INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light...

6
DWG. No.: SCALE: AS SHOWN 0 10/19/16 100% CONSTRUCTION DOCUMENTS OCB JAV REV: DATE: ISSUED FOR: DRWN: APPV: SHEET TITLE: of 6 (919) 858-7420 Apogee Project # Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO 2016 300 INTERIOR LIGHTING PHASE 2 LARAMIE COUNTY COMMUNITY COLELGE CHEYENNE, WY COVER SHEET

Transcript of INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light...

Page 1: INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light fixture by lux dynamics (1) 277 ... interior lighting phase 2 laramie county community colelge

DWG. No.:SCALE:

AS SHOWN

010

/19/

1610

0% C

ON

STR

UC

TIO

N D

OC

UM

EN

TSO

CB JA

V

RE

V:

DA

TE:

ISS

UE

D F

OR

:D

RW

N:

AP

PV

:

SHEET TITLE:

of 6

(919) 858-7420Apogee Project #

Raleigh, NCIndianapolis, INPhiladelphia, PAPittsburgh, PAVirginia Beach, VAFort Collins, CO

2016 300

INTE

RIO

R L

IGH

TIN

GP

HA

SE

2LA

RA

MIE

CO

UN

TY C

OM

MU

NIT

Y C

OLE

LGE

CH

EY

EN

NE

, WY

COVER SHEET

Page 2: INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light fixture by lux dynamics (1) 277 ... interior lighting phase 2 laramie county community colelge

A EXISTING 400W METAL HALIDE HIGH BAY (1) 277

EXISTING 250W METAL HALIDE HIGHBAY RECEPTACLE POWERED FIXTURE

(1) 277B

TYPE DESCRIPTION LAMPS VOLTAGE

C EXISTING 8' T12 STRIP FIXTURE (2) 277

D OWNER FURNISHED LED HIGH BAYLIGHT FIXTURE BY LUX DYNAMICS

(1) 277

E OWNER FURNISHED 8' GASKETED LEDSTRIP FIXTURE BY COLUMBIA LIGHTING

(1) 277

REMARKS

UG UNDERGROUND

TEL TELEPHONE

PED PEDESTAL

EX EXISTING

(N) NEW

APPROX APPROXIMATE

UON UNLESS OTHERWISE NOTED

WP WEATHERPROOF

EG EQUIPMENT GROUND

AWG AMERICAN WIRE GAUGE

C CONDUIT

CU COPPER

GRS GALVANIZED RIGID STEEL

CONNECT WHIP SUPPLIEDWITH FIXTURE TOJUNCTION BOX. PROVIDECOVER FOR BOX.

EXISTING I-JOIST

PROVIDE AND INSTALLBEAM CLAMP (TYP)

PROVIDE AND INSTALL 3/8" ALLTHREAD SUPPORT 12" MAX

FIXTURE STRAPPROVIDED WITH FIXTURE

8' FIXTURE

DEMO EXISTING PLUGCONNECTION

INSTALL 3/4" RGS CONDUITMATCH LENGTH OF EXISTING

NEW FIXTURE

INSTALL 3/4" DIE CAST "T" CONDUITBODY DRILL & FASTEN TO ANGLE IRONUSING 3/8" CARRIAGE BOLT WITH NUT

& LOCK WASHER

EXISTING DIE CAST "T"CONDUIT BODY

EXISTING I-JOIST ROOFSUPPORT

EXISTING ANGLE IRON

EXISTING 3/4" RGS CONDUITCONTAINING EXISTINGFUTURE WIRING (-10' LONG)

FASTEN FIXTURE TO CONDUIT USINGMYERS HUBS (NOTE: FIXTURE TOCOME FROM FACTORY PRE-DRILLEDFOR THIS APPLICATION.)

DWG. No.:SCALE:

AS SHOWN

010

/19/

1610

0% C

ON

STR

UC

TIO

N D

OC

UM

EN

TSO

CB JA

V

RE

V:

DA

TE:

ISS

UE

D F

OR

:D

RW

N:

AP

PV

:

SHEET TITLE:

of 6

(919) 858-7420Apogee Project #

Raleigh, NCIndianapolis, INPhiladelphia, PAPittsburgh, PAVirginia Beach, VAFort Collins, CO

2016 300

INTE

RIO

R L

IGH

TIN

GP

HA

SE

2LA

RA

MIE

CO

UN

TY C

OM

MU

NIT

Y C

OLE

LGE

CH

EY

EN

NE

, WY

LUMINAIRE SCHEDULE,

DETAILS, ABBREVS.

SYMBOLS, INDEX

1. DRAWINGS. PROVIDE ALL MATERIAL, LABOR, TRANSPORTATION, TOOLS, AND SUPERVISION, NECESSARY TO COMPLETETHE TOTAL ELECTRICAL JOB. ALL ITEMS NOT SPECIFICALLY MENTIONED HEREIN WHICH ARE OBVIOUSLY NECESSARY TOMAKE A COMPLETE WORKING INSTALLATION SHALL BE PROVIDED.

