Chapter 15: Flat Primary canal (FPC1) Lengths: 344

Transcript of Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 - FPC1 Lengths (Refer...

Page 1: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Chapter 15:

Flat Primary canal (FPC1) Lengths:

344

Page 2: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Chapter 15: Flat Primary canal (FPC1) Lengths:This is the length of the inter linking path of the flat

primary canal 1, where only the major curves are looked in, while graphing the path on the surface of the earth. The length of the FPC may change with micro survey over the satellite pictures, which will be done by the different teams designated to survey a particular segment of the interlinking path / between two adjacent rivers as they are going to consider the minor curves that comes in the interlinking path.

345

Page 3: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:Each segment of the canal (FPC) receives the water from the proximal and distal segments of the same FPC, and the area of land which is above its level. 346

Page 4: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:The water of the river Ganga and Yamuna will be continuously feeding the FPC1 from the end opening of the YUT. 347

Page 5: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:Each segment of canal (FPC) distributes / irrigates / supplies water to the proximal and the distal segments of the same FPC, and the area of land which is below its level. 348

Page 6: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:SN. Description. Length in kms. 1. FPC1 Start 500 to Gambhir 500. Receives from; North eastern Rajasthan – north eastern slope of Aravalli range of hills. Supplies to; North eastern part of Rajasthan, South Haryana, Delhi, south UP till the Yamuna course. 77.40 349

Page 7: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:There is a depressed area between FPC1 beginning to GambhirD1, which is 431 mts AMSL, we may have to construct BD or U tube to by pass this geographical variation. 350

Page 8: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

There is another depressed area between FPC1 beginning to Gambhir D2, which is 444 mts AMSL, we may have to construct BD or U tube to by pass this geographical variation.

351

Page 9: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:Gambhir 500 to Dhund 500.Receives from; North eastern Rajasthan (Govidagarh and Chomu area) – north eastern slope of Aravalli range of hills. Supplies to; North eastern part of Rajasthan, South Haryana, Delhi, south UP till the Yamuna course. 50.12

352

Page 10: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:Dhund 500 to Bandi 500.Receives from; Eastern Rajasthan (Bilonchi area), eastern slope of Aravallirnage of hills.Supplies to; Eastern rajasthan till Chambal river, south western UP till Yamuna river. 34.14 353

Page 11: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

Bandi 500 to Mashi 500. Receives from; By the previous and next segment area. It may become closed canal system. 103.49. Lowest point between Bandi500 – Mashi500 path is 362mts AMSL. (260047’29.92”N) (750018’57.36”E). We have to do BD or U tube to by pass this depression. 354

Page 12: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:Mashi 500 to Khairi 500. Receives from; By the previous and next segment area. It may become closed canal system. 118.48. The depressed points between Mashi500 – Khairi500 path are 316mts [(240020’9.50”N) (74000’18.87”E)] and 390mts [(240012’9.54”N) (740040’26.28”E)] AMSL. We have to do BD or U tube to by pass this depression. 355

Page 13: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

Khairi 500 to Berach 500. Receives from; Eastern slope of Aravalli range of hills. Supplies to; Eastern rajastan. 110.24 356

Page 14: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:7.Berach 500 to Sou 500. Receives from; Eastern slope of Aravalli range of hills. Eastern Rajasthan. Supplies to; Eastern Rajasthan. 178.07 357

Page 15: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:8.Sou 500 to Chambal 500. Receives from; North slope of Vindya range of hills, south Rajasthan and west MP. Supplies to; West MP, east Rajastan. 163.94 358

Page 16: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:9.Chambal 500 to Ghambhir 500. Receives from; North slope of Vindya range of hills, Central MP. Supplies to; North west MP, east Rajasthan. 29.23 359

Page 17: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

10.Ghambhir 500 to Sipra 500.

48.70 360

Page 18: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:11.Sipra 500 to Kalisindh 500. 33.77There is an elevated area between Sipra – Kalisindh path and the maximum level we get in this path is 530 mts AMSL at (23002’33.56”N) (76001’35.45”E). DCC is required.

361

Page 19: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

12.Kalisindh500 to Newaj500.

19.03 362

Page 20: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

13.Newaj 500 to Ahu 500.

65.21 363

Page 21: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

14.Ahu 500 to Parwan 500.

26.15 364

Page 22: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

15.Parwan 500 to Parbathi 500

36.78 365

Page 23: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

16.Parbathi 500 to T. To T. Betwa500.

78.28 366

Page 24: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:17.T. To T. Betwa500 to Betwa500. 13.11. Lowest point between T. To T. Betwa to Betwa path is 362mts AMSL (230018’46.15”N) (770026’1.31”E). We have to do BD or U tube to by pass this depression. 367

Page 25: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

18.Betwa 500 to Bina 500.

134.91 368

Page 26: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:19.Bina 500 to Dhasan 500. 32.58. There is an elevated area between Bina 500 to Dhasan 500 path and the maximum level we get in this path is 542 mts AMSL at (230043’37.85”N) (780025’51.80”E). DCC is required.

369

Page 27: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

20.Dhasan 500 to Bewas 500.

70.84 370

Page 28: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

21.Bewas 500 to Sonar 500.

43.57 371

Page 29: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:22.Sonar 500 to Bearma 500. 71.04. The depressed point between Sonar 500 to Bearma 500 path are 465mts [(230027’54.15”N) (780056’57.23”E)], 470mts [(23020’14.13”N) (78054’3.72”)] and 430mts [(230018’16.37”N) (79004’10.32”E)] AMSL. We have to do BD or U tube to by pass this depression. 372

Page 30: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:23.Bearma 500 to Heran 500. 106.47. The depressed points between Bearma 500 to Heran 500 path are 405mts [(230014’44.06”N) (790019’33.43”E)] and 374mts [(230019’15.98”N) (790047’34.38”E)] AMSL. We have to do BD or U tube to by pass this depression.

