Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

144
AN ISO 9001-2000 CERTIFIED COMPANY SACHAL ENERGY DEVELOPMENT (PVT.) LTD

description

For the Kind Attention Of: Mr. Muhammad Amir

Transcript of Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Page 1: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

AN ISO 9001-2000 CERTIFIED COMPANY

SACHAL ENERGY DEVELOPMENT (PVT.) LTD

Page 2: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

PROUDLY AN ISO 9001:2000 CERTIFIED COMPANY

Page 3: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

For The Kind Attention Of:

Muhammad Amir Project Director

Sachal Energy Development (Pvt.) Ltd

Phone: +92 51 2294184 Fax: 051 2292434

Email: [email protected] House # 333, Street 8, F-10/2, Islamabad, Pakistan

Page 4: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

SYED KHALID JAMAL CHIEF EXECUTIVE

SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION

SYED MOHAMMAD ALI KHALID GENNERAL MANAGER

Page 5: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

November 25th 2015

For The Kind Attention of Muhammad Amir Project Director Sachal Energy Development (Pvt.) Ltd Phone: +92 51 2294184 Fax: 051 2292434 Email: [email protected] House # 333, Street 8, F-10/2, Islamabad, Pakistan.

INTRODUCTION CUSTOM CLEARANCE FOR

SEDL WIND POWER PROJECT

Thank you very much for forwarding the Inquiry to quote for the Custom Clearance for your upcoming Wind Power Project

We are pleased to inform you that we have privilege to handle the recently 03 Wind Power Projects in Pakistan, including:-

FFC Wind Energy Limited

Foundation Wind Energy-I Limited

Foundation Wind Energy-II (Pvt) Limited

Based on our experienced in Pakistan we have highlighted all the areas/ process & procedures that would be involved in the Custom Clearance & Inland Transportation.

Page 6: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

SECTION “A”

DOCUMENTS REQUIRED FOR THE CUSTOM CLEARANCE

I. Original Invoice:

Showing Complete Description of the Goods with Value of the each Individual item

II. Detail Packing List:

Showing Complete Description, Quantity, Numbers of Packages, Gross Wt, Net Wt and Size of Each Packages in Cu. Meter

III. Original Bill of Lading.

Duly endorsed at the backside in our Favor

IV. Certificate of Origin.

V. Complete Catalogue / Drawings/Lay Out/ BOQ for Plant, Machinery & Equipments.

VI. Any other Import Document required by the Customs Sanctions /

Authorizations, Necessary Permissions from Government Agencies like FBR (Federal Board of Revenue), Ministry of Commerce / Board of Investment, if any special exemption is required for the Duties &Taxes

VII. NTN Certificate. (MUST)

Who Ever Be the Importer/Consignee

Page 7: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

VIII. Sales Tax Registration Certificate. (MUST)

Who Ever Be the Importer /Consignee

IX. Please be Informed that all the Importer/consignee who intends to make the

Imports in their/Company Name has to registered themselves with the Custom Authority in the light of the Newly Customs WeBoc System.

X. All Original Documents Related to Any Exemption Claimed including the Income Tax, has to be provided in Advance.

The Importer Has To Be Registered With The Customs Newly Implemented WeBOC Systems.

Page 8: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

OTHER DUTIES & RELVENT PORT TAXES

CUSTOM DUTY

0%. SALES TAX

0% INCOME TAX

If Income Tax Exemption Availed 0% from Relevant Commissioner Income Tax.

If Not Available Than I. Tax 6% for Filer & 9% for Non Filer EXCISE TAX

Import Value 1% Minimum-To- 1.05 % Maximum = Amount of Excise Tax.

PORT WHARFAGE

For 20 Containers: Range Between: 9,500 and For 40'= 18,500/- Approximately

For Karachi Port, Payable to “Excise & Taxation Officer Sea Dues, Karachi”

For Port Bin Qasim, Payable to “Excise & Taxation Officer Port Qasim”

Page 9: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Possible Delays:

Further to the above there may be possibility of delays in Clearance due to following reasons:-

Non availability of the Original Shipping Documents

Delay in meeting Custom Queries.

Strikes / Weather, act of God, force Major etc.

Delays due to Non-availability of concerned officers

Delays in receipt of Payments

Delays due to the Non-fulfillment of Shipping Companies

All Other Relevant Charges Regarding such as: (Will be paid by the Importer if any Applicable as Prevailing Law)

Custom Duties & Other Taxes. (If Any) (At Actual)

Port Qasim/ KPT Wharfage. (If Any) (At Actual)

Excise & Taxation. (If Any) (At Actual)

KPT Demurrage. (If Any) (At Actual)

Shipping Companies Charges. (If Any) (At Actual)

Any Other Receipted Payments. (If Any) (At Actual)

We can also arrange the Freight for the Project.

Page 10: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

SUMMARY OF THE SERVICES WHICH WILL BE PROVIDED BY US

(As & If Agreed)

All the Services related to the Customs Clearance. All the Services related to the Karachi Port Trust. All the Services related to the Port Mohd Bin Qasim. All the Services related to Inland Transportation Arrangements in Pakistan.

We trust that you will find our above rates to be competitive. In case you require any Information / Clarification; we shall be pleased to answer them.

