Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public Service Commission, Jackson MS [email protected] July 22 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. July 22, 2011

Transcript of Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection...

Page 1: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Standards

Net Metering and Interconnection Standards Information Seminar

Mississippi Public Service Commission, Jackson MS

[email protected]

July 22 2011

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

July 22, 2011

Page 2: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Smart Grid Interconnection and Interoperability Standards DevelopmentInteroperability Standards Development

To facilitate the evolution of the

Objective 

(Insert graphic here)

To facilitate the evolution of the existing electric power system into a smart grid by supporting the development of standards and best practices.  

Interconnection Standards presentation for the 7/22/11 

Technical Scope Development of national and international standards and best p / /

Information Seminar by the Mississippi Public Service Commission Jackson MS

international standards and best practices for electric power system interfaces, interconnection and i bili i

NATIONAL RENEWABLE ENERGY LABORATORY

Commission, Jackson MS.  interoperability requirements

2

Page 3: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Benefits of Standards

• Facilitates standardized designs, engineering implementation, interoperability, and installation –

•Safeguards against hazards 

• Fosters quality design and manufactureinteroperability, and installation 

lower cost.  • Simplifies conformance assessment (to standards permitting and rules)

manufacture • Increases competitiveness in industry 

• Creates and expands markets(to standards, permitting, and rules) • Assists increased system quality and reliability achievement 

P d d i i

• Creates and expands markets  • Facilitates Trade and Commerce • Assurance is provided when 

d t t lit t d d• Promotes advanced communication and software platforms 

• Enables enhanced grid intelligence 

products meet quality standards, then users need not be concerned with further testing or evaluation f h d

NATIONAL RENEWABLE ENERGY LABORATORY

3

g gof the product   

Page 4: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

OUTLINE

• Background gElectricity infrastructure and interconnection

• Introduction of interconnection rules (includes shared slides RAP/NREL)

• Interconnection Rules - Technical Standards- Testing and Certification - Interconnection Procedures

• Background Slides

NATIONAL RENEWABLE ENERGY LABORATORY

4

Page 5: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

The Electricity GridGeneration Transmission Distribution

13,200 volts

345,000 volts

Subtransmission

69,000 volts 13,200 volts

Generating Station

Transmission Substation

Transmission Lines

Transmission Substation

Industrial Customer Distribution

Substation

Commercial/Residential Customers

120/240volts480

volts

Station Substation Substation Substation

DistributionSubstation

T fGenerator Transformer

Transmission LineDistribution LineSubtranmission

Line

Transformer

Breaker

LoadsEl t i l O Li Di

DistributionTransformer

NATIONAL RENEWABLE ENERGY LABORATORY5

LoadsElectrical One-Line Diagram

Page 6: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Electrical Distribution Systems

Hospital

Office BuildingLow-Density Residential

High-Density Residential

Spot Networks

Electric Distribution Substation

Area/Street Networks

NATIONAL RENEWABLE ENERGY LABORATORY

6

Page 7: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection and Integration of Distributed Resources with the Electric Power System

Central Station

Wind EnergyCombustion Engines

Fuel Cells

The overall power system is traditionally viewed in terms of 7 layers; h l f i it f ti i f t l t ti

MicroTurbines

NATIONAL RENEWABLE ENERGY LABORATORY 7

each layer performing its function ranging from central station generation supplying power outward to customers.

Solar Energy

Page 8: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Rules

• Technical Standards

Interconnection Rules

• Testing and Certification • Interconnection ProceduresInterconnection Procedures e.g., Application Forms and Processes, Agreements, Screens, Timelines, Fees,Agreements, Screens, Timelines, Fees, Insurance, Dispute Resolution, etc.

NATIONAL RENEWABLE ENERGY LABORATORY 8

Page 9: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Rules, Jurisdiction, etc.

NATIONAL RENEWABLE ENERGY LABORATORY

9

Page 10: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Implementation Challenge: Putting the Pieces Together g g

Technical

Standards

Technical 

Testing & Certification 

InterconnectionProcedures and AgreementsAgreements

NATIONAL RENEWABLE ENERGY LABORATORY

10

Page 11: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Introduction to Interconnection Rules(Details on technical standards and procedures this afternoon)

Goals for best practice include:p– Transparency – Requirements fully stated – Consistency – With consensus industry

technical standardstechnical standards– Certainty – System can be interconnected if standards are met

and procedures are followedUniformity Requirements are the same across utilities (at least– Uniformity – Requirements are the same across utilities (at least all regulated utilities)

– Timely interconnection – Standard timeframes that enable an estimate of expected on line date and mitigate delaysestimate of expected on-line date and mitigate delays

– Reasonable fees – Uniform and cost-based

NATIONAL RENEWABLE ENERGY LABORATORY 11

Page 12: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Only States Have Authority Over State-Jurisdictional Interconnections

• FERC interconnection procedures and agreements do notapply to state-jurisdictional interconnections like PURPA and net

State Jurisdictional Interconnections

metering.

