Introduction of PT. Berlian Amal Perkasa

Transcript of Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer,...

Page 1: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

Introduction of PT. Berlian Amal Perkasa

Page 2: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

Company Name PT. Berlian Amal Perkasa (BAP)

Business Contents Construction service including equipment rental with operator

Establish/Capital May, 2014 (Start biz from Dec, 2014) / USD 17,430,000

Shareholders Mitsubishi Corporation (47%, Japan)

Nikken Corporation (20%, Japan) *100% subsidiary of Mitsubishi Corp

Local Company Shareholder (33%, Indonesia)

Business Partner PT. Guna Teguh Abadi (Contractor, Indonesia)

Rental Fleet 214 units (Crane 102, AWP 41, Others 71) *as of Jun, 2019

Employee 357person (Operator/Helper 291, Mechanic 23) *as of May, 2019

Head Office Sovereign Plaza 16F, Jl. TB. Simatupang Kav. 36 Jakarta

Machine Yard Jl. Raya Bojonegara RT-01/W-04 Desa Kedaleman Kec.

Cibeber Kotamadya Cilegon, Banten

1. Basic Profile

Page 3: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

2. Location

Jakarta Head Office

Cilegon Machine Yard

Planning

open new

yard in

East JKT

Page 4: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

■Product Line-up:

3. Rental Fleet Line-up

Lifting Crane Aerial Platform PlanningCrane

Truck Mounted Crane

Aerial Working Platform

NEW

PlanningVehicle Truck

Tele-handler

Forklift

Page 5: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

4. Organization Chart

197 operators

President DirectorShintomo

Marketing & Operation DivGM: Kiyoshi

Administration Div

GM: Budhi, AGM: Cliff

Cord. DeptKiyoshi

Mech. DeptOsada

HR & GABudhi

Marketing Dept BKiyoshi

Accounting & Tax Cliff

8 operator controllers

22 mechanics

230 operators / 50 helpers

4 staffs3 staffs

2 supporting staff

6 staffs

7 staffs

4 staffs

3 supporting staff

1 lifting engineer

1 staff

Corporate Strategy OfficeTsuchiya

Safety Office

Marketing Dept ATsuchiya

5 staffs

Page 6: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

5. BAP Safety Program

Brand new and good

quality used equipment

Preventative inspection

(Previous & Monthly Inspection)

Replacing consumable

parts in maker standard

Quick repair on site

Moment limiter definitely

installed

Attaching caution sticker

Safety accessories

installer in the crane

Monthly site survey by

operator controller

High standard operator

interview and testing

Internal Training

supported by Japanese

Crane company and

manufacturers

Dispatch Operator

Controller to Japan for

training

Periodical MCU

Safety lesson of

equipment for foreman,

workers at client site

Providing materials

(accident poster, signal

hand book etc.)

Engineering advice for

equipment selection

based on client drawing

Ground condition

confirmation advice

Ass/Disass service

Equipment Operator Others

Page 7: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

6. Various Value

We provide a total solution of machinery supply

Medium & ShortTerm Rental

Sales of 2nd hand equipment

(w/ buy back condition)

Contract Work

Page 8: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

7. Owning Equipment

■ BAP

Equipment Cap Qty

Crawler Crane 1350t (1800t) 2

Crawler Crane 800t 1

Crawler Crane 550t 4

Crawler Crane 450t 1

Crawler Crane 300t 6

Crawler Crane 250t 3

All Terrain Crane 60t~220t 15

Rough Terrain Crane 40-80t 25

Multi Axel 45t 39

Boom / Scissors Lift 10-30m 27

■ GTA(Partial)

