aim to exchange information, share experience and create a team of excellence

24/6/2014 RSSO networking meeting - IMPACT and Dosimetry 2

RSSO networking meeting - IMPACT and Dosimetry

This morning’s program

• Introduction of each RSSO• ISOLDE robots exchange ALARA III

intervention feedback (Jean-Louis)• Dosimetry & Impact (Ans)• ALARA follow-up and feedback (Thijs)• Discussion & Questions• WDP edition – for those new to the case

Exchange information, exchange experience, tools, news from the department, discussion.

24/6/2014 3

RSSO networking meeting - IMPACT and Dosimetry

RSSO tasks

• Limited to the group´s installations and areas and to a specific mandate (see memo)

• Regular reporting to GL and RSO• Regular contacts with RSO and other RSSOs• General tasks & additional specific tasks

(see memo)• Work preparation (see next slide)

... The RSSO assists the GL in executing his safety duties and works closely with the RSO and with HSE/RP

24/6/2014 4

RSSO networking meeting - IMPACT and Dosimetry

RSSO in ALARA interventions

Know what is happening in your group!

... The RSSO assists in the writing of procedures for working in radiation areas to optimize the collective dose

24/6/2014 5

ALARA intervention

Work Dose planning

Optimization Approval

Level I RecommendedStandard RP

measures(reduce time, distance, protective

cloth, …)

RSSO

Level II Mandatory RSSO/RP GL/RP/RSO

Level III Mandatory RSSO/RP/RSO ALARA-C

RSSO networking meeting - IMPACT and Dosimetry

ALARA Level III in EN/LS1

90% of CERN´s ALARA Level III interventions take place in the EN department, LS1 saw 15 EN-ALARA III works.

24/6/2014 6

for the 1st 13 interventions

RSSO networking meeting - Introduction 7

EN-RSSOs

12 RSSOs from 6 groups

24/6/2014

• Who?• Where?• What?• “Best” 2014

experience?

RSSO networking meeting - IMPACT and Dosimetry

News from RSOC

• The medical certificate issue is being addressed, accesses prolonged and users asked to bring MC from home institute.

• Some personal dosimeters are at end of life time and overestimate. They will be replaced according to availability of new dosimeters, in the meantime a compensation algorithm is used to correct the dose. However, IMPACT will not show the corrected dose, this has to wait for a larger consolidation campaign.

• An ATS RSSO training day will take place in autumn 2014.• A new DIMR routing will be integrated in IMPACT by the

end of the year, aimed at intervention feedback. Also, an RSSO will be appointed to each Level II or Level III intervention (visibility) and the role of project leader will be assigned and get read access to relevant personnel doses.

24/6/2014 9

AOB