• If states do not act, uncertainty, higher costs and delays may pose significant barriers to state’s distributed generation goalspose significant barriers to state s distributed generation goals

• State (PSC in this case) can adopt technical standards and procedures for interconnections under its jurisdiction.

– For net-metered systems, technical standards and procedures can be: 1) part of net metering rule, or 2) covered in a stand-alone rule for small generators for all state-jurisdictional interconnections g j(including net metering and PURPA)

• In addition, PSC can require utilities to file interconnection applications and agreements for approval or develop standard

NATIONAL RENEWABLE ENERGY LABORATORY

applications and agreements for approval or develop standard form documents through rulemaking or other docket

12

Page 13: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Jurisdictional Issues Between States & FERC Can Be A Complicating Factor

• FERC Has Jurisdiction for Distributed Resource

FERC Can Be A Complicating Factor

Interconnections That Participate in Wholesale Markets (even if Interconnected at Distribution Level)

• All Retail Interconnections Fall Under Jurisdiction of State PUCs e g Net MeteringPUCs, e.g. Net Metering

• Ideally, Wholesale and Retail InterconnectionIdeally, Wholesale and Retail Interconnection Requirements Should Be Similar

NATIONAL RENEWABLE ENERGY LABORATORY 13

Page 14: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Components of an Interconnection Rule 1 of 2

Technical standards– Provide consistent, transparent requirements for interconnecting

with utility systems– Uniformly applied (at least for regulated utilities in the state)– Use accepted industry standards

• Institute of Electrical and Electronics Engineers (IEEE) Standard 1547 series for Interconnecting Distributed Resources with Electric Power Systems

• American National Standards Institute (ANSI) standard code for electricity metering

• Underwriters Laboratories (UL) 1741 - Inverters, Converters, and Controllers for Use in Independent Power SystemsControllers for Use in Independent Power Systems

– Require compliance with applicable building codes, national electrical code (NEC), national electrical safety code (NESC), and related siting and permitting mandates

NATIONAL RENEWABLE ENERGY LABORATORY

and, related siting and permitting mandates.

14

Page 15: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Standard Interconnection ProceduresComponents of an Interconnection Rule 2 of 2

Standard Interconnection Procedures– Ensure consistency with IEEE 1547 standards– Include specified timelines for each step toward an

i t ti t ith th tilitinterconnection agreement with the utility– Use technical screens to: 1) allow net metering facilities that do

not require review beyond information in the application to be approved quickly (small, UL-certified) and 2) ensure otherapproved quickly (small, UL certified) and 2) ensure other systems receive appropriate evaluation

• Typically 3 (or 4) “levels” or “tiers”• Deal with issues like penetration of distributed generation on the

feeder and other local grid parametersfeeder and other local grid parameters– Provide expedited review for certified equipment

• An equipment package certified by a nationally recognized test lab (NRTL, e.g., UL, CSA, TUV) for continuous interactive operation with ( , g , , , ) pan electric distribution system in compliance with applicable standards; no further product review, testing or additional equipment required for that product

• Installation and commissioning testing may be waived

NATIONAL RENEWABLE ENERGY LABORATORY

g g y

15

Page 16: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Standard Applications and Agreements

Application – Provides information to utility about proposed net metering facility, level of interconnection review sought, contractor, equipment certification, anticipated date facility will be operational, etc.anticipated date facility will be operational, etc.Agreement – Governs connection of net metering facility to utility system and ongoing operation of facility

NATIONAL RENEWABLE ENERGY LABORATORY 16

Page 17: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Fees & Dispute Resolution

Fees for reviewing interconnection application– Typically no fee or nominal fee (e.g., $100) for level 1-eligible systems – Specified, higher fees for other systems – e.g., $50 + $1 per kW of net p , g y g , $ $ p

metering facility’s capacity for level 2; $100 + $2 per kW for level 3– Plus reasonable hourly fee for any additional engineering work and

reasonable cost of any required modifications to utility system (utility id d i i i d d h l )provides cost and time estimates in advance and charges actual cost)

Uniform technical standards and procedures minimize disputes over interconnection requirements, timelines and fees Specify in rule that dispute resolution will be through standard Commission complaint procedures or a specified process for interconnection disputes

// / / ?– Examples: MT - http://www.mtrules.org/gateway/ruleno.asp?RN=38.5.8413Oregon – OAR 860-082-0080 at http://arcweb.sos.state.or.us/rules/OARS_800/OAR_860/860_082.html

NATIONAL RENEWABLE ENERGY LABORATORY 17

Page 18: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Rules

• Technical Standards

Interconnection Rules

• Testing and Certification • ProceduresProcedures, e.g., Application Forms and Processes, Agreements, Screens, Timelines, Fees,Agreements, Screens, Timelines, Fees, Insurance, Dispute Resolution, etc.