Thanking you:

Syed Sajid Jamal

Syed Sajid Jamal Director Projects & Commercial Division

M/s S.M.Asghar (Pvt) Limited An ISO 9001:2000 Certified Company 908-910, 9th Floor, Chapal Plaza Hasrat Mohani Road Off I.I.Chundrigar Road Karachi, Pakistan. Cell # + (92) 302-8269260 Cell # + (92) 314-2000073 Email: [email protected] Email: [email protected] URL: www.smasghar.com.pk

Page 11: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

COMPANIES PROFILE

COMPANY NAME : M/s S.M.Asghar (Pvt) Limited

An ISO 9001:2000 Certified Company

COMPLETE ADDRESS : 908-910, 9th Floor, Chapal

Plaza, Hasrat Mohani Road Off I.I.Chundrigar Road Karachi. CORPORATE STATUS OF FIRM : PRIVATE LIMITED. TELEPHONE NO : 00+ 92+213-2468091 -5 FAX NO : 00+92+213-2468096. FIRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed). DATE OF REGISTRATION WITH : 30-03-1980. CUSTOMS E- MAIL ADDRESS : [email protected]

E- MAIL ADDRESS : [email protected] Web- Page : http://www.smasghar.com.pk DATE OF ISSUE OF LICENCE : 30-03-1980. NUMBER OF STAFF EMPLOYED : 20. YEAR OF ESTABLISHMENT : 1980.

Page 12: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

PEOPLE BEHIND THE COMPANY

SYED KHALID JAMAL : CHIEF EXECUTIVE.

SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV

SYED MOHAMMAD ALI KHALID : GENERAL MANAGER

MOHAMMAD ANWER : HEAD OF PORT OPERATIONS. MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION. S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV. MOHD SALEEM : ASST PORT OPERATION. MOHD JAVED : ASST PORT OPERATION. QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV. SALEEM NOOR : ASST. AIRPORT OPERATIONS AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY SAEED KHAN : HEAD OF COMPUTER DIVISION DILSHAD A. SIDDIQUI. : MANAGER FINANCE ASIF KHAN : ASST. MANAGER FINANCE ATIA FASIAL : ASST. OFFICE CO-ORDINATOR SYED ADNAN ALI : INCHARGE GD PREPARATION (BY AIR) ASAD ABBAS : ASST.BILLINGS & ACCOUNTS MOHSIN KHAN : FIELD OFFICER. SADDAM HUSSAIN : FIELD OFFICER. SULEMAN : OFFICE PEON. USMAN GHANI : OFFICE PEON.

Page 13: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

SECTION 1 : INTRODUCTION SECTION 2 : SCOPE OF WORK SECTION 3 : DOCUMENTATION REQUIREMENTS SECTION 4 : PROJECT REFERENCES

SECTION 5 : PICUTRE GALLARY

Page 14: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more or less US $ 1.2 Billion Dollars. You will appreciates that in all of the Projects mentioned below we have taken various Exemptions & benefits of various SRO’s from Customer to Customer & on Project to Project Basis. With our background experience, M/s. S.M.Asghar (Pvt) Limited has successfully completed all the major & Prestigious Projects of National Importance as well as International Importance.

We on merit got the benefit of various Concessionary SRO’s & Exemptions to our valued Customer to their Entire satisfaction & without any problems and difficulty. Our team of professionals sits with the Customer prior to the start of the Project/Projects & developed systems and a general flexibility of approach tailored to our Clients most Complex of requirements. We believe that our Professional approach to our Client is unparalleled by any competitors. Few of the recent Projects & Customer References are given below, for whom we have claimed the various SRO’s & Exemptions to our valued Customer to their entire satisfaction.

Page 15: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

MOL MAKORI GAS FIELD

SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Ravi

SRO: 678(I)/2004, DT: 07-08-2004

SHELL GAS

SRO: 678(I)/2004, DT: 07-08-2004

SHV ENERGY PAKISTAN Various Equipments & Material Including Break Bulk LPG Mixture

SRO: 678(I)/2004, DT: 07-08-2004

Page 16: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Expansion of Plant: RAVI GAS

SRO: 678(I)/2004, DT: 07-08-2004

WEATHERFORD DRILLING

SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Engineering

(One of the Largest Private Sector Project US $ 700 Million Dollars)

SRO: 678(I)/2004, DT: 07-08-2004

TRANSASIA REFINERY LTD (Re-Location)

(One of the Largest Private Sector Project US $ 700 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

Page 17: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

INDUS REFINERY LTD (Re-Location) (Another Largest Private Sector Project US $ 650 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESALINATION & POWER PROJECT” at DHA Karachi (Total Cost of the Project US $ 160 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi EXPANSION PROJECT & NEW GANTRY CRANE

(Total Cost of the Project US $ 400 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

Page 18: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

SATPARA HYDRO POWER DAM PROJECT

(The Project Cost US $ 30 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

GOMAL ZAM HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

Page 19: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

DUBER KHWAR HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

KHAN KHWAR HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I

(The Project Cost US $ 45 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II

(The Project Cost US $ 20 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

Page 20: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

PROGAS LPG STORAGE & HANDLING TERMIANAL (Private Sector Project US $ 50 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES

(The Second Expansion Phase Project US $ 30 Million Dollars) SRO: 575(I)/2006, DT: 05-06-2006

PETROSIN ENGINEERING (Pvt) LTD QADIRPUR 600 MMSOFD EXPANSION PROJECT

(The Project Cost US $ 6 Million Dollars) SRO: 678(I)/2004, DT: 07-08-2004

Page 21: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED PACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD (The Project Cost US $ 14 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED PACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT PROGRAM FOR ERRA (The Project Cost US $ 300 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

ALSTOM PAKISTAN LIMITED FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL) SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR. (The Project Cost US $ 20 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

Page 22: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

ALSTOM PAKISTAN LIMITED ZHORLU WIND POWER ( Heavy Transformers) SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

SRO: 575(I)/2006, DT: 05-06-2006

FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL) SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN. (The Project Cost US $ 50 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1

(The Project Cost US $ 130 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

Page 23: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2

(The Project Cost US $ 130 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING SETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)

(The Project Cost US $ 30 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

Page 24: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

S.M.ASGHAR (PVT) LIMITED

908-910, 9th Floor, Chapal Plaza, Hasrat Mohani Road, Off I.I Chundrigar Road, KARACH I

Page 25: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

We have a pleasure to give a brief introduction of our Company

M/s. S.M.Asghar (Pvt) Limited, a name famous for its credibility,

reliability & commitment in this part of world.

