    CONTRACTS AND CONSTITUTION-LAW

    OF CONTRACTS

  • 8/9/2019 Introduction Contracts Management

    2/38

    2

    CONTRACT MANAGEMENT

    CONTRACTS;

    AND ITS MANAGEMENT

  • 8/9/2019 Introduction Contracts Management

    3/38

    3

    CONTRACTS

    THE WORD CONTRACT IS DERIVED

    FROM LATIN WORD CONTRACTUM

    WHICH MEANS DRAWN TOGETHER;

    EVERY PROMISE OR EVERY SET OF

    PROMISES FORMIMG THE

    CONSIDERATION FOR EACH OTHERSIS AN AGREEMENT;

  • 8/9/2019 Introduction Contracts Management

    4/38

    4

    CONTRACTS (CONTD)

    CONTRACT IS AN AGREEMENT BETWEEN

    TWO OR MORE PARTIES, WHICH IS

    ENFORCEABLE BY LAW;

    TO FORM AN AGREEMENT THERE MUST

    BE A PROPOSAL OR OFFER BY ONE PARTY

    AND ITS ACCEPTANCE BY ANOTHER;

    AGREEMENT= OFFER + ACCEPTANCE;

  • 8/9/2019 Introduction Contracts Management

    5/38

  • 8/9/2019 Introduction Contracts Management

    6/38

    6

    ESSENTIALS OF A VALID CONTRACT

    (CONTD)

    OBJECT OF AGREEMENT MUST BE LAWFUL;

    AGREEMENT MUST NOT HAVE BEEN

    EXPRESSELY DECLARED VOID BY ANY LAW INFORCE IN THE INDIA;

    AGREEMENT MUST BE CERTAIN AND NOTVAGUE OR INDEFINITE;

    LEGAL FORMALITIES (STATUTORY

    REQUIREMENTS OF MAKING IN WRITING, INPRESENCE OF WITNESSES OR REGISTERED ORSIGNED BY AUTHORIZED PERSONS) MUST BECOMPLIED WITH;

  • 8/9/2019 Introduction Contracts Management

    7/38

    7

    REQUIREMENTS OF A VALID

    CONTRACT

    MUST BE UNCONDITIONAL;

    MUST BE MADE AT THE PROPER PLACE;

    MUST CONFORM TO THE TERMS OF OBLIGATIONS;

    MUST BE MADE AT THE PROPER TIME;

    MUST BE MADE IN PROPER FORM;

    PARTIES MUST BE ABLE AND WILLING TOPERFORM ITS OBLIGATION;

    THERE MUST BE REASONABLE OPPORTUNITY FOR

    INSPECTION; MUST BE MADE TO THE PROPER PERSON;

    MUST BE FOR FULL AMOUNT;

  • 8/9/2019 Introduction Contracts Management

    8/38

    8

    OVERVIEW OF CONTRACT LAW

    LAW OF CONTRACTS MAY BE DESCRIBED AS THEENDEAVOUR OF PUBLIC AUTHORITIES TOESTABLISH A POSITIVE SANCTION FOR THE

    EXPECTATION OF GOOD FAITH WHICH HASGROWN UP IN THE MUTUAL DEALINGS OF MEN;

    IN CIVIL LAW OR THE LAW OF THE STATE ORTHE LAND, LAW SIGNIFIES A COMMAND FROM ASUPERIOR AUTHORITY PRESCRIBING A COURSEOF ACTION, DISOBEDIENCE WHICH WOULD

    ENTITLE PUNISHMENT; THE OBJECT OF THE LAW OF CONTRACTS IS TO

    REGULATE THE DEALINGS BETWEENINDIVIDUALS/ PARTIES;

  • 8/9/2019 Introduction Contracts Management

    9/38

    9

    OVER VIEW OF CONTRACT LAW

    (CONTD)