NATIONAL RENEWABLE ENERGY LABORATORY 18

Page 19: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Technical Standards and Practices Can Be a Barrier

PJM-NREL Interconnection Standards Audit Results

Summary (*Blue Font underlined indicates IEEE 1547 requirements that may be pre-certified)

IEEE Std 1547 Clause IEEE Std 1547 Requirement PJM / TO Std Requirement

4 1 General Requirements (heading only) N/A ConclusionsRequirements vary

from utility to utility

4.1 General Requirements (heading only) N/A

4.1.1 Voltage RegulationDR shall not actively regulate voltage; not cause the Area EPS voltage at other PCCs to go outside requirements of ANSI C84.1 Range A.

No

4.1.2 Integration with Area EPS grounding

Grounding scheme shall not cause overvoltages that exceed rating of the equipment connected to the Area EPS No

from utility to utilityRequirements not

transparent

Shall not disrupt coordination of Area EPS ground fault protection Yes

4.1.3* Synchronization Not cause Area EPS prevailing voltage at PCC to exceed +/- 5% fluctuation No

Shall meet clause 4.3.2 flicker requirements No4 1 5 Inadvertant

Requirements not uniformly applied

M dditi l

4.1.5 Inadvertant Energization of the Area EPS Shall not energize a de-energized Area EPS Yes

4.1.6 MonitoringAggregate gen > 250 kva shall have provisions for monitoring (connection status, KW, KVAR, & voltage) at the DR connection

Yes, but size varies (often more data required by TO)

4.1.7* Isolation Device When required by TO, shall provide readily accessible, Yes Many additional requirements probably not needed

4.1.7 Isolation Device When required by TO, shall provide readily accessible, Yeslockable, visible-break isolation device

4.1.8 Interconnect Integrity (heading only) N/A 4.1.8.1* EMI EMI withstand shall meet C37.90.2 No4.1.8.2* Surge Withstand Shall meet C62.41.2 or C37.90.1 V&I withstand capability No4.1.8.3* Paralleling Device Shall be capable of withstanding 220% of system rated V No

NATIONAL RENEWABLE ENERGY LABORATORY 19

4.1.4 DR on distribution secondary grid and spot networks. (heading only) N/A4.1.4.1 Distribution secondary grid networks. (Under consideration for future revisions of std. No 4.1.4.2 Distribution secondary spot networks (multiple requirements in 1547) No

Page 20: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Standards and Codes – Which Apply?pp y

Relevant Standards

• IEEE 1547 ‐ Interconnection of DR to Utilities • IEEE 1547 1 – Test Procedures for Interconnection• IEEE 1547.1 – Test Procedures for Interconnection  • UL 1741 ‐ Standard for Interconnection Equipment including Inverters

Important Codes

• NEC ‐ National Electrical Code (Home and Business)• NESC ‐ National Electrical Safety Code (Utility Safety) A li bl b ildi it d th l t d d

NATIONAL RENEWABLE ENERGY LABORATORY 20

• Applicable building, site, and other related codes  

Page 21: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Standards and Codes – Where Do They Apply?

IEEE 1547 (at the  (PCC*) 

NATIONAL RENEWABLE ENERGY LABORATORY

*PCC ‐‐point of common coupling is where 1547 requirements apply   21

Page 22: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

ANSI/IEEE Standard 1547 (2003, reaffirmed 2008)  

1‐2‐3 Overview, Definitions, References 

4.0 Interconnection Technical S ifi ti d R i tSpecifications and Requirements: . General Requirements  .  Response to Area EPS Abnormal ConditionsAbnormal Conditions

.   Power Quality

.   Islanding  5.0 Test Specifications and pRequirements: .   DesignTests.   Production Tests  .   Interconnection InstallationEvaluation   

.   Commissioning Tests d

NATIONAL RENEWABLE ENERGY LABORATORY

.   Periodic Interconnection Tests 

22

Page 23: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE Std 1547.1 (2005; reaffirmed 2011) 

… Standard for Conformance Test Procedures …specifies the type, production, and f f p yp , p ,commissioning tests that shall be performed to demonstrate that interconnection functions and equipment of a distributed resource (DR) conform to IEEE Std 1547.  

NATIONAL RENEWABLE ENERGY LABORATORY

Figure 1 ‐ Boundaries between the interconnection system, EPS and DR.  23

Page 24: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

UL 1741: UL Standard for Safety for Inverters, Converters, Controllers and Interconnection Equipment for Use With Distributed Energy ResourcesDistributed Energy Resources

• NREL contracted UL to update 1741 (2005) to include all DR interconnections.  

