Intro slide Transforming the Care we deliver Hambleton, Richmondshire and Whitby CCG Dr George Campbell, Deputy Chair, HRW CCG Sarah Ferguson, Senior Delivery Manager, HRW CCG @HRW_CCG 13 th June 2014

description

Intro slide. Transforming the Care we deliver Hambleton, Richmondshire and Whitby CCG Dr George Campbell, Deputy Chair, HRW CCG Sarah Ferguson, Senior Delivery Manager, HRW CCG. @HRW_CCG. 13 th June 2014. Public Engagement. Phase 1 - Vision for Whitby & Surrounding Areas. - PowerPoint PPT Presentation

Transcript of Intro slide

Page 1: Intro slide

Intro slideTransforming the Care we deliver

Hambleton, Richmondshire and Whitby CCGDr George Campbell, Deputy Chair, HRW CCGSarah Ferguson, Senior Delivery Manager, HRW CCG

@HRW_CCG

13th June 2014

Page 2: Intro slide

Public Engagement

Page 3: Intro slide

Phase 1 - Vision for Whitby & Surrounding Areas

Retendering of Community Services and Out of Hours GP Services•Includes community nursing, specialist nursing, inpatient services, OT and Rehabilitation Services, Minor Injuries Unit, outpatient services and OOH GP services•Contract value is £6-8 million annually•Integrate three separate contracts•5 year contract (£40 million)•Trigger an asset transfer of the hospital to NHS Property Services•Bidders event on the 3rd July 2014•Likely route will be competitive dialogue procurement

Page 4: Intro slide

Major Improvements• Develop a frailty assessment service for patients complex comorbidities, dementia

and frailty• Good rehabilitation and reablement after acute illness or injury and changes to the

Day Rehabilitation Service• Better clinical input into the inpatient beds and improvements to rehabilitation on

wards and in the community to support earlier discharge and provide post-discharge support

• Access to 24/7 Out of Hours GPs based at Whitby Hospital• Maintain local Minor Injuries Unit and integration with OOH• Creation of Single Point of Access and 24/7 Community Nursing• Choice, control and support towards the end of life• Improved access to own care records for them and their health professionals• Investing in third sector: sitting/befriending services, community agents and care

navigators• Additional innovation through collaborative working

Page 5: Intro slide

The Brief for Community Ventures

• Identify options for redevelopment of site, with partners and with NHS

• Review existing/alternative uses for the land.

• Identify potential revenue and capital opportunities to improve VFM

• Prepare a formal set of recommendations for the stakeholders to consider and for CCG governing body/council of members to approve.

Why?

•75% of the current facility is not occupied

•Privacy and dignity issues

•No dedicated treatment rooms for integration of Out of Hours and Minor Injury services (off site)

•Building is beyond its life and not fit for purpose

•The current site layout does not allow for joint working

Phase 2 - Redeveloping Whitby Hospital

Page 6: Intro slide

Future Service Profile 

Proposed Schedule of Accommodation

 

  Net GIA

Inpatient Ward 1031 1482.063

Health and Wellbeing Hub 215.5 309.781

Ambulatory Care Centre 1092.5 1570.469

     

Total 2339 3362.313

     

Note: Shared entrance reception/waiting areas not calculated (Additional area to be saved)

Page 7: Intro slide

Assessment of Long List Options

Option Reason Taken Forward

Est. Capital Cost

1 Do nothing N/A Yes N/A

2a and b Remodel buildings on current site

N/A Yes £6.3m

3 New build on current hospital site

The cost (value for money), planning constraints and deliverability do not stack up when there are suitable buildings already available on the site which can be utilised.

No £9.1m

4 Remodel and refurbish an existing building elsewhere in Whitby that is suitable for conversion

Following a detailed property search no suitable buildings of the size required and suitability for conversion have been identified at this time.

No N/A

5 New build on alternate site in Whitby

Following discussions with Local Authority planners and a detailed land search no suitable sites of the size and nature required are currently or expected to become available in Whitby at this time.

No £9.1m

Capital Costs are for construction exclude VAT and fees, options 3 and 4 also exclude demolition and remediation and the cost of purchase for a new site

Page 8: Intro slide

Short Listed Options (Option 2a)

Re-model & refurbish health element using the block at the front of the site

Page 9: Intro slide

Short Listed Option (Option 2b)Re-model & refurbish health element using the 4th floor block on the rear of the current site

Page 10: Intro slide

Development of SiteCommercial Site Development

Page 11: Intro slide

Development of Site (Preferred Option)Hospital integrated with NYCC Services

Page 12: Intro slide

Financial Appraisal(Option 2)

• Capital Investment - £6.352m

• Revenue - £0.9m (circa £800k)

• Capital Receipt - £0.6m - £2.445m

Page 13: Intro slide

Conclusions• Local Planning Officers confirms support for a continuing health presence on the site, as well as

support for the principle of a mixed use of Extra Care development and general housing for sale.

• There are feasible options to create a remodelled community hospital on the existing site.

• Overwhelming message from the engagement period is that people place very significant value on local services and would like to see the new hospital developed on the existing site.

• Remodelling and refurbishing buildings on the existing site offers the best value for money option going forward to deliver CCG commissioning intentions and the opportunity for integrated services within a timescale and programme that the CCG/NHS can dictate and influence.

• Progressing the Preferred Option would generate revenue saving to the NHS and would require less capital investment than alternative options.

• The preferred option offers an immediate solution to LA partners for their strategic service plans assuming appropriate project and commercial arrangements can be agreed.

Page 14: Intro slide

Recommendations Governing Body to approve draft Community Ventures report and agree engagement plan.

Set up a joint commissioning/development project board with NYCC under an Memorandum

of Understanding (MOU) with agreed principles and timescales.

Identify the capability and capacity to undertake the project ensuring appropriate resources

and skills are available to deliver the next stages.

The principal task of the joint project board will be to develop an interagency plan/business

case for the site that realises the vision for a health social care and wellbeing campus.

Alternatively should the partnership be unable to agree a joined up development plan the

NHS should continue to pursue a stand-alone remodelled community hospital maximising

the opportunities from the surplus land.

Page 15: Intro slide

Fit 4 the Future – Hambleton & RichmondshireSignificant project looking at providing more appropriate care for an aging population, needed because:

•Ageing population – 30% increase in over 65s by 2021.•Patients spend too long in acute hospitals.•Community services need to be developed so people can be cared for in their own homes.•Health and social care services need to be more integrated.

Six key areas in the Vision.

Page 16: Intro slide

Fit 4 the Future – Hambleton & Richmondshire• Currently in the middle of an engagement campaign.

• Good buy-in from health and social care partners.

• Conversations with members of the public so far have been generally supportive of the Vision. Some good extra ideas and thoughts.

• Will be going out to existing groups over the summer months to further continue the conversation.

• Report published in the autumn.

Page 17: Intro slide

Challenge Fund Update

Annie MacLeodRelationship Manager Y&H CSU