    LAW OF CONTRACTS IS NOT THE

    WHOLE LAW OF AGREEMENTS NOR

    IS IT THE WHOLE LAW OF

    OBLIGATIONS; IT IS THE LAW OF

    THOSE AGREEMENTS, WHICH

    CREATE OBLIGATION AND THOSEOBLIGATIONS WHICH HAVE THEIR

    SOURCE IN AGREEMENT;

  • 8/9/2019 Introduction Contracts Management

    10/38

    10

    OVER VIEW OF CONTRACT LAW

    (CONTD)

    BROAD CLASSIFICATION OF LAW- PUBLICAND PRIVATE;

    PUBLIC LAW DEALS WITH THEADMINISTRATIVE POWERS OF STATE ANDALSO CERTAIN RELATIONS BETWEEN THESTATE AND THE INDIVIDUAL;

    PRIVATE LAW DEALS WITH THE RIGHTSOF SUBJECTS INTERSE;

    INDIAN CONTRACT ACT 1872;

  • 8/9/2019 Introduction Contracts Management

    11/38

    11

    GOVERNMENT AND PRIVATE

    CONTRACTS

    MOST OF THE MAJOR INFRASTRUCTUREPROJECTS IN OUR COUNTRY FOR THE

    PRESENT ARE BEING EXECUTED BYGOVERNMENT AND HENCE MOST OF THECONTRACTS ARE PUBLIC CONTRACTSGOVERNED BY PUBLIC LAW;

    MAJOR PART OF THE GOVERNMENTEXPENDITURE IS THROUGH THEPROCUREMENT OF GOODS, SERVICES ANDCONSTRUCTION ACTIVITY;

  • 8/9/2019 Introduction Contracts Management

    12/38

    12

    PUBLIC PROCUREMENT

    PUBLIC PROCUREMENT IS

    ACQUISITION OF GOODS, SERVICES

    AND PUBLIC WORKS IN A TIMELY

    MANNER THAT RESULTS IN BEST

    VALUE TO THE GOVERNMENT AND

    PEOPLE

  • 8/9/2019 Introduction Contracts Management

    13/38

    13

    CONSTITUTION AND CONTRACTS

    ARTICLES 298, 299, 14 AND 19

  • 8/9/2019 Introduction Contracts Management

    14/38

    14

    ARTICLE 298, POWER TO CARRY ON

    TRADE ETC.

    Under this article, Executive power of the Unionand States extends to carrying on of any trade,

    disposal of property and making of contracts forthe same I.e. Public Procurement;

    For such PP, the Government does not require anyadditional powers, it can have by entering tocontracts;

    The power to enter into contracts for PP istherefore expressly vested in the Governmentunder this Article.

  • 8/9/2019 Introduction Contracts Management

    15/38

  • 8/9/2019 Introduction Contracts Management

    16/38

    16

    ARTICLE 299: CONSTITUTIONAL

    REQUIREMENTS OF A GOVERNMENTCONTRACT (CONTD)

    NEITHER PRESIDENT NOR GOVERNOR SHALL BEPERSONALLY LIABLE IN RESPECT OF ANY CONTRACTOR ASSURANCE MADE OR EXECUTED FOR PURPOSEOF CONSTITUTION OR ANY ENACTMENT RELATINGTO GOI IN FORCE NOR SHALL ANY PERSON MAKINGOR EXECUTING ANY SUCH CONTRACT ORASSURANCE ON BEHALF OF ANY OF THEM BEPERSONALLY LIABLE IN RESPECT THEREOF;

    IN ORDER THAT PUBLIC FUNDS MAY NOT BEDEPLETED BY CLANDESTINE CONTRACTS MADE BY

    ANY AND EVERY PUBLIC SERVANT THERE SHOULDBE DEFINITE PROCEDURE ACCORDING TO WHICHCONTRACTS MUST BE MADE.