• For utility interactive equipment, UL 1741 supplements and is to be used in conjunction with IEEE 1547 and IEEE 1547.1;  

• Construction, Materials, wiring, component spacing, etc.

i i i k f i j• Protection against risks of injury to persons

• Output Characteristics and utility compatibility 

(This section includes requirements from IEEE 1547)(This section includes requirements from IEEE 1547) 

• Rating, Marking

• Specific DR Tests for various technologies

NATIONAL RENEWABLE ENERGY LABORATORY

24

Specific DR Tests for various technologies 

(PV, Wind, Microturbine, Fuel Cell, Engine)

Page 25: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

NESC Requirements

NESC Code NESC Requirements for De-energized Work

• Section 444 of the NESC details requirements• Isolate - operate switches,disconnects and lockout /tag• Test for voltage• Install protective grounds on• Install protective grounds on

each side of the work location

NATIONAL RENEWABLE ENERGY LABORATORY

25

Page 26: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Rules:

• Technical Standards

Interconnection Rules:

• Testing and Certification • ProceduresProcedures, e.g., Application Forms and Processes, Agreements, Screens, Timelines, Fees,Agreements, Screens, Timelines, Fees, Insurance, Dispute Resolution, etc.

NATIONAL RENEWABLE ENERGY LABORATORY 26

Page 27: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Testing and Certification

Use, and Validate Conformance to, Technical Stds– Institute of Electrical and Electronics Engineers (IEEE) Standard 1547

series for Interconnecting Distributed Resources with Electric Powerseries for Interconnecting Distributed Resources with Electric Power Systems

– American National Standards Institute (ANSI) standard code(s) for electricity metering

– Underwriters Laboratories (UL) 1741 - Inverters, Converters, and Controllers for Use in Independent Power Systems

Use, and Validate Conformance to, Applicable Codes – e.g., building codes, national electrical code (NEC), national electrical

safety code (NESC), and, related siting and permitting mandates

Require Accredited Test Labs qRequire Installation-Evaluation/Commissioning Witnessing or Approval (typically as per above standards and codes; similar to existing approaches for like-products/systems)

NATIONAL RENEWABLE ENERGY LABORATORY

existing approaches for like-products/systems)

27

Page 28: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE 1547 Interconnection Standards Use: Federal, Regional, State and Local Authorities/Jurisdictions   

NATIONAL RENEWABLE ENERGY LABORATORY

28

Page 29: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Rules:• Technical Standards

Interconnection Rules:

• Testing and Certification • Procedures, ,e.g., Application Forms and Processes; Agreements; Screens, Timelines, and Fees; gRelationship of Parties: Insurance, Dispute Resolution, Curtailment of Service, etc.

- MADRI and FERC used to illustrate example issues or criteria - Also, see Freeing The Grid that provides an illustrative list of topical considerations to be addressed in procedures and agreements

NATIONAL RENEWABLE ENERGY LABORATORY 29

Page 30: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Interconnection Procedures and Agreements

- Establish common processes and agreements for interconnection

C id diff t l l ( ) f i f- Consider different levels (screens) of review for proposed interconnection (based on power level and some grid technical parameters where it is toand some grid technical parameters where it is to be interconnected) - Fees- Timelines for different levels, e.g.,

-- Standard ProcessF T k P-- Fast Track Process

- Type Testing/Equipment Certification

NATIONAL RENEWABLE ENERGY LABORATORY 30

Page 31: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Additional Interconnection Procedures and Agreements TopicsAgreements Topics

Relationships of Parties - Insurance- Dispute Resolution- Relationship to Other Services:

– Does not cover standby, backup, distribution charges, etcetc.

– Some states have prohibition against utility using knowledge of project to offer discount rates or competing technology to keep customer on regularcompeting technology to keep customer on regular service

- Rights of curtailment and disconnection

NATIONAL RENEWABLE ENERGY LABORATORY 31

Page 32: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Typical Interconnection Process (FERC-like)

NATIONAL RENEWABLE ENERGY LABORATORY

32

Page 33: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

MADRI Model Interconnection Procedures (N ’05 Mid A l i Di ib d R I i i i )(Nov’05: Mid-Atlantic Distributed Resources Initiative)

Foster regional consistency among states’ smallFoster regional consistency among states small generator interconnection procedures across Mid-Atlantic region. tlantic egion.