We are proudly an ISO 9001-2000 Certified Company. We are among the few & pioneer company who got the ISO Certification in Custom Clearance in Pakistan.

With our background experience, M/s. S.M.Asghar (Pvt) Limited

has been able to developed systems and a general flexibility of approach tailored & personalized solutions to our Clients most Complex Requirements that we believe is unparalleled by any competitors. Most important our customers are able to deal with an International Network who can arrange the movement and supervision of cargo from Europe, and beyond, whilst they only instruct one control office. This International Strength and wealth of experience combined with a genuinely personal approach we feel makes us a formidable contender. Our Credentials our Enthusiasm and our Track Record speak for themselves.

For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited

have developed & specializes and simultaneously Transform itself into a PROJECT CLEARANCE SPECIALIST. If one can give a brief look at the Pakistan’s Most Advanced

& the Important Industrial Estate PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor for

M/s. S.M.Asghar (Pvt) Limited to perform the Complete Custom

Clearance & the Logistics Support in the form of Local Transportation to these Prestigious Projects.

Page 26: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Among The Prestigious Projects At Port Bin Qasim Few Are Listed below

PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM (The Contractor for PARCO Project Cost US $ 300 Million Dollars)

ICI PTA T-11 (The Largest Private Sector Project US $ 480 Million Dollars)

Engro Vopak Terminal Ltd (VCM Tank Farm)

Engro Vopak Terminal Ltd (MEG Tank Farm)

Engro Vopak Terminal Ltd (LPG Tank Farm)

Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm) (Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)

PROGAS LPG STORAGE & HANDLING TERMINAL (Private Sector Project US $ 50 Million Dollars)

INDUS REFINERY LIMITED (Another Largest Private Sector Project US $ 750 Million Dollars)

TRANASIA REFINERY LIMITED (Another Largest Private Sector Project US $ 800 Million Dollars)

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (The Second Expansion Phase Project US $ 30 Million Dollars)

CHINA HARBOR ENGINEERING (The Contractor for EVTL for the EVTL JETTY Private Sector Project US $ 4 Million Dollars)

Page 27: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

ENGRO ASAHI POLYEMR & CHEMICALS (Another One of the Largest Private Sector Project US $ 80 Million Dollars)

FAUJI FERTILIZER BIN QASIM LTD (Handling of Break Bulk Phosphoric Acid)

LPG BREAK BULK SHIPMENT (Handling of 100% of Pakistan Break Bulk LPG Shipments at EVTL)

VCM BREAK BULK SHIPMENT (Handling of 100% of Break Bulk VCM Shipments at EVTL)

ETHYLENE BREAK BULK SHIPMENT (Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)

KARACHI INTERNATIONAL CONTAINER TERMINAL (KICT) PHASE II EXPANSION PROJECT (Total Cost of the Project US $ 400 Million Dollars)

Page 28: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Beside the Port Qasim & Karachi we now take a trip to the other side & rest of the Pakistan Major Prestigious & Project of National Importance. The Government of Pakistan in the last 5 Years initiated the few Hydropower Power & Dam Projects to overcome the Power Break down Crisis.

Hydro Power Sector Among these Projects of National Importance includes:-

MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)

SATPARA HYDRO POWER DAM PROJECT (The Project Cost US $ 30 Million Dollars)

MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

GOMAL ZAM HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

DUBER KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

KHAN KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)

ALAI KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars) Beside the Hydropower Projects, the Government also encourages the other areas such as the Sea to generate Electricity, beside the supply

Page 29: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

of quality water to the people. Among them the DHA Desalination & Power Project was the only to be setup by the Private Sector.

DHA DESALINATION & POWER PROJECT (Total Cost of the Project US $ 160 Million Dollars)

This is the first ever desalination plant in history of Pakistan. It has a capacity to Desal, 3 MIGD (Million Gallons per Day) of water, beside to produce & generate Electricity of a Capacity 95 MW Beside the Hydro Power Project initiated by the Government also focused on the another very important Sector which was OIL & GAS and LPG (Liquid Petroleum Gas Project)

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I (The Project Cost US $ 45 Million Dollars)

M/s. S.M.Asghar (Pvt) Limited was awarded by the

President of Pakistan for successfully and timely performance in Clearance and Logistics of JJVL Phase I Project The only Project in the LPG sector which was initiated by

Jamshoro Joint Venture Limited (JJVL) JJVL is Pakistan’s single largest producer of Liquefied Petroleum Gas. Situated in Dei Shah Bukhari, District Hyderabad, JJVL’s Extraction Plant has a daily output of about 500 metric tonnes of LPG and 150 metric tonnes of NGL/Naphtha. JJVL accounts for about one-third of the total local LPG production of the country. JJVL processes about 200-220 million cubic feet of natural gas condensate per day piped from British Petroleum's Badin Gas Field through the Liquid Handling Facility of Sui Southern Gas Co Ltd at Jamshoro

Page 30: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)

M/s S.M.Asghar (Pvt Limited also have a privilege of Handling

02 chartered flights carrying main booster pumps weighing over 100 Tons by Air for PARCO White Oil Pipeline Project. We also have a privilege of handling one of the Heaviest and Length Wise Piece in History of Pakistan which Weights 265 M/tons and Length Approx.76 Meters.

REQUIRED FOR CUSTOM CLEARANCE

Page 31: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

SCOPE OF WORK

Page 32: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

BENEFIT OF VAVARIOUS CONCESSIONARY

SRO’s & EXEMPTIONS

Page 33: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

PREPARATION BEFORE ARRIVAL OF VESSEL

Upon receipt of the written instruction from the Importer / Representatives of the Importer, we will be in close contact with the shipping Company in order to ascertain the expected arrival date ( ETA ) of the Ocean going Vessel at the Un-loading Port of the Country.