Equipment Cap Qty

Crawler Crane 180t~250t 16

Crawler Crane 55-90t 18

All Terrain Crane 60-220t 6

Rough Terrain Crane 25t-80t 62

Boom/Scissors Lift 10-38m 41

Truck Mounted Crane 5-15t 25

Fork Lift 5-15t 6

Telehandler 4t-6t 17

TruckLow/Flat Bed

Fuel/Water

Tank19

Excavator 20t 4

Page 9: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

8. Experience List

No Type of Project Project Name Year Location

1 Oil & Gas Plant BP Tangguh LNG plant Train 3 2017- Bintuni West Papua

2 Oil & Gas Plant Pertamina Cilacap Blue Sky Project 2018

3 Oil & Gas Plant Matindok Gas Plant 2015-2016 Matindok, Central Selawesi

4 Oil & Gas Plant Pertamina Shut Down Maintenance 2016 Dumai/Cilacap/Balikpapan etc

5 Oil & Gas Plant DSLNG Banggai LNG Plant O&M 2016- Luwuk, Central Selawesi

6 Oil & Gas Plant Conoco Philips O&M 2016- Jambi, South Sumatra

7 Chemical Plant PAU Anmonia Plant 2016-2018 Luwuk, Central Selawesi

8 Chemical Plant Pusri 2B 2015-2016 Palembang, South Sumatra

9 Chemical Plant Chandra Asri ECCx 2015- Anyer, Banten

10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten

11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten

12 Chemical Plant Asahimas Glass Factory 2015- Cikampek

13 Infrastructure (Train) Jakarta LRT 2017- Jakarta

14 Infrastructure (Train) JKT MRT CP101-106 2015-2018 Cilandak, Jakarta

15 Infrastructure (Road) Jakarta-Cikampek Toll Road 2017- Jakarta-Cikampek

16 Infrastructure (Road) Semarang-Batang Toll Road 2017- Semarang

17 Infrastructure (Road) Trans Sumatera 2018- Lampung

18 Infrastructure (Road) TJP Access Road 2015-2016 Tanjung Priok, Jakarta

19 Infrastructure (Port) Patimban Port 2018- Suban, West Java

20 Infrastructure (Mining) Adaro Kalimantan 2019- Cental Kalimantan

21 Industrial Plant (Fire Power Plant) PLTU Lontar Expansion #4 Coal fired PP 315MW 2016- Balaraja, Tangerang

22 Industrial Plant (Fire Power Plant) PLTU Central Jawa Coal-fired 2000MW 2016- Batang, Central Java

23 Industrial Plant (Fire Power Plant) PLTU Tanjung Jati B Unit5&6 2000MW 2017- Jepara, Central Java

24 Industrial Plant (Fire Power Plant) PLTGU Jawa-2 Tanjung Priok 800MW 2016- Tanjung Priok, Jakarta

25 Industrial Plant (Fire Power Plant) PLTGU Muara Karang 500MW 2018- Pluit, Jakarta

26 Industrial Plant (Geothermal Power) PLTA Peusangan Hydro Power Plant 86MW 2016-2017 Ache, North Sumatra

27 Industrial Plant (Geothermal Power) PLTA Rajamandara Hydro Power Plant 47MW 2016 Bandung

28 Industrial Plant (Steel) Krakatau Nippon Steel Sumikin 2015-17 Cilegon, Banten

29 Industrial Plant (Steel) Krakatau Osaka Steel 2015-17 Cilegon, Banten

30 Industrial Plant (Cement) Semen Padan 2016 Padan, Central Sumatra

Page 10: Introduction of PT. Berlian Amal Perkasa · 10 Chemical Plant Asahimas Chemical Plant 2016- Anyer, Banten 11 Chemical Plant SRI-Chandra Asri/Michelin 2016 Anyer, Banten 12 Chemical

8. Experience List

No Type of Project Project Name Year Location

31 Industrial Factory (Vehicle) Mitsubishi Motor Krama Yudah Indonesia 2015-2017 GIIC, Cikarang

32 Industrial Factory (Vehicle) MAXXIS Tire 2016-2017 GIIC, Cikarang

33 Industrial Factory (Vehicle) DAIKI 2016-2017 GIIC, Cikarang

34 Industrial Factory (Vehicle) Hanya 2016 GIIC, Cikarang

35 Industrial Factory (Vehicle) Toyota PI Factory 2016 GIIC, Cikarang

36 Industrial Factory (Vehicle) Fuji Seat 2016 Surya Cipta

37 Industrial Factory (Vehicle) Sannohashi 2015 KIIC, Karawang

38 Industrial Factory (Vehicle) Toyota MMIN New Engine 2015 KIIC, Karawang

39 Industrial Factory GTN Data Center (Lippo) 2016 GIIC, Cikarang

40 Industrial Factory AJINOMOTO 2016 KIIC, Karawang

41 Industrial Factory Mitsubishi Material 2016 MM2100, Cibitung

42 Industrial Factory TOYO RIKO 2016 MM2100, Cibitung

43 Industrial Factory Omron 2015 Cikarang

44 Industrial Factory HITACHI Construction Equipment 2015 Cibitung

45 Industrial Factory YKK 2015 GIIC, Cikarang

46 Industrial Factory KAO 2015 KIIC, Karawang

47 Industrial Factory Panasonic 2018 Cibitung, Bekasi

48 Shopping Mall AEON JGC 2015-17 Cakung, Jakarta

49 Ware House Fuji Trans 2016 GIIC, Cikarang

50 Ware House NITTSU SHOJI 2016 KIM, Karawang

51 Ware House MEIRA 2016 KIM, Karawang

52 Ware House KAWANISHI 2016 MM2100, Cibitung

53 Ware House HITACHI LOGISTIC 2015 Cikarang

54 Ware House KAMIGUMI 2015 GIIC, Cikarang

55 High Rise Building PCPD Building 2016- Sudirman, Jakarta

56 High Rise Building Tokyu Branz 2016- Simatupang, Jakarta

57 High Rise Building TOTO Head Office 2016 Slipi, Jakarta

58 High Rise Building Fairmont HOTEL 2015 Senayan, Jakarta

59 High Rise Building Wijaya Residence 2018-2019 South Jakarta