Two Key Considerations:h i l S d d ( bli h• Technical Standards (establish common

requirements for DG interconnection) I l i P d ( bli h• Implementation Procedures (establish

common processes and agreements for i i )

NATIONAL RENEWABLE ENERGY LABORATORY 33

interconnection)

Page 34: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

MADRI Procedures Overview

F C t i f R i ( t 10 MVA)• Four Categories of Review (up to 10 MVA) – Level 1 <10kVA Inverter Based/Certified– Level 2 <2 MVA Inverter Based/Certified– Level 3A – DG Does Not Export Power

ExpeditedLevel 3A  DG Does Not Export Power

– Level 3 – Up to 10 MVA

• Reference to PJM Small Generator Technical Requirements (IEEE 1547 Based)(IEEE 1547 Based)

• Procedures to Connect to Area Networks• Criteria for Testing & Certification• Two Standard Interconnection Agreements

– 10 KVA and Less– > 10 KVA to 10 MVA 

l l• Multiple DG Units – interconnection request evaluated based on total aggregate capacity

• Increase in Capacity for Existing System – new agreement

NATIONAL RENEWABLE ENERGY LABORATORY

Increase in Capacity for Existing System  new agreement based on total aggregate capacity   

34

Page 35: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Application Process: MADRI

- Level 1 is for certified, inverter-based systems equal to or less than 10 kVA.- Level 2 is for certified, inverter-based systems that are equal to or less than 2 MVA or systems that did not pass a Level 1 reviewnot pass a Level 1 review.- Level 3 is for systems equal to or less than 10 MVA which do not qualify for or did not pass the c do o qua y o o d d o pass eLevel 1 or Level 2 reviews- Level 3A if for systems that do not qualify for Level 1 or Level 2 review and do not export power to the system.

NATIONAL RENEWABLE ENERGY LABORATORY 35

Page 36: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Application Process: FERC small gen interconnection process)

– “Fast Track Process” for systems not larger than 2 MW and

interconnection process)

2 MW and – “10 kW Inverter Process” for small inverter-based

systemssystems. – The “Fast Track Process” includes an “Initial

Review” and a “Supplemental Review” processReview and a Supplemental Review process. – Projects not meeting screens of the Fast Track

Process or of the 10 kW Inverter Process” moveProcess or of the 10 kW Inverter Process move into the “Study Process” which includes provisions for a “System Impact Study” and a

NATIONAL RENEWABLE ENERGY LABORATORY

provisions for a System Impact Study and a “Facilities Study”

36

Page 37: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Screening Studies

At higher screening levels, studies include:• Scoping Study - A meeting to discuss the

i t ti t d i i ti t diinterconnection request and review existing studies• Feasibility Study - Determines if there are obvious

adverse impacts identified before additional studies pare undertaken

• System Impact Study - Identifies the electric system i t th t ld lt if th d di t ib t dimpacts that would result if the proposed distributed generation project were interconnected without project or utility electric system modifications, focusing on adverse system impacts identified in feasibility study

• Facilities Study Determines the specific equipment

NATIONAL RENEWABLE ENERGY LABORATORY

• Facilities Study - Determines the specific equipment and costs needed to mitigate adverse system impacts

Page 38: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Non-FERC Example Level 1 Detailed ProceduresProcedures

NATIONAL RENEWABLE ENERGY LABORATORY 38

Page 39: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Non-FERC Example Level 2 Detailed ProceduresProcedures

NATIONAL RENEWABLE ENERGY LABORATORY 39

Page 40: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Non-FERC Example Level 3 Detailed ProceduresProcedures

NATIONAL RENEWABLE ENERGY LABORATORY 40

Page 41: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Non-FERC Example Level 4 Detailed ProceduresProcedures

NATIONAL RENEWABLE ENERGY LABORATORY 41

Page 42: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

THANK YOU!

Additional Background Slides Follow Tom Basso, Senior Engineer [email protected] (303) 275 - 3753NREL (National Renewable Energy Laboratory) Electricity Resources and Building Systems Integration CenterElectricity, Resources and Building Systems Integration Center Distributed Energy Systems Integration Group

* NREL http://www nrel govNREL http://www.nrel.gov1617 Cole Blvd. MS5202 Golden, CO 80401-3393

And, Vi Ch i f IEEE St d d C di ti C itt 21 (SCC21) fVice Chair for IEEE Standards Coordinating Committee 21 (SCC21) for Fuel Cells, Photovoltaics, Dispersed Generation, & Energy Storagehttp://grouper.ieee.org/groups/scc21/

IEEE 1547 Series of Smart Grid Interconnection and IEEE PV standards

NATIONAL RENEWABLE ENERGY LABORATORY 42

- IEEE 1547 Series of Smart Grid Interconnection and IEEE PV standards, and IEEE 2030 series of Smart Grid interoperability standards

Page 43: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Example Interconnection Considerations

for Photovoltaic Systems

NATIONAL RENEWABLE ENERGY LABORATORY 43

Page 44: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Utility Concerns for PV System Installations 

A Th V lid?‐ Are They Valid?

“PV Installation Must be Studied”PV Installation Must be Studied

– Generally should not be necessary withGenerally, should not be necessary with residential PV

– Necessary with larger systemsNecessary with larger systems– State Rules (or utility policies) may waive

requirements or limit costequ e e ts o t cost– What are the proposed costs of the study? Are

the proposed costs reasonable?