CONFIRMATION OF THE ARRIVAL OF VESSEL:-

We shall inform the arrival and the berthing date of the vessel to the Importer / Representatives of the Importer in order to keep a close Loop for the berthing of the vessel.

Page 34: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

CUSTOM CLEARANCE: We shall collect in full advance all the necessary documents for the onward Custom Clearance from the Importer / Representatives of the Importer when intimated and will prepare GD and all the required documents and formalities to be submitted to the related Custom Authority and Will Complete the preparation of the GD (Goods Declaration) as per Invoice, Packing List & Bill Of Lading depending on weather the Vessel has arrived and also subject to the Lodging Of Manifestation of IGM (Import General Manifest) by the Shipping Company / Shipping Agent.

OBTAINING THE DELIVERY ORDER: We shall complete all the formalities required by the relative Shipping Agent / Main Carrier Agent/ relevant Port Authority and will obtain the

Delivery Order from the Shipping Company/ OR their Agent against the

presentation/ submission of Original Bill of Lading. The delivery Order's are generally issued after filing of IGM in order to ascertain the goods have not been Transshipped.

Page 35: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

NECESSARY ASSISTANCE: We shall provide all necessary Assistance and Consultancy Services Concerning Custom Clearance to the Importer / Representatives of the Importer.

AIR CARGOES: We shall also perform the Works Related to the Air Cargo As per request of Importer / Representatives of the Importer…

Page 36: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

DELIVERY AT / TO THE PLANT SITE We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low Bed OR as per the requirement & Nature of Cargo to the Warehouse or the open storage area as per the instruction of Importer / Representatives of the Importer.

CUSTOM DUTIES TAXES SRO’s AND NECESSARY

PERMITS

All the Plant, Machinery, Equipment and Parts/Spares which are imported into Pakistan shall be subject to Custom Duties and Taxes Prevailing at the time of Import.

Page 37: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

The Duties and Taxes concerns with the Custom Authorities as per Pakistan Custom Tariff includes:-

Custom Duty/Duties From 5% Minimum To 25% Maximum Sales Tax/Taxes 17 % Income Tax/Taxes 5.5%

The Taxes Concerns with the Port Authorities:- Port Wharfage Port Demurrage Weighment Charges (for Products like Pipes of Iron/Steel/Coil-Bar)

There are two Major Ports in Karachi namely as below:

Karachi Port Port Bin Qasim Karachi Port is Further Divided into 02 Parts, namely; 1) EAST WHARF: a) Pakistan Container Terminal (PICT) Private Terminal b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No

03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.

c) Ghass Bunder, For Launches, Steamer and Boats

Page 38: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

2) WEST WHARF: a) Karachi International Container Terminal Ltd (KICT) b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24

And 25 c) Berth Number 25 is for Heavy Lift Cargo that has On Shore Heavy

Crane for capacity 50 M/Tons. For Containerized Cargo the various Yards/Ports are charging different Handling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking Charges/Yard Storage Charges. Please note that for all the above mentioned charges the relevant Port /Yard will issue Receipts for the relevant charges. Excise Taxes @ 0.91-0.95% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing at the time of Import shall be Paid by the I m p o r t e r immediately before the Clearance of the Consignments from the Port. Further the completion of GD’s (Bill of Entry) and other Custom formalities are subject to the Final Assessment / Valuation / Any SRO Benefits / PCT confirmation and also the Container / Marks & Number. Any discrepancy or mistake or dispute arising due to Invoice/ Packing List / Bill of Lading OR any other relevant documents submitted by the Importer, will may render in delay to clear the consignment.

Page 39: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

SUBMITTAL OF SHIPPING GUARANTEE

BOND IN ABSENCE OF ORIGINAL BILL OF LADING

If there is a delay in the arrival of the Original Bill of Lading, can cause a delay in getting the Goods/ Cargo release of the from the Port premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading would be therefore required by the shipping company in order to issue the Delivery Order. It shall be discussed and settle before arrival of the vessel. We will provide all necessary assistance and advice for the Shipping Guarantee to the Importer / Representatives of the Importer.

Page 40: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

During the Unloading of the Break Bulk/ loose Cargo from the vessel There are chances of getting the goods Damage OR in case we find any Loss of Goods and or the Goods already Damage on or after its receiving We shall report to the Importer / Representatives of the Importer or Arrange a joint survey as soon as possible. Marine/Transit insurance Shall be arranged by Importer / Representatives of the Importer, from Place of Origin up to the Plant Site.

Page 41: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

METHOD STATEMENT

At the present there are 02 procedures for Custom Clearance:-

1) Newly Implemented Web-Based One Customs (WeBOC) SYSTEM

Under this newly implemented procedure if the Vessel is berthed at any of the below Ports i.e. Karachi Port Trust (KPT) Karachi International Container Terminal (KICT) Pakistan International Container Terminal (PICT) Qasim International Container Terminal (QICT Port Qasim) Port Bin Qasim ( Bulk) (PBQ) Whether the imported Goods are FULL CONTANERIZED CARGO (FCL / FCL) OR Loose (LCL) Cargo, the Goods Declaration for Custom can be filed through this New WeBoc System. Goods Declaration (GD) is prepared on Line (Via Electronic Mail Data Transfer System).

WEB BASED ONE CUSTOM (WeBOC)

Page 42: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

The G.D (Goods Declaration) is prepared in accordance with the declaration of the Importer and the documents provided by the Importer i.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter the G.D (Goods Declaration) is submitted to the Custom for Assessment on Line. * The amount of Custom Duties & Taxes and the Sindh Infra Structure

Fee (CESS) has to be paid in advance as per the Importer declaration. * If the assessment by the WeBOC is done as per the declaration of

Importer, than the G.D is processed and the Importer can take the delivery of the goods, after the payment of all the necessary Port Dues & Excise Tax.

