INTO THE FUTURE - commercialnoida.com · Noida-Greater Noida Expressway, Yamuna...

21
INTO THE FUTURE

Transcript of INTO THE FUTURE - commercialnoida.com · Noida-Greater Noida Expressway, Yamuna...

INTO

THE

FUTURE

LEAPTO TH E NEXTLEVEL

LEAP IN TO THE FUTURE

LOCATED

AT A PLACE

THAT IS

SETTING THE

STANDARD FOR

EVERYWHERE

ELSE

3rd largest

economycontributing 8.5% to the India’sGDP

4th Largest

ITESdestinationin the country,in total adds to

about 10%of exports (Nasscom)

Largest planned

Industrial township of Asiahub of India's growth as economic superpower

2.80%(supply)Commercial Development

Multipletimes moreDemand

AS PER

MASTER PLAN

NOIDA AUTHORITY

2031

A Paradigm for

Economic growth

8.5% of Delhi Mumbai Industrial Corridor

catchment area and 57% of Amritsar Kolkata

Industrial Corridor in Uttar Pradesh

Intersection of Western Dedicated Freight

Corridor and Eastern Dedicated Freight

Corridor at Greater Noida

Multi-Modal logistic hubs, industrial parks etc.

to benefit from reduced travel time to ports

Noida-Greater Noida Expressway, Yamuna

Expressway, FNG Corridor, Metro Connectivity

(Stone's throw away from the Metro Station at

Sector 137&141, ISBT &CBT)

TECH

CAPITAL

OF NORTH

INDIA

NO

IDA

ALPHATHUMFROM THE MAKERS OF

50 STORIESOF THEFUTURE

A SMART BUILDING WITH ARTIFICIAL

INTELLIGENCETHATCUSTOMISESYOUR

EXPERIENCE TOYOU

NORTHINDIA’S TALLEST

COMMERCIALTOWER

AN ICON IN

ETERNITYTallest CommercialTower

in NCRRegion

- Leed platinum certifiedbuilding

- Constructed with the dry wall systemtechnique

- Breathable double skinstrategy

- Double glazed unitized façadesystem

- A helipad and ample parkingfacilities

OFFICES

LIFE- THE WAY IT

OUGHT TO BE

- 50 level iconic towers

- New standard for sustainableskyscrapers

- The office towers are designed as a verticalcampus

- Distinct zones for distinct workmodes

- Stimulating intelligent interactions through

two storey neighbourhoods

- Unobstructed views

PART OF A

26.8 ACRES MIXED USE

DEVELOPMENT

Sector 140-A,Noida

AIRPORT

CYBERTHUMNOIDA

INTERNATIONAL AIRPORT

FNG (1MIN)

KALINDI KUNJ

(10MIN)

YAMUNA SECTOR 18 DND SARAI KALE EX WAY(17MIN) (20 MIN) KHAN ISBT (15MIN) 25MIN

PRAGATIMAIDAN30 MIN

NDLS 40MIN

INFOSYSCAMPUS (2MIN)

MAYUR AKSHARDHAM VIHAR 29MIN27MIN

PRAGATIMAIDAN37MIN

RAJIV IGIAIRPORT CHOWK 52MIN43MIN

IGIAIRPORT (55MIN)

CYBERTHUM

CYBERTHUM

CYBERTHUM

DRIVE

METRO

WALKING

SECTOR 137BOTANICAL(1MIN) GARDEN

(10MIN)

KPMG (2MIN)

SAMSUNG (2MIN)

CBT (1MIN)

ONE OF

NORTH

INDIA’S

LARGEST

MUSICAL

FOUNTAIN

RETAIL-Mall in the sky

-At Cyberthum, shopping will

elevate itself to meet theemotional

needs of the consumer

- Going to the mall will be a

technology enabled experience

- Everything, from payment platforms to

delivery mechanisms will be techenabled

OFFERING STATE-OF-THE

ART INFRASTRUCTURE

WORLD-CLASS ROADS UTILITYTUNNELA tunnel running through the city

for routing all utility services.

Gives easy access to pipes thus

avoiding digging.