NATIONAL RENEWABLE ENERGY LABORATORY

p p

Page 45: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Utility Concerns for PV System Installations 

“The utility system must have upgrades”

– Service Transformer• DG sized larger than existing transformer?g g

– Utility Distribution Lines• Capacity of line insufficient? Unlikely for other than very

large DG systemslarge DG systems– Protective Equipment (Fuses, Reclosers, Breakers)

• Modifications or additions of new PE unlikely unless high t ti l DG tpenetration or larger DG systems

– Substation Level and beyond• Very unlikely, but would involve detailed studies and high

NATIONAL RENEWABLE ENERGY LABORATORY

y y gcosts. PUC approval required

Page 46: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Utility Concerns for PV System Installations 

“The penetration of PV is too high”The penetration of PV is too high

– Rules may prohibit PV interconnection on feeders withRules may prohibit PV interconnection on feeders with high penetration (greater than X%?)

– Solutions may not be practical or necessary– High penetration PV is being studied by NREL, Utilities,

other organizationsGuidelines must be developed for High Penetration PV– Guidelines must be developed for High Penetration PV deployment – minimize expensive and lengthy studies

– PV Penetration must be redefined!

NATIONAL RENEWABLE ENERGY LABORATORY

Page 47: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Required Information for Permit

Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relativedrawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides typically would not need fire service approval.

Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and acovercurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram).

Specification sheets and installation manuals (if available) for allSpecification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.

NATIONAL RENEWABLE ENERGY LABORATORY

Page 48: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE 1547 Series Standards1547‐2003 Standard for Interconnecting Distributed Resources (DR) with Electric1547 2003 Standard for Interconnecting Distributed Resources (DR) with Electric Power Systems (EPS) ‐ Reaffirmed in 2008

1547.1‐2005 Conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power Systems – Reaffirmed in 2011 y

1547.2‐2008 Application Guide for IEEE1547 Standard for Interconnecting Distributed Resources with Electric Power Systems 

1547 3 2007 Guide for Monitoring Information Exchange and Control of DR1547.3‐ 2007 Guide for Monitoring, Information Exchange and Control of DR

1547.4‐2011 Guide for Design, Operation, and Integration of Distributed Resources Island Systems with Electric Power Systems 

{“Microgrids”} 

1547.6 ‐2011 Recommended Practice for Interconnecting Distributed Resources With 

P1547.5 Draft Guidelines for Interconnection of Electric Power Sources Greater Than 10 MVA to the Power Transmission Grid

Electric Power Systems Distribution Secondary Networks

P1547.7 Draft Guide to Conducting Distribution Impact Studies for DR Interconnection

P1547.8 Draft Recommended Practice for Establishing Methods and Procedures

NATIONAL RENEWABLE ENERGY LABORATORY

P1547.8 Draft Recommended Practice for Establishing Methods and Procedures that Provide Supplemental Support for Implementation Strategies for Expanded Use of IEEE Std 1547

Page 49: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

• A Technical Standard – Functional Requirements For

• the interconnection itself • the interconnection test

• Technology neutral, e.g., does not specify particular equipment nor type A i l ( h l ) d t f

IEEE 1547  IS:

• A single (whole) document of mandatory, uniform, universal, requirements. Sh ld b ffi i t f t

IEEE 1547.1 IS:•Should be sufficient for most installations.

Test Procedures Conformance to 1547

IEEE 1547

• a design handbook  • an application guide• an interconnection agreementIEEE 1547 

Is NOT:

an interconnection agreement • prescriptive, e.g., does not address DR self‐protection, nor planning, designing, operating, or maintaining the Area EPS.

NATIONAL RENEWABLE ENERGY LABORATORY

49

p g, g

Page 50: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE 1547 Table of Contents

INTRODUCTION 

1.0  OVERVIEW 1.1  Scope 1.2  Purpose – Uniform standard

requirements 1.3  Limitations – 10 MVA or less

2.0   REFERENCES 

3.0  DEFINITIONS  

NATIONAL RENEWABLE ENERGY LABORATORY

50

Page 51: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE 1547 Definitions 

• Distributed Resource (DR) – sources of electric power that are not di l d b lk i idirectly connected to a bulk power transmission system 

• Electric Power System (EPS) – facilities that deliver power to a load• Interconnection – the result of the process of adding a DR unit to 

an area EPS• Interconnection Equipment – individual or multiple devices used in 

an interconnection systeman interconnection system• Interconnection System – the collection of all interconnection 

equipment, taken as a group, used to interconnect a DR unit(s) to EPSan area EPS 

• point of common coupling (PCC) ‐ the point where a Local EPS is connected to an Area EPS.