  • 8/9/2019 Introduction Contracts Management

    17/38

    17

    EQUALITY OF OPPORTUNITY IN THE

    MATTER OF GOVERNMENT CONTRACTS

    ARTICLE 19(1)(G) CONFERS ON ALL CITIZENS AFUNDAMENTAL RIGHT TO PRACTICE ANYPROFESSION (INCLUDES TAKING AND EXECUTINGGOVT CONTRACTS) CARRY ON ANY OCCUPATION,TRADE OR BUSINESS;

    FAIRPLAY IN ACTION MUST BE THE BASIS OF THEPOLICY OF THE STATE- ART 14 APPLIES ALSOMATTERS OF GOVERNMENT POLICY AND IF THEPOLICY OR ANY ACTION OF GOVERNMENT EVEN INCONTRACTUAL MATTERS FAILS TO SATISFY THE

    TEST OF REASONABLENESS IT WOULD BEUNCONSTITUTIONAL; BASIC REQUIREMENTS OF ART14 IS FAIRNESS IN ACTION BY STATE;

  • 8/9/2019 Introduction Contracts Management

    18/38

    18

    SUMMARY OF GENERAL PRINCIPLES

    EMBODIED IN CONSTITUTION

    PROFESSION OF DOING GOVT CONTRACTS IS AFUNDAMENTAL RIGHT UNDER CONSTITUTION;

    PERSONS PRACTICING GOVT CONTRACTSCANNOT BE TREATED ARBITRARILY ORCAPRICIOUSLY;

    GOVT CANNOT LIGHTLY BRUSH ASIDE ACONTRACTOR WHOSE TENDER IS THE LOWEST;REASONS FOR REJECTIONS SHOULD BE

    REASONABLE, COGENT AND ACCEPTABLEWITHOUT ARBITRARINESS OR DISCRIMINATION;

  • 8/9/2019 Introduction Contracts Management

    19/38

    19

    PRINCIPLES OF PUBLIC PROCUREMENT

    PUBLIC PROCUREMENT SYSTEM CAN

    BE SAID TO BE WELL FUNCTIONING

    IF IT ACHIEVES THE OBJECTIVES OF

    TRANSPARENCY, COMPETITION,

    ECONOMY AND EFFICIENCY

    FAIRNESS AND ACCOUNTABILITY;

  • 8/9/2019 Introduction Contracts Management

    20/38

    20

    PRINCIPLES OF PUBLIC PROCUREMENT

    (CONTD)

    PP INCLUDES PROCUREMENT BY GOVERNMENTAND BY STATUTORY BOARDS AND NON-MINISTERIAL BODIES;

    PP MUST FOLLOW PRESCRIBED COMPETITIVEPROCEDURES AND THE RULES GIVE A MAJORWEIGHT TO FAIRNESS AND EQUITY;

    PP IS ALSO SUBJECT TO OVERSIGHT BYLEGISLATURE AND AUDIT (IN ADDITION TOINTERNAL ACCOUNTABILITY MECHANISMS);

    MISTAKES IN PP CAN HAVE VAST POLITICALREPERCUSSIONS OWING TO THE FOCUS THATTHE MEDIA AND THE PUBLIC PLACE ON THESUBJECT;

  • 8/9/2019 Introduction Contracts Management

    21/38

    21

    PRINCIPLES OF PUBLIC PROCUREMENT

    (CONTD)

    A KEY PRINCIPLE OF GOOD GOVERNANCEPRESUPPOSES CONSISTENT PRINCIPLES

    AND REGULATIONS FOR PROCUREMENT; INFORMATION AND DOCUMENTATION ON

    THESE RULES SHOULD BE WIDELYAVAILABLE AND THE RULES SHOULD BEENFORCED FAIRLY AND CONSISTENTLY;

    THERE SHOULD BE A WELL UNDERSTOODSYSTEM FOR REGISTERING ANDRESOLVING COMPLAINTS SPEEDILY;

  • 8/9/2019 Introduction Contracts Management

    22/38

    22

    PRINCIPLES OF PUBLIC PROCUREMENT

    (CONTD)

    THERE SHOULD BE A WELLFUNCTIONING SYSTEM FOR DISPUTE

    RESOLUTION AND CHECKS ON THEARBITRARY BEHAVIOUR OFPROCUREMENT ENTITIES AND ONTHE INCONSISTENT EXERCISE OF

    DISCRETIONARY POWERS INCONTRACT AWARD, ENFORCEMENTAND MANAGEMENT;