WATER MANAGEMENTZero discharge with storage and

utilization of surface run-off and

rain water. Drinkable water from tap.

AUTOMATED WASTE

COLLECTIONSYSTEMAnext generation

technology.

FIRE STATION

AND EMERGENCY

RESPONSE CENTREWith provision for special facilities.

MULTI-CAR PARKING2 multi-level parking planned, with

10,000 car park capacity each.

DISTRICT

COOLINGSYSTEMBuildings are cooled with

chilled water reducing energy cost.

POWERENSURING

99.999% POWER

RELIABILITY.

4,18,376.877sqmtTotal Built-upArea

with Basement

213.7MTRSTower Height

(Tallest CommercialTower

in NCRRegion)

BuildingHeights

Groud + 50FloorTower A& B

4.5M EachOffice Floor to Floor Internal Height

6.9M EachCommercial Floor to Floor Internal Height atGround

ParkingDetail

421Open parking

4950Covered Parking in Basements

5371Total Parking

At the time of Booking

On completion of Raft

On completion of Ground Floor Roof Slab

On commencement of casting of 10th floor

On commencement of casting of 20th floor

On commencement of casting of 30th floor

On commencement of casting of 40th floor

On Completion of Super Structure

On Offer of Possession

30% ofBSP

20% ofBSP

10% of BSP

10% of BSP

10% of BSP

10% of BSP

5% of BSP

5% of BSP

All OtherCharges

Construction Linked Plan with 12%return

Stage Payable

STAGE

Booking Amount

Within 30 days of Booking

On Offer of Possession

12% PER ANNUM

Rs. 2,00,000/-

95% of BSP- less Booking Amount

5%of BSP +All Other Charges

11%PER ANNUM

Rs. 2,00,000/-

75%of BSP- less Booking Amount

25%of BSP +All Other Charges

STAGE

At the time of Booking

On Completion of Raft

On Completion of Super Structure

On Offer of Possession

PAYABLE

25% of BSP

25% of BSP

25% of BSP

25%of BSP +All Other Charges

Return Plan

50:25:25PAYMENT WITH 10% RETURN

Residential Sectors

Supertech ecocity

Purvanchal Royalpark

Paras Tiera

1LAKHINDIVIDUALSCorporate

Indiamart, Infosys

ResidentialSectors

143 A &B

1.5LAKHINDIVIDUALSCorporate

Genpact, Sapient, India Tv,KPMG

ResidentialSectors

Omaxe, Silver City

93 A& B

3.5LAKHINDIVIDUALSCorporate

Accenture, TCS,Oracle

ResidentialSectors

ATS village, Eldeco, Parsvnath

93, 134, 133,135

10LAKHINDIVIDUALSCorporate

Global Logic, Dell, Supertech

1KM

2KM

3KM

4KM

ResidentialSectors

Jaypee WishTown

129, 108, 105, 104, 107,128

10LAKHINDIVIDUALSCorporate

Adobe, HCL, Capegemini, Tech Mahindra

Motherson, Noida SEZ,Metlife

5KM

WHERE

TOMORROW

LIVES

Sector 140-A,Noida

LE A P INT O THE F UTUR E

SITE P L A N

OUR PARTNERS

IN PROGRESS

PARMESH CORPORATE TOWER

DELIVERED

PROJECTS

THANK YOU

“Disclaimer:The contents and information contained in this presentation are intended for general marketing purposes only and should not be relied upon by any person as being complete or accurate. Max Digi Infotech Pvt. Ltd. (Developer), its employees, agents and other representatives will not accept any liability suffered or incurred by any person arising out of or in connection with any reliance on the content of or intimation contained in this presentation. This limitation applies to all loss or damage or any kind, including but not limited to, compensatory, direct, indirect or consequential damage, loss or income or profit, loss of or damage to property and claims by third party”. RERA No. Bhutani Group # UPRERAPRM11044, CYBERTHUM PHASE B :UPRERAPRJ240015 ,CYBERTHUM PHASE E :UPRERAPRJ190938 ,CYBERTHUM PHASE H : UPRERAPRJ674006 ,CYBERTHUM PHASE A : UPRERAPRJ236478