Introducing C-PEM

9
Copyright FocusROI 2014 Introducing C-PEM STUART HARTLEY FCA CA.IT [email protected]

description

Introducing C-PEM . Stuart Hartley FCA CA.IT [email protected]. Volume 1 Core concepts Audits, reviews and compilations Volume 2 Practical Guidance Includes 2 integrated case studies Part A Audits Part B Reviews Part CCompilations - PowerPoint PPT Presentation

Transcript of Introducing C-PEM

Page 1: Introducing C-PEM

Copyright FocusROI 2014

IntroducingC-PEM

STUART HARTLEY FCA [email protected]

Page 2: Introducing C-PEM

Volume 1 Core concepts ◦ Audits, reviews and compilations

Volume 2 Practical Guidance Includes 2 integrated case studies ◦ Part A Audits◦ Part B Reviews◦ Part C Compilations◦ Part D Practice Aids

(forms etc. on a CD)

Page 3: Introducing C-PEM

Three Audit Phases

Plan the audit

Performrisk assessment

procedures

Evaluate the audit evidence obtained

Prepare theauditor’s reportRi

sk A

sses

smen

t

Risk

Res

pons

e

Repo

rtin

g

Implem ent responses

to assessed RMM

1. 2. 3

Page 4: Introducing C-PEM

14 AuditSteps

Risk Assessment

1. Perform preliminary activities

2. Determine materiality

4-6. Perform s:RAP

Entity-Specific

Transactional

Pervasive

7. Conclude: Assessed risks

at F/S level

Assessed risks atassertion level

What are the in the F/S ?RMM1 2

Risks

Risks

Risks

Controls

Controls

Controls

3. Plan sRAP

10. Perform planned responses

11. Evaluate evidence obtained

Risk Response

8. Design appropriate audit responses:

9. Finalize audit plans

Did material misstatements occur?

Reporting

12. Communicate (findings, misstatements and significant control deficiencies)

13. Complete the audit file (file and F/ S reviews, final An Rev, subsequent events and approvals)

14. Form an opinion (appropriately word and date auditor’s report)

Evaluating/communicating findings, and forming an opinion

 

Assessed risksat F/S level2

Assessed risks atassertion level

Overall responses

Further audit procedures Communicate audit plan to

management/ TCWG

Page 5: Introducing C-PEM

The C•PEM Case Studies

Case Study A?Cambridge Furniture Inc.

Case Study B? Kennedy & Co.

Completed Documentation Provided

Standard C•PEMForms

Structured Memos and CondensedC•PEM forms

C•PEM Volume 2

Business Furniture Production Furniture Parts

Sales $1.5 million $ 230,000

Staff 8 2 + owner

Page 6: Introducing C-PEM

Design of C•PEM Forms

FAQ Responses

Purpose? Structure for documenting work performed.Assistance in complying with CAS requirements

Training required? Yes Forms are not a substitute for reading CASs

Ease of use? Forms have objectives, instructions and consider points to facilitate ease of use

Why data bases instead of checklists?

Enables quick and consistent assessments of risk

Enables re-use of forms (cost saving) by updating the data in subsequent years

How easy to review? The databases (such as risk registers) are structured to facilitate file review

What are C•PEM “worksheets ”?

Use ONLY when applicable

Page 7: Introducing C-PEM

C-PEM Audit Documentation

Standard C•PEM Forms

Condensed C•PEM Forms

StructuredMemos to File

ObjectivesInstructionsCAS requirementsConsider pointsComprehensive

Objectives

SummarizedCAS requirements

Custom

Page 8: Introducing C-PEM

FocusROI Services In house and web based Training

Quality Control Monitoring

Small group Coaching www.focusroi.com

416 594 0005

[email protected]

Page 9: Introducing C-PEM

Please contact us for further [email protected] 594 0005