  • 8/9/2019 Introduction Contracts Management

    23/38

    23

    PRINCIPLES OF PUBLIC PROCUREMENT

    (CONTD)

    ACCOUNTABILITY AND TRANSPARENCYARE VITAL TO PROCUREMENTMANAGEMENT;

    LACK OF OVERSIGHT MECHANISM TOENSURE ACCOUNTABILITY UNDERMINESTHE CAPACITY OF GOVERNMENTS TOSECURE THE CONFIDENCE OFCONTRACTORS AND SUPPLIERS IN THEPUBLIC PROCUREMENT PROCESS ANDTHE TRUST OF CITIZENS IN THE PROPERUSE OF PUBLIC FUNDS;

  • 8/9/2019 Introduction Contracts Management

    24/38

    24

    PRINCIPLES OF PUBLIC PROCUREMENT

    (CONTD)

    TRUST AND CONFIDENCE CAN BE ESPECIALLYERODED BY SECRECY IN PROCUREMENTTRANSACTIONS AT THE LOCAL LEVELS

    (ALTHOUGH A DEGREE OF CONFIDENTIALITY ISESSENTIAL TO PROTECT BUSINESS PRIVACY ANDTHE LEGITIMATE INTERESTS OF INDIVIDUALBIDDERS)

    TRANSPARENCY REDUCES UNCERTAINTY ANDINHIBITS CORRUPTION IN PROCUREMENT BY

    ASSURING EQUALITY OF ACCESS TO INFORMATIONFOR ALL BIDDERS BEFORE, DURING AND AFTERTHE BIDDING PROCESS;

    THE SYSTEM SHOULD ALSO PROTECT THEINTERESTS OF THE CITIZENS;

  • 8/9/2019 Introduction Contracts Management

    25/38

    25

    PRINCIPLES OF PUBLIC PROCUREMENT

    (CONTD)

    SOUND PP POLICIES AND PRACTICES ARE

    THUS AMONG THE ESSENTIAL ELEMENTS

    OF GOOD GOVERNANCE; GOOD PRACTICES REDUCE COSTS AND

    PRODUCE TIMELY RESULTS;

    POOR PRACTICES LEAD TO WASTE AND

    DELAYS AND ARE OFTEN THE CAUSE FORALLEGATIONS OF CORRUPTION AND

    GOVERNMENT INEFFCIENCY;

  • 8/9/2019 Introduction Contracts Management

    26/38

    26

    KET ELEMENTS OF PUBLIC

    PROCUREMENT

    CLEAR, COMPREHENSIVE ANDTRANSPARENT LEGAL FRAMEWORK;

    CLEAR CUT FUNCTIONALRESPONSIBILITIES ANDACCOUNTABILITIES FOR PROCUREMENTFUNCTION;

    EFFICIENT INSTITUTIONAL FRAMEWORK;

    ROBUST MECHANISM FOR ENFORCEMENTOF POLICY, RULES AND REGULATIONS;

    WELL TRAINED PROCUREMENT STAFF

  • 8/9/2019 Introduction Contracts Management

    27/38

    27

    ESSENTIALS OF GOOD PUBLIC

    PROCUREMENT

    ECONOMY: BY OPEN COMPETITION;

    EFFICIENCY: BY EFFECTIVE

    PROCESSES;

    FAIRNESS: BY NON-DISCRIMINATION;

    TRANSPARENCY:

    BY OPENNESS; ACCOUNTABILITY: BY ADHERENCE

    TO PROCUREMENT LAW OR ACT;

  • 8/9/2019 Introduction Contracts Management

    28/38

    28

    EQUALITY OF OPPORTUNITY IN

    PUBLIC PROCUREMENT

    MERE COMPLIANCE TO THE INDIAN CONTRACT ACTIS NOT ENOUGH IN CASE OF GOVERNMENTCONTRACTS, BUT THEY MUST ALSO SATISFYARTICLE 14 AND 19