2. PROVIDE ALL NECESSARY POWER WIRING. POWER WIRING SHALL INCLUDE CONNECTIONS TO EQUIPMENT TERMINALS.

3. PRIOR TO SUBMITTING BIDS ON THE PROJECT, VISIT THE SITE TO BECOME AWARE OF EXISTING CONDITIONS, WHICHMAY AFFECT THE COST OF THE PROJECT.

4. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE ENFORCED EDITION OF THE NATIONALELECTRICAL CODE, N.F.P.A. 70, NATIONAL ELECTRICAL SAFETY CODE, AND ALL LOCAL AND STATE CODES ANDREGULATIONS.

5. ALL COST INCURRED BY THE ACCEPTANCE OF SUBSTITUTIONS SHALL BE BORNE BY THE CONTRACTOR. PROOF FORTHE EQUALITY OF SUBSTITUTIONS SHALL BE BY THE CONTRACTOR.

6. COORDINATE ANY AND ALL WORK WITH ANY OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICTDURING CONSTRUCTION.

7. THE CONTRACTOR SHOULD READ AND UNDERSTAND THE ENTIRE SET OF CONSTRUCTION DOCUMENTS WHICHINCLUDES BUT IS NOT LIMITED TO SPECIFICATIONS, AND ALL ENGINEERING DRAWINGS, SO THAT HE MAY UNDERSTANDTHE FULL SCOPE OF WORK AND CONVEY THE PROPER REQUIRED MATERIALS AND METHODS OF INSTALLATION TO THEESTIMATORS, SUPPLIERS AND INSTALLERS.

8. CONTRACTOR SHALL WARRANTY ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED,ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S WARRANTY IS FURNISHED, AND ALLWORK IN CONNECTION WITH INSTALLING MANUFACTURER'S WARRANTED EQUIPMENT. THIS CONTRACTOR'S WARRANTYSHALL EXIST FOR A PERIOD OF ONE (1) YEAR (UNLESS OTHERWISE NOTED ON DRAWINGS OR SPECIFICATIONS) FROMTHE DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO THE DEFECTS IN MATERIAL AND TOWORKMANSHIP OF ANY KIND.

9. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT THAT DO NOT CHANGE THE SCOPE OFINSTALLATION OR NATURE OF WORK REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT ADDITIONALCOST TO OWNER. NO OTHER CHANGES MAY BE MADE WITHOUT WRITTEN PERMISSIONS OF THE OWNER. WHERE WORKUNDER THIS PROJECT REQUIRES EXTENSION, RELOCATION, RECONNECTIONS OR MODIFICATIONS TO EXISTINGEQUIPMENT OR SYSTEMS, THE EXISTING EQUIPMENT OR SYSTEMS SHALL BE RESTORED TO ITS ORIGINAL ANDOPERATING CONDITION. EXTEND NEW HOMERUNS OR CIRCUIT EXTENSIONS, WHERE REQUIRED. DISCONNECT ANDREMOVE ALL EQUIPMENT INDICATED TO BE DEMOLISHED, INCLUDING OUTLETS, DEVICES, RACEWAYS ANDCONDUCTORS.

10. ALL JUNCTION BOXES SHALL HAVE ADEQUATE WIRING SPACE FOR THE CONDUCTORS INSTALLED.

11. DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN TWO COMPLETE SETS OF ELECTRICAL DRAWINGS TORECORD ALL CHANGES AND DEVIATIONS FROM THESE DOCUMENTS. THIS SET OF DRAWINGS SHALL NOT BE USED FOROTHER PURPOSE. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL SUBMIT THESE DRAWINGS TO THEOWNER FOR APPROVAL.

12. ACCESSIBLE GROUNDING CONNECTIONS SHALL BE BOLTED.

13. ALL JUNCTION BOXES SHALL BE LABELED WITH PANEL NAME AND CIRCUITS BEING CONTAINED. THE DIMENSIONS OFTHE OUTLET BOX SHALL BE 4" X 4" WITH A MINIMUM DEPTH OF 2-1/8".

14. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THEPROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED INSTALLATION PROCEDURES, ALL APPLICABLELOCAL AND STATE CODES, AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE.

15. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, WHERE THE BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECTMOUNTING.

16. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING HARDWARETO SUIT THE PARTICULAR INSTALLATION.

17. PROTECT EXISTING BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

18. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM.

19. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT DURINGCONSTRUCTION.

20. CIRCUITRY TO SWITCHES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S SCREW TERMINALS.

21. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREE C.

22. ALL NEW CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

23. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRDPARTY TESTING AGENCY.

