Internship PresentationBy: Nadeem Qandeel E&C Intern EE Major-SCSU Graduating in 12/2015
Responsible By Nature
OutlineOverview of internshipProject
BackgroundProblem statementProduct specsTasks ChallengesProject management
Conclusion
The Internship Xcel Energy SHERCO
plant Engineering
& Construction
Fire Pump Controller Project
Sprinkler system
Controller is the brain
Starts the engine
Engine pumps water
Background
Controller replacement
Manufacturer is out of business
Old Controller Not up to date
with latest NFPA standards
Positive ground connection
Fire Pump Controller Project Problem Statement
Product Specs Fire Pump Controller Project
Monitors systems and auto start Regulates 2 batteries for engine 2 battery chargers Test timer for weekly test Heater/Humidistat NEMA 12 enclosure
Visual and audible alarms for: Engine failed to start Engine over speed Engine cooling water high temp Engine low lube oil pressure AC or battery charger failure
Read manuals Search for vendors Team discussion Review proposals Scope of work document Select controller options Maximo Review drawings
TasksFire Pump Controller Project
Negative ground connection Coordination Establishing terms and conditions Safety
Fire Pump Controller Project Challenges
Fire Pump Controller Project
Requirements gathering
Analysis
Alignment with other departments
Design comparisons
Vendor selection & Customization
Establishing terms and conditions
Documentation
Drawings revision (Demo)
Installation
Testing
21-May 10-Jun 30-Jun 20-Jul 9-Aug 29-Aug 18-Sep 8-Oct
Start Date 25-May 15-Jun 25-May 22-Jun 26-Jun 1-Jul 25-May 20-Jun 4-Sep 8-SepTasks Duration 21 7 115 4 4 27 115 25 4 2
Project management
Budget: $ 100,000
Project is in progress Future work
Engine conversion Installation of controller
Conclusion
Intern Experience Accountability Operational Excellence Relationship Focused
Questions?