    ARTICLE 14: EQUALITY BEFORE LAW- THE STATESHALL NOT DENY TO ANY PERSON EQUALITYBEFORE THE LAW OR THE EQUAL PROTECTION OFTHE LAWS WITHIN THE TERRITORY OF INDIA;

    HENCE TO SATISFY ARTICLES 14 &19 INGOVERNMENT CONTRACTS THE PROCESS OFPROCUREMENT SHOULD BE FAIR &REASONABLE,FAIRNESS IN ACTION BEING THE BASICREQUIREMENT;

  • 8/9/2019 Introduction Contracts Management

    29/38

    29

    EQUALITY OF OPPORTUNITY IN

    PUBLIC PROCUREMENT (CONTD)

    TAKING GOVT CONTRACTS IS A PROFESSIONALOCCUPATION TO WHICH EVERY ONE HAS AFUNDAMENTAL RIGHT;

    PP HAS TO BE OPEN FOR ALL WHO ARE ELIGIBLE; SC HAS HELD TODAY THE GOVERNMENT IN A

    WELFARE STATE IS THE REGULATOR ANDDISPENSOR OF SPECIAL SERVICES ANDPROVIDER OF A LARGE NUMBER OFBENEFITS,JOBS,CONTRACTS,LICENSES,QUOTAS,

    MINERAL RIGHTS ETC. THE GOVT POURS FORTHWEALTH, MONEY,BENEFITS, SERVICES,CONTRACTS, QUOTAS AND LICENSES..

  • 8/9/2019 Introduction Contracts Management

    30/38

    30

    PROCUREMENT LAW

    TO REGULATE PUBLIC PROCUREMENT OFGOODS, CONSTRUCTION AND SERVICES SO AS TOPROMOTE THE OBJECTIVES OF:

    MAXIMIZING ECONOMY AND EFFICIENCY INPROCUREMENT;

    FOSTERING AND ENCOURAGING PARTICIPATIONIN PROCUREMENT PROCEEDINGS BY SUPPLIERSAND CONTRACTORS, ESPECIALLY WHERE

    APPROPRIATE, PARTICIPATION BY SUPPLIERS ANDCONTRACTORS REGARDLESS OF NATIONALITYAND THEREBY PROMOTING INTERNATIONALTRADE;

  • 8/9/2019 Introduction Contracts Management

    31/38

    31

    PROCUREMENT LAW (CONTD)

    PROMOTING COMPETITION AMONG SUPPLIERSAND CONTRACTORS FOR THE SUPPLY OF THEGOODS,CONSTRUCTION OR SERVICES TO BE

    PROCURED; PROVIDING FOR THE FAIR AND EQUITABLE

    TREATMENT OF ALL SUPPLIERS ANDCONTRACTORS;

    PROMOTING THE INTEGRITY OF, ANDFAIRNESS AND PUBLIC CONFIDENCE IN THE

    PROCUREMENT PROCESS; AND ACHIEVING TRANSPARENCY IN THE

    PROCEDURES RELATING TO PROCUREMENT;

  • 8/9/2019 Introduction Contracts Management

    32/38

    32

    VOLUME OF PROCUREMENT

    VOLUME OF PROCUREMENT IS VERYHIGH; SO ARE THE STAKES;

    GOK ANNUAL PROCUREMENT WASASSESSED AS ABOUT RS.13,000/- CRORESIN 2001;

    IRREGULARITIES IN PROCUREMENT,MALPRACTICES/ CORRUPTIVE PRACTICESIN PROCUREMENT ARE A COMMON AUDITOBJECTION; VIGILANCE CASES; SOMEEVEN LEAD TO FALL OF GOVERNMENT;