NATIONAL RENEWABLE ENERGY LABORATORY

51

Page 52: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

A El t i P S t (EPS)

1547 Interconnection Terms Area Electric Power System (EPS)

PCCPoint of Common

PCCPCC Coupling (PCC) PCC

Point of DRConnection

Point of DRConnection

DR unit DR unitLoad Load

Local EPS 1 Local EPS 3

DR unit

Local EPS 2

DR unitLoad oad

NATIONAL RENEWABLE ENERGY LABORATORY

52 Note: There can be any number of Local EPSs.

Page 53: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

Std 1547: Interconnection Is The Focus 

Di ib d

Area ElectricDistributed 

Resource (DR)  unit

Electric Power System (EPS)  

Interconnection 

SystemSystem

IEEE Std 1547: Interconnection system requirements & specifications, and test 

NATIONAL RENEWABLE ENERGY LABORATORY

53

requirements & specifications ; generally, the 1547 requirements apply at the point of common coupling however the equipment or devices to meet the requirements may be located elsewhere.  

Page 54: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE Std 15474 0 INTERCONNECTION TECHNICAL4.0 INTERCONNECTION TECHNICAL SPECIFICATIONS AND REQUIREMENTS

4.1  General Requirements  4.2  Response to Area EPS Abnormal Conditions4.3  Power Quality 4.4  Islanding 

5 0 INTERCONNECTION TEST SPECIFICATIONS AND5.0  INTERCONNECTION TEST SPECIFICATIONS AND  REQUIREMENTS  

5.1 Design Test 5.2 Production Tests  5.3 Interconnection Installation Evaluation   5.4 Commissioning Tests 5 5 Periodic Interconnection Tests5.5 Periodic Interconnection Tests

• ANNEX A (INFORMATIVE) BIBLIOGRAPHY   

NATIONAL RENEWABLE ENERGY LABORATORY 54

Page 55: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

4.0 Interconnection Technical Specifications and Requirements   

4.1 General Requirements

•Voltage Regulation• Integration with Area

• Inadvertent Energizing of the Area EPS

Integration with Area EPS Grounding•Synchronization

• Monitoring Provisions

• Isolation Device

• Interconnect Integrity•DR on Secondary Grid and Spot Networks

• Interconnect Integrity

NATIONAL RENEWABLE ENERGY LABORATORY

55

Page 56: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

4.0 Interconnection Technical Specifications and Requirements  (cont’d) 

4.2 Response to Area EPS AbnormalConditions

– Area EPS Faults

Conditions

• Frequency– Area EPS Reclosing

Coordination – Voltage

q y• Loss of 

Synchronism• Reconnection to Area• Reconnection to Area 

EPS 

NATIONAL RENEWABLE ENERGY LABORATORY

56

Page 57: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

4.0 Interconnection Technical Specifications & Requirements (end)

4.3 Power Quality

– Limitation of DC Injection– Limitation of Voltage Flicker Induced by the DR– Harmonics

4.4  Islanding•Unintentional Islanding• Intentional Islanding

NATIONAL RENEWABLE ENERGY LABORATORY

57

Page 58: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

5.0  INTERCONNECTION TEST SPECIFICATIONS AND REQUIREMENTSAND REQUIREMENTS

5.1 Design Test

• Abnormal voltage and

• Unintentional islanding

frequency• Synchronization

g• Limitation of DC

injection• Interconnection

integrity• Harmonics

NATIONAL RENEWABLE ENERGY LABORATORY

58

Page 59: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

5.0 INTERCONNECTION TEST SPECS AND REQS (cont’d)

5 2 P d ti T t5.2  Production Tests

Meet requirements of: t b l lt d• response to abnormal voltage and

frequency• synchronization

b f d t th f t t• may be performed at the factory or at time of commissioning

5.3  Interconnection Installation Evaluation• Grounding Integration with area EPS

Isolation Device• Isolation Device • Monitoring provisions• Area EPS faults

NATIONAL RENEWABLE ENERGY LABORATORY

59• Area EPS reclosing coordination

Page 60: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

5.0 INTERCONNECTION TEST SPECS AND REQS (end)

5.4 Commissioning Tests• Visual Inspection • Operability test on the isolation device • Unintentional islanding functionality test

Cease to energize functionality test• Cease to energize functionality test

5.5  Periodic Interconnection Tests• All interconnection-related protective

functions and associated batteries

Annex A. Bibliography

NATIONAL RENEWABLE ENERGY LABORATORY

60

Page 61: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE Std 1547.2 (application guide to IEEE 1547)… background and rationale of {IEEE 1547} technical requirements are discussed… g { } qPresented ... are technical descriptions, schematics, applications guidance, and interconnection examples to enhance the use of IEEE 1547...  