373

Page 31: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:24.Heran 500 to Narmada 500. This length will decrease with FPC1 Narmada RE.141.96 374

Page 32: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

25.Narmada 500 to Burhner 500.

79.22 375

Page 33: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

26.Burhner 500 to Banjar 500.

86.54 376

Page 34: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:27.Banjar 500 to Weinganga 500. 129.62. There is an elevated area between Banjar 500 to Weinganga 500 path and the maximum level we get in this path is 540 mts AMSL at (220030’23.54”N) (790052’16.17”E). DCC is required.

377

Page 35: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

28.Weinganga 500 to Panch 500.

125.00 378

Page 36: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

29.Panch 500 to Kanhan 500.

119.15 379

Page 37: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

30.Kanhan 500 to Wardha 500.

54.5 380

Page 38: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:31.Wardha 500 to Penganga 500. 294.82. The depressed points between Wardha 500 to Penganga 500 path are 345mts [(210010’47.71”N) (770049’39.90”E)] and 282mts [(200039’20.88”N) (770050’10.06”E)] AMSL. We have to do BD or U tube to by pass this depression.

381

Page 39: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

32.Penganga500 to Purna 500.

127.61 382

Page 40: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

33.Purna 500 to Dudna 500.

124.78 383

Page 41: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

34.Dudna 500 to Godhavari 500.

228.79 384

Page 42: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

35.Godhavari 500 to Manjra 500.

588.77 385

Page 43: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:36.Manjra 500 to Kagna 500. 51.70. There is an elevated area between Manjra 500 to Kagna 500 path and the maximum level we get in this path is 683 mts AMSL at (170025’26.60”N) (770051’43.40”E). DCC is required.

386

Page 44: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

37.Kagna500 to Benithora 500.

165.59 387

Page 45: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

38.Benithora 500 to Sina 500.

266.81 388

Page 46: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

39.Sina 500 to Bhima 500.

179.40 389

Page 47: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

40.Bhima500 to Man 500.

195.54 390

Page 48: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

41.Man 500 to Don 500.

330.54 391

Page 49: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

42.Don 500 to Krishana 495.

79.18 392

Page 50: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

43.Krishna495 to Malaprabha 500.

32.62 393

Page 51: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

44.Malaprabha 500 to T. To. T. Tungabhadra500.

292.00 394

Page 52: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

45.T. To. T. Tungabhadra 500 to Tungabhadra 500.

38.69 395

Page 53: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

46.Tungabhadra 500 to Chikkahagari 500.

200.91 396

Page 54: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

47.Chikkahagari 500 to Hagari 495.

52.21 397

Page 55: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

48.Hagari 495 to Pennar 500.

66.87 398

Page 56: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:49.Pennar 500 to Papagni 500.This length will decrease with FPC1 Pennar –Papagni DCC.352.27 399

Page 57: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

50.Papagni 500 to Cheyyar 500.

126.00 400

Page 58: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

51.Cheyyar 500 to Palar 500.

252.00 401

Page 59: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

52.Palar 500 to Ponniyar 500.

66.73 402

Page 60: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:53.Ponniyar 500 to Kaveri 500This length will decrease with FPC1 Ponniyar 500 to Kaveri 500 DCC1, CE1, CE2, CE3 & CE4.275.00 403

Page 61: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:54.Kaveri 500 to Moyar 500.This length will decrease with FPC1 (Kaveri RE), & (Kaveri – Moyar CE1, CE2, & CE3).542.85 404

Page 62: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:55.Moyar 500 to Bhavani 500.This length will decrease with FPC1 Moyar RE.113.70 405

Page 63: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:56.Bhavani 500 to Noyil 500.This length will decrease with FPC1 Bhavani RE.125.63 406

Page 64: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:57.Noyil 500 to Amaravathi 500. 119.00. The depressed points between Noyil 500 to Amaravathi 500 path are 378mts [(100055’47.99”N) (760058’48.48”E)], 410mts [(10053’57.22”N) (7708’22.16”)] and 342mts [(100045’16.87”N) (77007’47.64”E)] AMSL. We have to do BD or U tube to by pass this depression. 407

Page 65: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

58.Amaravathi 500 to Nanganji 500.

79.09 408

Page 66: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

59.Nanganji 500 to Surya/vaigai 500.

314.06 409

Page 67: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

60.Surya/Vaigai500 to Arjuna 500.

29.24 410

Page 68: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

61.Arjuna 500 to Vaippur 500.

91.81 411

Page 69: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:62.Vaippur 500 to Chittar (FPC1 End)500. 159.47. Lowest point between Vaippur 500 to Chittar (FPC1 End)500 path is 372mts AMSL. (80059’33.63”N) (77009’57.08”E). We have to do BD or U tube to by pass this depression.

412

Page 70: Interlinking rivers 6 - Interlinking Indian Rivers - Short Presentation 5 -  FPC1 Lengths (Refer Chapter 15.6)

Topic series: 445. Topic 1: FPC1 Lengths and approximate capacity:

One cubic meters = 36.92 cubic feet.

Total FPC1 CRL Length in Kms is 8345.22

Total canal length we are going to save with CE, RE,

DCC, BD in Kms.

703.13

Total length of the CE, RE, DCC, BD put together in Kms 33.29

The Length (Actual) of the probable FPC1 in Kms. 7675.38

The capacity (Volume) of storable water (with the canal

width of 200 mts, depth of 25 mts, but the maximum

level maintained will be 20 mts) in the FPC1 (30701.52

million cubic meters) in TMC. (This volume can be filled

and discharged any number of times.)

1133.5