In case the goods have been processed under WeBOC SYSTEM does not accept the Importer Declaration, than the Importer may asked for additional Duties & Taxes or If the Importer wants to Contest with the views of the Customs than they can go for appeal & meet the Senior Custom Officials along with the relevant Documents & Proof to justify their claims. The Custom Authorities may defer in three basic ways : 1) Disagreement in the PCT OR HS Code Classification. 2) Not extending the benefit of the claimed SRO. 3) Disagreement with the Valuation.

If Customs satisfy with all the 03 criteria’s mentioned above i.e. PCT SRO Valuation

Page 43: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

The GD is than completed by the Concerned Group. The Importer has to than pay the Applicable Duties & Taxes after that the GD is forwarded to the Port side for Examination after which the Importer can take the Delivery of the goods after the payment necessary Port Dues.

* If Customs do not satisfy with all the 03 Criteria’s mentioned above

i.e.

PCT SRO Valuation

Than the GD is forwarded to the Port Side for Physical Examination to check the goods are in conformity to the declaration of the Importer & under the light of Examination Report GD will be completed by the concerned Group in the Custom House.

Page 44: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 45: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

The following documents are required generally by the customs for processing the B/E for the Cargo arriving at Sea Port. I Original Invoice showing complete description of the goods with value

of the each individual item II Detail Packing List showing complete Description, Quantity Gross Wt, Net Wt, Ullage Certificate. III Original Bill of Lading duly endorsed at the backside in our Favor. IV Certificate of Origin V All Govt. Sanctions, Authorization from Government Agencies

if any VII Original Letter of Credit VIII Sales Tax Registration Certificate IX Import Registration X National Tax No Certificate Copy Any other document that may be requested by the Custom to verify the

declaration of Importer

Page 46: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

The following documents are required generally by the customs for processing the B/E for the Cargo arriving at Air Port. I Original Invoice showing complete description of the goods with

value of the each individual item II Detail Packing List showing complete Description, Quantity, Numbers

of Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter III Original Airway Bill IV Certificate of Origin V Complete Catalogue/Drawing for Machinery & Equipment. VI All Govt. Sanctions, Authorization from Government Agencies

if any VII Original Letter of Credit Any other document that may be requested by the Custom to verify the

declaration of Importer

Page 47: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Further to the above there may be delays in Clearance due to following reasons:- I Non availability of the Original Documents, such as BL II Delay in meeting Custom Queries. III Strikes / Weather, Act of God, Force Major Etc IV Delays due to Non-availability of concerned officers. V Delays in receipts of payments VI Delays due to the Non-fulfillment of Shipping Companies VII Delays due to Non-availability of Trucks / Trailer

POSSBLE DELAYS

Page 48: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

PREVIOUS

PROJECTS

HANDLED

.

Page 49: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

CLIENTS PROJECTS * M/S ICI PAKISTAN LTD. C/o TRANSCAR PROJECTS LTD

ICI PTA PROJECT PORT QASIM * M/S ENGRO PAKTANK TERMINAL.

CHEMICAL STORAGE TERMINAL * M/S NOEL LGA (GERMANY)

LPG EXPANSION & MARKETING * M/S ENGRO ASAHI POLYMER & CHEMICALS.

ENGRO PVC PLANT PROJECT

* M/s TEKSER INSAAT SAANAYI

CHASMA RIGHT BANK C-65

* M/S FMC. (MARINE LOADING ARM) FOTCO OIL TERMINAL BIN QASIM * M/S SECA PAKISTAN.

KHI - HYDERABAD BY PASS * M/S TRANSCAR PROJECTS LTD.

DHABEJI PUMPING STATION W-19 * M/S TRANSCAR PROJECTS LTD.

NORTH EAST KARACHI STATION W-18

Page 50: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/S CHINA GUANGXI CORPORATION PATFEEDER CANAL PROJECT * M/S CHINA DONGFANG CORPORATION SEWERAGE TREATMENT PROJECT * M/S CHINA PETROLEUM KORANGI SEWERAGE TREATMENT * M/S CHINA YUNNAN CORPORATION

KPT JINNAH BRIDGE PHASE II * M/S CHINA NATIONAL ELECTRIC WIRE & CABLES QUEENS ROAD POWER STATION * M/S CHINA HARBOR ENGINEERING JETTY FOR ENGRO PAKTANK * M/S IJM / IGI JOINT VENTURE.

LBOD SANGHAR PROJECTS * M/S LIFE LINE (Pvt) LTD.

DHURNAL LPG GAS EXPANSION PROJECT

* M/S ENGRO PAKTANK TERMINAL.

LPG TERMINAL AT BIN QASIM

* M/S ENGRO PAKTANK TERMINAL

VCM TERMINAL HANDLING PROJECT

Page 51: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/S HYUNDAI CORP KHI OFFICE.

K.E.S.C HIGH TENSION CABLE PROJ.

* M/S HYDERABAD DEVELOPMENT AUTHORITY.

MACHINERY UNDER SPANISH GRANT * M/S CHINA YUNNAN CORPORATION.

MALDIVE SPARLIAMENT BUILDING

* M/S CHINA NATIONAL CHEM ENGG CORP. SUB CONTRACTOR FOR DONGFANG S2 PROJECT * ENGRO ASAHI TRADING (PVT) LTD EXPORT OF PVC WORLD WIDE

Page 52: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/S DESCON ENGINEERING WORKED FOR NUMBER OF PROJECTS 1) EPTL FOR LPG TERMINAL 2) EPTL FOR VCM PROJECT 3) EVTL FOR MEG PROJECT

4) FOR PARCO MID COUNTRY REFINERY

5) LASMO OIL BHIT GAS FIELD PROJECT US $ 6.5 Million Dollars

* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD HUB & PIPRI PROJECT FUNDED BY ADB £ 15.8 Million Sterling * M/S HYUNDAI HIDCO HAKAS JV

EXPORT OF HEAVY DREDGING MACHINERY US $ 2.5 Million Dollars * M/S AL - NOOR SUGAR MILLS LTD

MDF BOARD FIBRE BUILDING BOARD PLANT (LASSANI)

* PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.

