Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot...
-
Upload
albert-bayliff -
Category
Documents
-
view
213 -
download
0
Transcript of Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot...
![Page 1: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/1.jpg)
INTERIM PERMITS
![Page 2: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/2.jpg)
Interim Permits - What?
Interim Permits are for the correction of pollution hazards at the feedlot facility.
Facility is less than 1000 animal units
Facility does not meet the definition of a large CAFO
MPCA Policy - Interim Permit for Feedlots Under 10/50 AU Thresholds○ *116.07 (g) – exempts facilities with less than 10 animal units in
shoreland or 50 animal units from feedlot permit requirements http://www.pca.state.mn.us/index.php/view-document.html?gid=3646
![Page 3: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/3.jpg)
Interim Permits - Also….
Land Application of Manure if: Facility is > 300 animal units; and
○ Applied manure not in a special protection area Soil P Test > 150 ppm Bray P1 or Soil P Test > 120 ppm Olsen
○ Applied manure within a special protection area Soil P Test 76 – 150 ppm Bray or Soil P Test 61 – 120 ppm Olsen and Field slopes exceed 6%
○ Applied manure is within medium or high vulnerable Drinking Water Supply Management Areas (DWSMA)
Not Very Common
![Page 4: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/4.jpg)
Interim Permits - Why? The Interim Permit provides a
mechanism for the agency or delegated county to get the environmental problem addressed in a much shorter period of time than could be achieved through the agency or county attorney pursuing an enforcement action.
![Page 5: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/5.jpg)
Interim Permits - Why? Fix pollution problem(s) Establish a Schedule of Compliance Authorizes Const/Expan while continuing to
operate Allows us to track return to compliance
Cost share dollarsLegislature (funding)General Public
Alternative is enforcement Other?
![Page 6: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/6.jpg)
Interim Permits - When? Facility has a pollution hazard.
A feedlot or manure storage area that does not meet the requirements of 7020.2000 to 7020.2225.
![Page 7: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/7.jpg)
Types of Pollution Hazards Open Lot Runoff LMSA Failure Unpermitted LMSA Discharge From Barns Feed Storage Area Runoff Stockpile Setback Violations Land Application
Setback ViolationsOver-application
![Page 8: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/8.jpg)
Interim Permits - When?
![Page 9: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/9.jpg)
![Page 10: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/10.jpg)
![Page 11: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/11.jpg)
![Page 12: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/12.jpg)
![Page 13: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/13.jpg)
![Page 14: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/14.jpg)
![Page 15: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/15.jpg)
Interim Permits -
Issued for a maximum of 24 monthsTime frame defined in the permitMay be extended by no more than 90 days
Contain a Schedule of ComplianceFinal compliance date = expiration dateCan include interim submittal dates
Expansion LimitationsRequires correction of problem prior to
stocking expansion
![Page 16: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/16.jpg)
Interim Permits - Authorizes continued facility operation
while fix is developed and implemented Requires owner to minimize the pollution
hazard until fix is installed and fully operationalDepending on the pollution hazard –
immediate response is necessary to stop or prevent a discharge to waters of the state
![Page 17: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/17.jpg)
![Page 18: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/18.jpg)
Interim Permits - Difficulties Producers are reluctant to correct
pollution hazardsUnderstanding/accepting there is a problemCosts to return to complianceCan lead to a lack of cooperation
Statutory Spending LimitationsMN Statute 116.07 Subd. 7 (p)Limits the amount of money a regulatory
authority can force a producer to spend to correct a pollution hazard
![Page 19: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/19.jpg)
Spending Limitations - (1) to spend more than $3,000 to upgrade an existing feedlot
with less than 300 animal units unless cost-share money is available to the feedlot operator for 75 percent of the cost of the upgrade; or
(2) to spend more than $10,000 to upgrade an existing feedlot with between 300 and 500 animal units, unless cost-share money is available to the feedlot operator for 75 percent of the cost of the upgrade or $50,000, whichever is less.
Spending Limitations do not apply if feedlot is determined to be an immediate public health threat. (145A.04, subd. 8) If a threat to the public health such as a public health nuisance,
source of filth, or cause of sickness is found on any property …
![Page 20: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/20.jpg)
Interim Permits - Difficulties Additional time commitments
Make sure project is moving forwardMaintaining working relationshipKeeping everyone involved
○ Producer, NRCS, SWCD, JPO, Engineers, Zoning Officials, BMP Loans, Etc…
Follow-up○ Project inspections○ Documentation○ Closure
![Page 21: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/21.jpg)
Interim Permits - In the end our goal is to find problems
and fix them.
![Page 22: Interim Permits - What? Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.](https://reader035.fdocuments.in/reader035/viewer/2022070307/551b44735503465c7e8b534f/html5/thumbnails/22.jpg)
QUESTIONS