  • 8/9/2019 Introduction Contracts Management

    33/38

    33

    THE UNCITRAL MODEL

    PROCUREMENT LAW

    THE UNCITRAL MODEL LAW ONPROCUREMENT OF GOODS, CONSTRUCTIONAND SERVICES WAS ADOPTED BY THEUNITED NATIONS COMMISSION ONINTERNATIONAL TRADE LAW (UNCITRAL) ATITS TWENTY-SEVENTH SESSION; THECOMMISSION HAS ALSO ISSUED A GUIDE TOENACTMENT OF THE UNCITRAL MODEL LAWON PROCUREMENT OF GOODS.CONSTRUCTION AND SERVICES (A/CN.9/403)

  • 8/9/2019 Introduction Contracts Management

    34/38

    34

    PROCUREMENT LAW (CONTD)

    MANY COUNTRIES HAVE A PROCUREMENT LAW;

    SOME COUNTRIES INCLUDING INDIA HAVECODES AND MANUALS;

    HOWEVER THESE ARE ISSUED BYADMINISTATIVE MINISTRIES /DEPARTMENTSAND COULD BE CHANGED/REVISED RATHEREASILY; MAY LEAAD TO INCONSISTENCIES;

    THE REVISION/MODIFICATION OF THE LAW/ACTREQUIRES THE APPROVAL OFPARLIAMENT/ASSEMBLY WHICH IS RATHERTOUGH/DIFFICULT; IT WILL ENSURECONSISTENCY;

  • 8/9/2019 Introduction Contracts Management

    35/38

    35

    PROCUREMENT LAW (CONTD)

    IN INDIA PROCUREMENT PROCEDURES ARECONTAINED IN THE GENERAL FINANCIAL RULES(GFR) WHICH HAS BEEN REVISED IN 2005;

    TAMIL NADU IS THE FIRST STATE IN INDIAWHICH HAS ENACTED A PROCUREMENT LAW; ITIS NAMED THE TAMIL NADU TRANSPARENCY INTENDERS ACT, 1998 AND RULES 2000;

    KARNATAKA IS THE SECOND STATE IN INDIAWHICH HAS ENACTED A PROCUREMENT LAW; IT

    IS NAMED THE KARNATAKA TRANSPARENCY INPUBLIC PROCURMEENT ACT 1999 AND RULES2000; KARNATKA HAS ALSO MANDATEDSTANDARD TENDER DOCUMENTS;

  • 8/9/2019 Introduction Contracts Management

    36/38

    36

    PROCUREMENT LAW (CONTD)

    OTHER STATES SUCH AS ANDHRA

    PRADESH, ORISSA, PUNJAB ARE

    PROPOSING TO ENACT SIMILARPROCUREMENT LAWS;

  • 8/9/2019 Introduction Contracts Management

    37/38

    37

    OTHER LEGISLATIONS THAT AFFECT

    CONTRACTS

    THE INDIAN CONTRACT ACT, 1872;

    WORKMEN COMPENSATION ACT,1923;

    THE INDUSTRIAL DISPUTES ACT,1947;

    EPF AND MISCELLANEOUS PROVISIONS ACT,1932;

    THE INDIAN PARTNERSHIP ACT, 1923;

    THE SALE OF GOODS ACT,1930;

    PAYMENT OF WAGES ACT, 1936;

    MINIMUM WAGES ACT,1936; EMPLOYEESS STATE INSURANCE ACT, 1948;

    FACTORIES ACT, 1948;

  • 8/9/2019 Introduction Contracts Management

    38/38

    38

    OTHER LEGISLATIONS THAT AFFECT

    CONTRACTS (CONTD)

    KARNATAKA SALES ACT, 1957;

    CONTRACT LABOUR (REGULATION ANDABOLITION) ACT, 1976;

    MATERNITY BENEEFIT ACT, 1961; CHILD LABOUR (PROHIBITION AND REGULATION

    ACT, 1986;

    PAYMENT OF GRATUITY ACT,1972;

    THE PUBLIC LIABILITY INSURANCE ACT, 1991;

    ENVIRONMENTAL (PROTECTION) ACT, 1986; THE ARBITRATION AND CONCILLIATION ACT,

    1996; ETC.