US $ 4.5 Million Dollars * M/S ENGRO PAKTANK TERMINAL.

CHEMICAL STORAGE TERMINAL US $ 5.5 Million Dollars

Page 53: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/S SHV ENERGY PAKISTAN

GAS EXPANSION PROJECT US & 1.5 Million Dollars * M/S TEKSER INSAAT SANAYI VE TICCARRET

CHASMA RIGHT BANK CANNAL PROJECT C- 65 US $ 260 Million Dollars

Page 54: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

BREAK BULK

LIQUID CHEMICALS &

PETROCHEMICALS HANDLING

PROJECTS IN HAND

Page 55: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/s. SHV ENERGY LIMITED

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * M/s. JAMSHORO JOINT VENTURE LIMITED

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * M/s. AFTAB TRADERS

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * M/s. CRESS LPG

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * M/s. RELIANCE CONSULTANCY

LIQUIFIED PETROLEUM GAS (LPG) IN BULK OF VARIOUS PARCELS * M/s. ENGRO POLYMER & CHEMICAL LIMITED

VINYL CHLORIDE (VCM) IN BULK OF VARIOUS PARCELS

EDC IN BULK OF VARIOUS PARCELS

CAUSTIC SODA IN BULK OF VARIOUS PARCELS ETHELYNE IN BULK OF VARIOUS PARCELS

Page 56: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

UNDER GOING

PROJECTS

IN HAND

Page 57: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/S ENGRO FOODS LIMITED

1) LAUNCHING & SETTING UP A COMPLETE STATE OF AN ART OF O'MORE ICE CREAM PLANT

2) BRAND NEW STATE OF AN ART ENGRO RICE & PAR BOILING PLANT

3) EXPANSION OF EXISTING DAIRY MILK

PLANT. (OLPER'S MILK)

* M/s. FOUNDATION ENERGY LIMITED-1

SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

* M/s. FOUNDATION ENERGY LIMITED-II

SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

* M/S. PAK ARAB REFINERY LIMITED

SETTING UP A COMPLETE BRAND NEW ASPHALT BUILT UNIT (ABU UNIT)

* ENGRO POLYMER TRADING LIMITED

EXPORT OF PVC RESIN (SABZ BRAND) WORLD WIDE APPROXIMATE EXPORT IN M/TONS 2500 PER MONTH

Page 58: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/s. CIVIL AVIATION AUTHORITY

SETTING UP A BRAND NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06 REFUEL HYDRANT SYSTEM.

* M/s. KARKEY PAKISTAN

POWER SHIP & OIL SUPPLY TANKER

Page 59: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

VARIOUS OTHER PROJECTS

OF NATIONAL IMPORTANCE

INCLUDING HYDRO, SEWERAGE

WATER TREATMENT, DAMS

CHEMICAL INDUSTRY

OIL & GAS SECTOR

Page 60: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* M/S CHINA SINOHYDRO CORPORATION

1) GOMAL ZAM DAM HYDRO POWER

2) DUBAR KHAWAR DAM HYDRO POWER

3) KHAN KHAWAR DAM 4) KWSB K-III * M/S. INDUS REFINERY LIMITED. HI-TECH 100,000 BPSD OIL REFINERY

ON RELOCATION BASIS * M/S. JAMSHORO JOINT VENTURE

LPG EXTRACTION PLANT

* M/S. PETROSIN RAVI ENGINEERING

OIL & GAS PROJECTS LTD.

* M/S. SHELL GAS LPG PAKISTAN LTD

LPG PROJECTS / LPG GAS

* M/S. BI-WATER INTERNATIONAL

KARACHI WATER & SEWERAGE BOARD HUB & PIPRI PUMPING STATION PROJECT

* M/S. DESCON ENGINEERING LTD (HYDRO POWER PROJECTS)

Page 61: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

1) SATPARA DAM PROJECT

2) MIRANI DAM PROJECT

3) MANGLA RAISING PROJECT

4) TUNSA BARRAGE PROJECT

5) HYDERABAD WATER TREATMENT PROJECT.

* M/S. FAUJI FERTILIZER BIN QASIM LTD BREAK BULK HANDLING OF PHOSPHORIC ACID * M/S. ENGRO ASAHI POLYMER AND CHEMICAL LTD. V.C.M / MACHINERY & EQUIPMENT / EXPORT * M/S. DHA COGEN LTD.

DESALINATION / POWER PROJECT

* M/S. BAHRIA TOWN HOUSING & INFRASTRUCTURE P ROJECT

RE-LOCATION OF PLANT & MACHINERY FOR PRE- FABRICATING HOUSING

Page 62: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

* AREVA T&D PAKISTAN (PVT) LTD. 132 KV GRID STATION AT CREEK CITY, DHA * KHALID RAUF & CO., (PVT) LTD. INFRASTRUCTURE PROJECTS LAHORE RING ROAD

Page 63: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

HYDROPOWER PROJECTS

From our background experience, strength & experiences from

industrial development projects, S.M.Asghar (Pvt) Limited

has rapidly established itself as a key player in infrastructure

projects.

We successfully did the Custom Clearance & In-land

Transportation jobs of large-scale projects like dams, barrages,

highways and housing complexes.

We hold the distinction of being the first ever local company to

do the 07 Major Hydropower Projects Simultaneously of National

Importance in Pakistan

Page 64: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

HYDROPOWER

PROJECT.

Taunsa Barrage Rehabilitation and Modernization

Location: Taunsa Pakistan

Nature Of Job Custom Clearance & Inland Transportation.

