innovation through design
gas processing | water treatment | solids management | carbon capture | field services | spares
INTRODUCTION TO PROCESS GROUP
Who we are & how we work
Resources & facilities
Technology solutions
Clients
Major projects
Fabrication partners (e.g. South Korea)
Process Group | Overview
~130 employees | US$75M revenue
United Arab EmiratesAbu Dhabi, 2005
Singapore2007
AustraliaMelbourne: Head Office, 1978
Overview | Who we are
Overview | Who we are
Established 1978, Melbourne Head office (Design / Project Mgt. / Fab.)
Abu Dhabi est. 2005 (Design / Project Management / Fabrication)
Singapore est. 2008 (Design / Project Management / External Fab)
130 employees globally, revenue US$75mill
ISO 9001, OHSAS 18001, U-stamp (Abu Dhabi)
Overview | Resources & Facilities (Australia)
Melbourne Head Office1,200 sqm
Workshop 4 Hobbs Crt1,250 sqm
Workshop 5 Hobbs Crt2,250 sqm
Office1,000 sqm
Outside storage and construction~20,000 sqm
Factory2 x 2,100 sqm
Overview | Resources & Facilities (Abu Dhabi)
Overview | Resources & Facilities (Singapore)
298 Tiong Bahru Road,
Central Plaza,
Singapore, 168730
Capabilities
Office Size ~2000 FT 2
Project Management / Execution
Sales
Drafting
Document Control
QA
Singapore Team:
1 General Manager
1 Sales Manager
1 Eng Manager
6 Project Engineers
2 Drafting
1 Document Control
Overview | Resources & Facilities (Fabrication)
Abu Dhabi
Singapore
Melbourne
ShenZhen
Ulsan
Batam Island
Lahore
Gas Sweetening (Amine / Membrane)
Gas Dehydration (TEG / Molecular Sieve / Membrane)
Glycol Regeneration (MEG / DEG / TEG)
Dew Point Control (Refrigeration / JT / Silica Gel)
Fuel & Seal Gas Conditioning
Produced Water Treatment (Deoiler Hydrocyclones, IGF, NSF, CPI)
Sand Handling Systems (Wellhead & Process Desander Cyclones, Sand Flushing)
Mercury and H2S Removal
Mini LPG Plants
Condensate Stabilization
Desalters / Dehydrators
Heater Treaters
Overview | Technology Solutions
Deoiler Cyclones
Ocean / onshore
Discharge
DesanderCyclones
Nut Shell FiltrationGas Flotation
WATER TREATMENT
SOLIDS TREATMENT
Discharge
GasOil
Water
Reinjection underground
PRIMARY SEPARATION
Gas Sweetening
Mercury & H2S removal
Compression
Gas Dehydration
& DPCU
GasOilWaterSolids
GAS PROCESSING
Pipeline
OIL TREATMENT
Pipeline
Fuel Gas Conditioning
Well Head Desander
Crude Oil Dehydrator
Crude Oil Desalter
Overview | Clients
Major Project | Gas Dehydration (TEG)
Client
Project Platong Gas II Development
Location Thailand
Delivery 2011
Plant details
Gas flowrate: 2 x 250 MMSCFD
Lean TEG Circulation Rate: 80 USGPM
Lean TEG Concentration: 99.8 wt%
Outlet Water Content: 2.5 lb/MMSCF
Major Project | Gas Dehydration (TEG)
Client
Project GLNG Upstream Project
Location Queensland
Delivery 2012 to 2013
Plant details
Gas flowrate: 60 MMSCFD
Seven (7) Gas Dehydration Packages
Long term Service Agreement
Major Project | Gas Dehydration (TEG)
Client
Project PNG LNG Associated Gas
Location Papa New Guinea
Delivery 2011
Plant details
Gas flowrate: 3 x 100 MMSCFD
Lean TEG Circulation Rate: 46 USGPM
Lean TEG Concentration: 99.89 wt%
Outlet Water Content: 5 lb/MMSCF
Major Project | Amine Package
Client
Project Zamzama Phase II Project
Location Pakistan
Delivery 2007
Plant details
Gas flowrate: 161 MMSCFD
Amine Circulation Rate: 720 USGPM
Inlet CO2 Content: 3.49% v/v
Outlet CO2 Content: 0.01% v/v
Major Project | Solids Handling & PWTP
Client : PDO
Project : Musallim Phase I & II
Location : Oman
Delivery 2007 to 2008
Plant detailsWater Throughput : 3 x 20,000 m3/day
Oil & solids discharge limit : < 40 ppm
Oil & solids actual discharge : < 15 ppm
External Fabricator Partner (South Korea)
FactoryArea(m2)
Capacity / Year
Main Production RemarksTotal Shop
Factory #1 59,500 26,500 20,000 ton
• Pressure Vessel• Column & Reactor• Converter, Steam Drum• Refinery & Petrochemical Plant Equipment• Nuclear Power Equipment, BOPs
FactoryArea(m2)
Capacity / Year
Main Production RemarksTotal Shop
Factory #2 171,500 15,500 70,000 ton
• Semi-Rig & Offshore Floater Mega Block• Offshore Structure• Module Construction
• Jetty• Paint Shop• Moving Shel-ters
External Fabricator Partner (South Korea)
Column & Tower- Project Name: Yansab Olefins Project- Site: Saudi Arabia- Client : SABIC- Weight/Q’ty: 2,450ton/ 3 set- Size: 51t x 7,100(w) x 88,300(L) + 4,900- Material/ Weight: A537-2+S5/ 1,380ton- Delivery: March, 2007
Topside Module- Project Name: Pazflor FPSO- Site: Nigeria- Client: DSME/ TOTAL- Weight/Q’ty: 3,400ton/ 4 units- Size: 29.7m(w) x 28.6m(L) x 19.2m(H)- Delivery: March, 2010
Module- Project Name: Kearl Initial Development Project - Site: Canada- Client: AMEC/ ExxonMobil- Weight/Q’ty: 20,000ton/ 187 units- Size: 7.3m(w) x 7.8m(H) x 36.0m(L)- Delivery: August, 2011
Load-out Capacity
External Fabricator Partner (South Korea)