A Case Study In Ghana Yakubu Iddirisu CEO, Geological Management Consultancy Ltd(GEOMAN CONSULT.)
Introduction of Pre –Inking @ GEOMAN
4
Manoj Ahire
-
Upload
manoj-ahire -
Category
Documents
-
view
67 -
download
0
Transcript of Introduction of Pre –Inking @ GEOMAN
Manoj Ahire
To reduce the start – up waste of Geoman Editions by approx. 150 copies.
To involve no extra expense.
Creation of Pre – Inking Sequence ( Ink Fountain Roller activation at Crawl Speed )
Activation of Ink Duct Roller for a certain rotations on actuation of Faster.
Modification of present sequence.
Putting impression roller on at very low speed (0 – 4000 cph)
Minimizing gap between water and ink touching the plate cylinder.
Activation of inking roller early to facilitate ink charging.