Year Of Project March 2006-2007

Cost Of Project US $ 140 Million Dollars

Completion : May 2008

Page 65: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

HYDROPOWER

PROJECT

MANGLA DAM RAISING PROJECT

LOCATION Mangla

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION

COST OF

PROJECT

US $ 140 Million Dollars

Expected

Completion

Date:

September 20 2007

Page 66: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

HYDROPOWER

PROJECT.

SATPARA DAM HYDROPOWER PROJECT

LOCATION PAKISTAN

NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.

COST OF

PROJECT

US $ 140 Million Dollars

Completion : March 2007

Page 67: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name Kachhi Canal Project – Contract # KC-03

Location: Taunsa Barrage – Kot Addu

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US $ 65 MILLION DOLLARS

Completion: January 2009

Page 68: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name GOMAL ZAM HYDROPOWER PROJECT

CLIENT CHINA SIOHYDRO CORPORATION

NATURE OF

JOB

CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US $ 220 MILLION DOLLARS

Completion: 4 YEARS

Page 69: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 70: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 71: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name Duber Khwar

Location:

The project located on river Duber Khwar, right

bank tributary of Indus river near Patan in NWFP

at a distance 265 Km from Islamabad.

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF PROJECT US$ 109 million

Completion: 4 YEARS

Page 72: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Location: The project is located on Allai Khwar river, left

tributary of River Indus near Besham in NWFP, 245

km from Islamabad

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US$ 110 million

Completion: 4 YEARS

Page 73: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name MIRANI DAM

Location: In the Dasht River Basin about 30 miles (48 km)

West of Turbat Town in Makran Div of

Baluchistan.

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US$ 120 million

Completion: 4 YEARS

Page 74: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name MIRANI DAM

Location: In the Dasht River Basin about 30 miles (48 km)

West of Turbat Town in Makran Div of

Baluchistan.

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF

PROJECT

US$ 120 million

Completion: 4 YEARS

Page 75: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 76: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

LPG Storage & Handling Facilities

Project Name ENGRO PAKTANK LPG TERMINAL

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 10 million

CAPACITY 4,500 METRIC TONES OF LPG

LPG BULLETS 10 LPG bullets

Completion: 1997 -98

Page 77: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Integrated Bulk Liquid Chemical

Terminal Storage & Handling Facilities

Project Name ENGRO PAKTANK VCM TERMINAL

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND

TRANSPORTATION.

COST OF PROJECT US$ 80 million

CAPACITY 41,000 CUBIC METER STORAGE FACILITY

SPHERICAL TANK 2 SPHERICAL TANK

Completion: 1997 -98

Page 78: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

In the first phase EPTL constructed facilities for the integrated bulk liquid Chemical and Storage Terminal the first phase comprised construction of 41,000 cubic meter of storage facility the cost of first phase of the Project was US $ 60 million the tank farm is situated on reclaimed land in the PQA.

PARAXYLENE ACETIC ACID PHOSPHORIC ACID (HANDLING ONLY) VINYL CHLORIDE MONOMER ACRYLONITRILE LIQUEFIED PETROLEUM GAS MONO ETHYLENE GLYCOL

Page 79: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name ENGRO ASAHI POLYMER & CHEMICALS LIMITED

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CAPACITY 100,000 (TPA) PVC MANUFACTURING PLANT

CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD

Completion: 1999-2000

Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi Corporation (Japan), each with an 80% and 20% shareholding, respectively EAPCL is the only PVC manufacturer in Pakistan with a Capacity Of 100,000tons per annum (TPA) and its operations are located at Port Qasim Karachi. Its plant was commissioned in November 14, 1999.

Engro Asahi Polymer & Chemicals Limited

Page 80: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 81: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

ICI T11 PTA Plant

Project Name

ICI PTA T11 PLANT

Location: EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 480 million

CLIENT TRANSCAR PROJECTS UK/ FOOSTER WHEELER UK

Completion:

1998

Page 82: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 83: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 84: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

PARCO Mid Country Refinery (100, 000 BPD)

Project Name

PAK ARAB REFINERY COMPANY

Location: MULTAN, PAKISTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CLIENT DESCON ENGINEERING

Completion: 1998

Page 85: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

JAMSHORO JOINT VENTURE LIMITED SINGLE LARGEST LPG EXTRACTION PLANT

Project Name

JAMSHORO JOINT VENTURE LIMITED

Location: JAMSHORO, SINDH

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 80 million

CLIENT ASSOCIATED GROUP

Completion: 2005

Page 86: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 87: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

-------

Page 88: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 89: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

INDUS REFINERY LIMITED PAKISTAN SECOND LARGEST REFINERY

Project Name

IRL is a 100,000 bpd or 4.95 million metric tons per

annum complex fuels refinery. It will be the sixth

petroleum refinery in Pakistan and the country’s

largest refinery.

Location: PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 700 million

CLIENT INDUS REFINERY LIMITED

Completion: UNDER CONSTRUCTION

Page 90: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 91: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 92: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 93: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

RELOCATION OF 100,000 BARRELS CAPACITY REFINERY PETRO CANADA REFINERY TO PAKISTAN PORT QASIM

Page 94: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 95: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 96: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 97: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 98: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

TRANSASIA REFINERY LIMITED PAKISTAN SECOND LARGEST REFINERY

Project Name

TRL is a 100,000 bpd or 4.00 million metric tons per

annum complex fuels refinery. It will be the state of an

Art petroleum refinery in Pakistan and will be one of

the country’s largest refinery.

