INTERCITY PASSENGER RAIL NORTHEAST UPDATE

20
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29, 2012 1

description

INTERCITY PASSENGER RAIL NORTHEAST UPDATE. AASHTO – FEBRUARY 29, 2012. Northeast Region HSIPR UPDATE. Criticality of NEC mainstem and feeder lines Essential role of high speed rail corridors Northeast funding status NEC Commission FRA Service Development Plan and EIS - PowerPoint PPT Presentation

Transcript of INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Page 1: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

INTERCITY PASSENGER RAILNORTHEAST UPDATE

AASHTO – FEBRUARY 29, 2012

1

Page 2: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Northeast RegionHSIPR UPDATE

Criticality of NEC mainstem and feeder linesEssential role of high speed rail corridors Northeast funding statusNEC Commission FRA Service Development Plan and EISNew England Compact

2

Page 3: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

3

Page 4: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

4

Page 5: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

New Haven-Hartford-Springfield Rail Program

Program Update

5

Page 6: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

NHHS Rail Program Recap Program Goals:

Enhanced regional rail service Frequent service in the peak hours Seamless connections to Amtrak & Metro North Continued growth in local freight rail service

Long Term Vision 25 Round Trip Trains Additional connections to Boston, and Montreal 30 minute, bi-directional, peak hour service Hourly off-peak service

Start-up Service – 2016 17 Round Trip Trains 45 minute frequency in the peak hour, hourly off-peak Bi-directional service south of Hartford

6

Page 7: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

The NHHS Rail Corridor

Owner/Operator: Amtrak Length: 62 miles Infrastructure Conditions

Structures over 100 years old with severe drainage problems

Double-tracked until 1980s with 12’-6” track centers

– 23.3 miles of double track– 38.7 miles of single track

Hartford Viaduct: 1888 Connecticut River: 1905

At-Grade Crossings: 35 public crossings 13 private crossings

7

Page 8: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Modernizing the NHHS Infrastructure1. Track & signal improvements: 44.5 miles of new double track, signals & PTC

2. Structures & drainage upgrades: 125 deficient structures

3. At-grade crossing upgrades to meet Quiet Zone standards

4. Station enhancements: high-level platforms & parking

5. State-of-Good-Repair improvements: Hartford Viaduct & Conn River Bridge

8

Page 9: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

9

NHHS Corridor

Springfield Union Station (Amtrak)

Windsor Locks (Amtrak)

Windsor (Amtrak)

Hartford Union Station (Amtrak)

Berlin (Amtrak)

Meriden (Amtrak)

Wallingford (Amtrak)

New Haven State St. StationNew Haven Union Station (Amtrak)

Existing Stations

Enfield

West Hartford

Newington

North Haven

Page 10: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Current Funding Status

Preliminary Program Cost: $647 million Does not include: future stations; new trains; upgrades to the Connecticut River

Bridge or Hartford Viaduct

Funding Awards & Bond Proceeds Available to Date: $471 million Meriden-Berlin: $40 million in Federal funding New Haven-Hartford: $121 million in Federal funding Hartford-Springfield: $30 million in Federal Funding State Funding: $280 million in bond authority

Additional Annual Funding Opportunities Future FRA or FTA funding

10

Page 11: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Phasing NHHS Improvements

Work has Been Phased To Match Funding Availability FRA awarding grants as funding becomes available

Each grant requires projects with Independent Utility

Current Phases Phase 1: Meriden-Newington (ARRA: obligated) Phase 2: New Haven-Hartford (FY 2010: awarded) Phase 3A: Hartford-Windsor (ARRA: obligated) Phase 3B: Windsor-Springfield (unfunded) Phase 4: Regional Rail Upgrades (unfunded) Phase 5: Ongoing State-of-good-repair Upgrades (unfunded)

11

Page 12: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Phasing NHHS Improvements

12

Phase 1: Meriden-Newington Adds 10.2 miles of second track between

Meriden and Newington Cost: $60 million

– $40 million Federal;– $20 million State)