Page 3: INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light fixture by lux dynamics (1) 277 ... interior lighting phase 2 laramie county community colelge

EX

EX

EXISTING PANEL'HB' BELOW

EX

EX

EX

C

EX

EX

HB-20

HB-11 HB-1 HB-2 HB-6 HB-7 HB-11 HB-10 HB-7 HB-5 HB-3 HB-12

HB-8HB-22

1

EX

2

DWG. No.:SCALE:

AS SHOWN

010

/19/

1610

0% C

ON

STR

UC

TIO

N D

OC

UM

EN

TSO

CB JA

V

RE

V:

DA

TE:

ISS

UE

D F

OR

:D

RW

N:

AP

PV

:

SHEET TITLE:

of 6

(919) 858-7420Apogee Project #

Raleigh, NCIndianapolis, INPhiladelphia, PAPittsburgh, PAVirginia Beach, VAFort Collins, CO

2016 300

INTE

RIO

R L

IGH

TIN

GP

HA

SE

2LA

RA

MIE

CO

UN

TY C

OM

MU

NIT

Y C

OLE

LGE

CH

EY

EN

NE

, WY

UPPER ARENA LIGHTINGDEMOLITION PLAN

ED1013

Page 4: INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light fixture by lux dynamics (1) 277 ... interior lighting phase 2 laramie county community colelge

EX

EX

EX

EX

EX

EX

HB-14

EXISTING PANEL 'HB'

1

DWG. No.:SCALE:

AS SHOWN

010

/19/

1610

0% C

ON

STR

UC

TIO

N D

OC

UM

EN

TSO

CB JA

V

RE

V:

DA

TE:

ISS

UE

D F

OR

:D

RW

N:

AP

PV

:

SHEET TITLE:

of 6

(919) 858-7420Apogee Project #

Raleigh, NCIndianapolis, INPhiladelphia, PAPittsburgh, PAVirginia Beach, VAFort Collins, CO

2016 300

INTE

RIO

R L

IGH

TIN

GP

HA

SE

2LA

RA

MIE

CO

UN

TY C

OM

MU

NIT

Y C

OLE

LGE

CH

EY

EN

NE

, WY

LOWER ARENA LIGHTINGDEMOLITION PLAN

ED1024

Page 5: INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light fixture by lux dynamics (1) 277 ... interior lighting phase 2 laramie county community colelge

EXISTING PANEL'HB' BELOW

E

HB-20

HB-11 HB-1 HB-2 HB-6 HB-7 HB-11 HB-10 HB-7 HB-5 HB-3 HB-12

HB-8HB-22

2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D2 D

2 D

2 D

2 D

2 D

2 D

2 D

2 D

2 D

2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D

2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D

2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D

2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D

2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D 2 D

3

E

3

E

3

E

3

E

3

E

3

E

3E

3E

3E

3E

3E

3E

3E

3E

3E

3E

3E

3

E3

E

3

E3

E3E3E3E3E3E3E3E3E3E3

E E E E3 E E E E E E E E1

EE EEEEEEEEEE

11111111111

1 1 1 1 1 1 1 1 1 1 1 1E1

E1

HB-17

DWG. No.:SCALE:

AS SHOWN

010

/19/

1610

0% C

ON

STR

UC

TIO

N D

OC

UM

EN

TSO

CB JA

V

RE

V:

DA

TE:

ISS

UE

D F

OR

:D

RW

N:

AP

PV

:

SHEET TITLE:

of 6

(919) 858-7420Apogee Project #

Raleigh, NCIndianapolis, INPhiladelphia, PAPittsburgh, PAVirginia Beach, VAFort Collins, CO

2016 300

INTE

RIO

R L

IGH

TIN

GP

HA

SE

2LA

RA

MIE

CO

UN

TY C

OM

MU

NIT

Y C

OLE

LGE

CH

EY

EN

NE

, WY

UPPER ARENA LIGHTING PLAN

E1015

Page 6: INTERIOR LIGHTING PHASE 2 - Home Page - · PDF filed owner furnished led high bay light fixture by lux dynamics (1) 277 ... interior lighting phase 2 laramie county community colelge

HB-14

EXISTING PANEL 'HB'

3

1

4

2

DWG. No.:SCALE:

AS SHOWN

010

/19/

1610

0% C

ON

STR

UC

TIO

N D

OC

UM

EN

TSO

CB JA

V

RE

V:

DA

TE:

ISS

UE

D F

OR

:D

RW

N:

AP

PV

:

SHEET TITLE:

of 6

(919) 858-7420Apogee Project #

Raleigh, NCIndianapolis, INPhiladelphia, PAPittsburgh, PAVirginia Beach, VAFort Collins, CO

2016 300

INTE

RIO

R L

IGH

TIN

GP

HA

SE

2LA

RA

MIE

CO

UN

TY C

OM

MU

NIT

Y C

OLE

LGE

CH

EY

EN

NE

, WY

LOWER ARENA LIGHTING PLAN

E1026