Interconnection systemThermal Interconnection system (within dashed lines)

Point of common coupling

Power distribution

DC loadsThermalloads AC loads

Area EPS

Local EPS protective relaying

DR unit electric generator

Meter

Power conversion, DR protective relaying, DR

paralleling switch

Transfer switch or paralleling switchgear

DR unit (Prime movers,

generator, storage

Area EPSprotective

relayingDR control

Meter

TAT Unit (heat recovery,

cooling,storage)

TAT unit (heat recovery, cooling,

storage)Power flow

Thermal flow

Area EPS

power system

( g rid)

DR monitoring/metering

Dispatch and control

storage) Operational control

NATIONAL RENEWABLE ENERGY LABORATORY61Figure A.1 – Functional diagram of an interconnection system

Page 62: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE Std 1547.3 MIC for DR d l f ( f h d l) f… guidelines for MIC (monitoring, information exchange, and control) for  DR 

(distributed resources) interconnected with electric power systems (EPS).   

… 4. General information about monitoring, information exchange and control (MIC)

4.1 Interoperability 4.5 Automatic Configuration 

4.2 Performance4.3 Open Systems Approach4 4 Extensibility

Management 4.6 Information Modeling4.7 Protocols 

4.4 Extensibility5. Data exchange guidelines based on 4.1.6 of IEEE Std 1547 6. Business and operation processes 7. Information exchange model8. Protocol Issues 9 Security guidelines for DR implementation

NATIONAL RENEWABLE ENERGY LABORATORY

9. Security guidelines for DR implementation Annexes (informative)

62

Page 63: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE Std 1547.3 Guide for MIC for DR  

id li f it i i f ti h d t l (MIC) f di t ib t d… guidelines for monitoring, information exchange, and control (MIC) for distributed resources (DR) interconnected with electric power systems (EPS). 

Area EPS Operator DR Operator DR MaintainerDR Aggregator

Information Exchange Interface (IEI) 1547.3 Figure 1

PCC

Area EPS

1547.3 Figure 1

Reference 

diagram for 

Point of DRConnection

Point of LoadConnection

DR

information 

exchange.  

Matter of Packaging

Connection DRController

BuildingEMSDR

Unit

DRUnit

…Unit Load

NATIONAL RENEWABLE ENERGY LABORATORY

LegendInterconnection Info Path (focus of this guide)Local Info Path (not addressed in this guide)Electric Path (not addressed in this guide)

Local EPS

63

Page 64: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

IEEE Std 1547.4 (micro-grids/planned DER Islands)E.g., DER (generation and energy storage) technologies are integrated with all g , (g gy g ) g gothers including the grid technologies to form Micro‐grids (planned islands; includes – load management, voltage  & VAR control, active participation, etc.)   

L

Facility Island

CB1LCB2

Secondary Island

Substation Feeds

Step-Down Transformers

(open for substation

island)

(open for substation bus island)

(open for facility island)

N.C.

L L

(open for circuit island)

CB4

CB5

N.C.N.C.

Adjacent Circuit

N.O. (closed for adjacent circuit island)

)

Adjacent

Open for lateral island

RC1CB3

CB6

RC2

Substation Bus Island

Bus

Circuit Island

Lateral islandCircuit Island

Legend

Figure 1 – Examples 

of DR island systems

NATIONAL RENEWABLE ENERGY LABORATORY64

Substation Island

L

Distributed Generator

Breaker

Recloser

Load

Page 65: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

P1547.7 Guide to Conducting Impact Studies • Describes criteria scope & extent for engineering studies of the• Describes criteria, scope, & extent for engineering studies of the impact of DR on distribution system.  • Methodology for performing engineering studies.  

d d d b d f f• Study scope and extent described as functions of     identifiable characteristics of:   

‐ the distributed resource,the distributed resource, ‐ the area electric power system, and ‐ the interconnection. 

• Criteria described for determining the necessity of impact mitigation. • Guide allows a described methodology for:  

When impact studies are appropriate‐ When impact studies are appropriate, ‐ What data is required, ‐ How studies are performed, and 

NATIONAL RENEWABLE ENERGY LABORATORY

p ,‐ How the study results are evaluated. 

65

Page 66: Interconnection Standards - Regulatory Assistance Project · 2018-06-07 · Interconnection Standards Net Metering and Interconnection Standards Information Seminar Mississippi Public

P1547.8 Recommended Practice … to Extend Use of 1547

• Need for P1547.8 is to address industry driven recommendations and NIST smart grid standards framework recommendations (e.g., NIST priority action l )plans).  

• Example considerations include: voltage ride thru; lt ti t id t tvolt‐ampere reactive support; grid support; two‐way 

communications and control; advanced/interactive grid‐DR operations; high‐penetration levels and multipleDR operations; high penetration levels and multiple interconnections; interactive inverters; energy storage; electric vehicles; DR (and aggregates) greater than 10 

NATIONAL RENEWABLE ENERGY LABORATORY

( gg g ) gMVA; etc.   