Funding fully obligated

Meriden (Amtrak)

Berlin (Amtrak)

Page 13: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

13

Phasing NHHS Improvements

Phase 2: New Haven-Hartford Adds all new track, signal, bridge and

station infrastructure for additional service between New Haven and Hartford

Adds new service during peak morning/evening rush hour

Cost: $262 million – $121 Federal– $141 State

Funding Awarded, Awaiting Obligation

Hartford Union Station (Amtrak)

Berlin (Amtrak)

Meriden (Amtrak)

Wallingford (Amtrak)

New Haven Union Station (Amtrak)

New Haven State St. Station

Windsor Locks (Amtrak)

Windsor (Amtrak)

Springfield Union Station (Amtrak)

Page 14: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

14

Phasing NHHS Improvements

Springfield Union Station (Amtrak)

Windsor Locks (Amtrak)

Windsor (Amtrak)

Phase 3A: Hartford-Windsor 7.5 miles of double track/sidings Structure repairs New signal system/PTC extending

from Hartford to Springfield 9 at-grade crossing upgrades New interlocking Cost: $43 million

– Federal: $30 million– State: $13 million

Funding fully obligated

Hartford Union Station (Amtrak)

Berlin (Amtrak)

Meriden (Amtrak)

Wallingford (Amtrak)

New Haven Union Station (Amtrak)New Haven State St. Station

Page 15: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

15

Phasing NHHS Improvements

Springfield Union Station (Amtrak)

Windsor Locks (Amtrak)

Windsor (Amtrak)

Phase 3B: Windsor-Springfield Complete double track/sidings to

Springfield Structure repairs Station Upgrades at Windsor and

Windsor Locks Upgrade remaining at-grade crossings New interlockings Environmental Assessment Underway Efforts underway to secure funding

Hartford Union Station (Amtrak)

Berlin (Amtrak)

Meriden (Amtrak)

Wallingford (Amtrak)

New Haven Union Station (Amtrak)New Haven State St. Station

Page 16: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

16

Phasing NHHS Improvements Enfield

Newington

North Haven

West Hartford

Phase 4: Regional Rail Upgrades

Constructs four new NHHS stations (North Haven; Newington; West Hartford; Enfield) and adds a platform to the State St. Station

New train equipment Environmental Assessment Underway Efforts underway to secure FTA

funding

New Haven State St. Station

Page 17: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

17

Phasing NHHS Improvements

Phase 5: Ongoing State- of-Good-Repair Program

Repair Hartford Viaduct and Connecticut River Bridge

Upgrade other structures and facilities as required

Page 18: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

18

Phase 5: State-of-Good-Repair Program

18

Scope: Hartford Viaduct

– 20-year renewal– Long-term relocation– Assessment underway

Connecticut River Bridge– Rehabilitation/replace center truss– Double track– Ready for Preliminary Engineering

Bridges/culverts in existing 2-track areas

Page 19: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Program Benefits Fast, Convenient Regional Transportation

Connects/integrates regional transportation across New England

More frequent service Faster service

Creates Engine For Local Economic & Station Area Development

Construction-related & long-term job growth

Provides the connections to livable communities along the rail line

Establishes An Interconnected Intermodal Transportation System for Connecticut’s Future

Metro North – Shoreline East Amtrak – Local bus services Busway – Bradley International Airport

19

Page 20: INTERCITY PASSENGER RAIL NORTHEAST UPDATE

Key NHHS Dates

2012 February: Publish Environmental Document, complete Preliminary Design Phase 3A

March-June: Complete Preliminary Design Phase 2

June: Final Design in progress for all funded phases

August: initiate Amtrak signal cable replacement /PTC

September : Submit DEEP and USACE permit applications

2013 Receive permits; start construction on grade crossings, bridges, and culverts

2014 Start Station Construction

2015 Installation of new track

2016 Initiate start-up service