Location: PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 700 million

CLIENT TRANSASIA REFINERY LIMITED

Completion: UNDER CONSTRUCTION

Page 99: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

TRANASIA REFINERY LIMITED

Page 100: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 101: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 102: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 103: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

DHA DESALINATION PLANT 3 MIGD & 94 MW POWER PLANT KARACHI

Project Name

DHA DESALINATION & POWER PLANT

PAKISTAN FIRST EVER SEA DESALINATION

& POWER PLANT

Location: DHA, PHASE VIII. KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 million

CLIENT DHA COGEN LIMITED (DCL)

Completion: UNDER CONSTRUCTION

TOTAL VALUE OF L/C ESTABLISHED: Siemens AG Germany $ 41,400,000 $ 33,120,000 Siemens AG Germany € 6,550,000 € 5,240,000 Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241 Lincas Electro Vertibas € 295,500 € 236,390

Page 104: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 105: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 106: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 107: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 108: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

KARACHI INTERNATIONAL CONTAINER TERMINAL (KICTL) KARACHI

Project Name

KARACHI INTERNATIONAL CONTAINER

TERMINAL (KICTL)

PHASE III EXPANSION PROJECT

Location: WEST WHARF ROAD, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 400 million

CLIENT KICTL PAKISTAN

Completion: UNDER CONSTRUCTION

Page 109: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 110: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

BAHRIA TOWN (PVT) LIMITED RAWALPINDI

Project Name

BAHRIA TOWN (Pvt) LIMITED

AWAMI VILLAS PROJECT.

TOTAL # OF VILLAS 8000

Location: RAWALPINDI, PAKISTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 120 million

CLIENT BAHRIA TOWN (Pvt) LIMITED

Completion: UNDER CONSTRUCTION/ PROGRESS

Page 111: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

HEALTH, SAFETY AND ENVIRONMENT

Page 112: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

FAUJI FERTILIZER ENERGY COMPNAY LIMITED (FFCEL) 49.5 MW WIND ENERGY

PROJECT AT JHAMPIR, KARACHI

Project Name

FFCEL WIND ENERGY PROJECT OF CAPACITY 49.5

MW

Location: JHAMPIR, NEAR THATTA

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 110 million

CLIENT DESCON ENGINEERING LIMITED

Completion: UNDER FINAL STAGES OF COMPLETION

Page 113: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 114: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 115: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 116: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 117: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name

49.5 MW FFCEL FIRST WIND POWER PROJECT

Location: JHAMPIR, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 Million

Completion: 25TH DECEMBER 2012

Page 118: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name

49.5 MW FOUNDATION WIND ENERGY-1 PROJECT

Location: JHAMPIR, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 Million

Completion: SEPTEMBER 2014

Page 119: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 120: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 121: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 122: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name

49.5 MW FOUNDATION WIND ENERGY-II (Pvt) Ltd.

PROJECT

Location: JHAMPIR, KARACHI

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 130 Million

Completion: SEPTEMBER 2014

Page 123: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 124: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 125: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 126: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 127: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 128: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 129: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name

ASPHALT BUILT UNIT PROJECT (ABU)

FOR PARCO

Location: PARCO MID COUNTRY REFINERY, MULTAN

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 30 Million

Completion: DECEMBER 2012

Page 130: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name

NEW KHANKI BARRAGE HYDROPOWER PROJECT

Location: RIVER CHENAB, DISTT GUJRANWALA

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 70 Million

Completion: SEPTEMBER 2016

Page 131: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 132: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 133: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 134: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

JABBAN HYDROPOWER PROECT

Project Name

JABBAN HYDROPOWER PROJECT

Location: JABBAN HYDROELECTRIC POWER STATION PROJECT

SITE IS LOCATED IN DISTRICT MALAKAND (PATA)

KHYBER PAKHTUNKHWA AT A DISTANCE OF 210 KM

FROM ISLAMABAD, 45 KM FROM THE CITY OF MARDAN.

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT PAK RUPEES 3.80 BILLION

Completion: MARCH 2012

Page 135: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 136: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 137: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Project Name

METRO HABIB CASH & CARRY PAKISTAN (PVT) LTD

Location: HEAD OFFICE THOKAR NIAZ BAIG, MULTAN RD, LHR.

NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT US$ 3.4

Completion: STILL UNDERGOING

Page 138: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 139: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL
Page 140: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

S.M.Asghar (Pvt) Limited believes that

ACCIDENTS DON’T JUST happen, they’re caused, and it is the duty

of the Company to remove and minimize all possible causes of Accidents.

We at S.M.Asghar (Pvt) Limited takes preliminary guide to the

recognition of potential hazards to the following.

M O S T - S A F E - P L A C E S M MACHINERY : Sources of Mechanical Power O OPENINGS : Pits, Sumps, Ducts & Drains S STACKS : Stores Materials, Raw & Process. T TOOLS : All type of Tools.

Page 141: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

S A F E - P L A C E S

S STRUCTURE : Floors, Walls, Ceilings, Road A ATMOSPHERE : Dust, gases, fumes & Spray. F FIRE : Fire Points & Fire Exits. E ELECTRICITY : Wires, Cables, Switches. P PRESSURE VESSEL : Boilers & Compressors L LADDERS : Steps, trestles & Scaffolds A ATTIRE : Protective Clothing, Helmets C CRANES : Hoist, Derricks & Ropes / Hooks E EXPLOSIVES : Flammable Liquids, LPG, Radioactive.

S For SIGNALS : Warning Light, Telephone Buzzers.

As a Company Policy we take care of our Employee to the best Standards because Employees are Our Assets.

Page 142: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

We provide following safety Equipments to our Port staff such as :

Safety Belts : They are provided to the Staff who Works On the Ship /Vessel (VCM/LPG)

Emergency Lights : In case of Night Delivery at the Port

Premise/ Highways

Safety Helmets : At time of delivery at the Port Area

During Loading/ Unloading Heavy Machineries/ Hazardous Cargo

Page 143: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

Safety Boots : At the Ship Derricks & the Port Premises

Safety Glasses : They are provided to the Staff who

Work on the Ship /Vessel.

Page 144: Introduction Of S.M.Asghar (Pvt) Ltd For SEDL

HEAVY & SUPER HEAVY LIFT TRANSPORTATION EXPERIENCE

WE CALLED THIS AS ABNORMAL LOADS