  • Interchange Schedul ing Reference Manua l

    April 21, 2016

    Version 4.0

  • Southwest Power Pool, Inc.

    Interchange Scheduling Reference Manual 1

    Revision History

    Date / Version #

    Author Change Description

    09/12/2012 Version 1.0

    Shari Brown Initial Creation of Draft

    10/09/2012 Version 1.0

    Shari Brown Formal Draft for internal review and comments and edits from staff

    10/18/2012 Version 1.0

    Shari Brown Completed Internal review and edits from Operations Market staff

    01/28/2013 Version 1.0

    Shari Brown Added Market Import Service Info added examples for Ramp Reservation System and cleaned up references for publication

    02/1/2013 Version 1.0

    Shari Brown Official Publication

    11/13/2013 Version 1.0

    Shari Brown Revised for Protocol and BP changes as well as for EES move to MISO

    02/12/2014 Version 1.0

    Shari Brown Revised for additional of Marketplace Tagging HUB

    05/28/2014 Version 1.0

    Shari Brown Revised for helpful hint for OASIS links on Scenario Analyzer and EFFATC reports

    09/4/2014 Version 1.1

    Shari Brown Revised for changes made since beginning of Marketplace

    04/21/2015 Version 2.0

    Shari Brown Added (and enhanced) information from the Ramp Reservation User Guide. Added references to Transmission Service Reference Manual. Made clarifications to tags submitted for time changes.

    10/1/2015 Version 3.0

    Shari Brown Added change due to Implementation of the IS Integration into SWPP footprint.

    04/21/2016 Version 4.0

    Shari Brown Clarified Day Ahead Market timing requirements and noted new timelines effective 09/30 for OD 10/1. Made additional changes to accommodate IS integration and webSmartTag. Added ramp validations and Tagging Information Appendix.

  • Southwest Power Pool, Inc.

    Interchange Scheduling Reference Manual 2

    Table of Contents

    Revision History ...........................................................................................................................................1

    1 Introduction ......................................................................................................................................6

    1.1 Purpose of the Interchange Scheduling Reference Manual ...................................................6

    1.2 Related/Referenced Documents .............................................................................................6

    2 Scheduling Overview .......................................................................................................................7

    2.1 Interchange Scheduling ..........................................................................................................7

    2.2 Interchange Authority (IA) ....................................................................................................7 2.2.1 Scheduling Systems .................................................................................................................... 8

    2.3 Balancing Authority (BA)......................................................................................................8

    2.4 Transmission Service Provider (TP) ......................................................................................8

    2.5 Purchase and Selling Entity (PSE) .........................................................................................9

    2.6 Process Overview for Interchange Scheduling ......................................................................9

    2.7 SPP Balancing Authority Area and Neighboring Balancing Authorities ............................11

    3 Registration for SPP Interchange Scheduling ...............................................................................12

    3.1 NAESB Electric Industry Registry (EIR) ............................................................................12 3.1.1 SPP Market Registration .......................................................................................................... 12

    3.2 Commercial Model Changes................................................................................................12 3.2.1 Settlement Locations ................................................................................................................ 13 3.2.2 Asset Owners/Market Participant ............................................................................................. 14 3.2.3 PSE is mapped to a TC is mapped to a AO is mapped to an MP ............................................. 14

    4 Transmission Service for Interchange Scheduling .......................................................................16

    4.1 Transmission Losses for Interchange Transactions: ............................................................16

    4.2 Combining Transmission Service on Interchange Transactions ..........................................16

    4.3 Market Import Service (MIS) ..............................................................................................16

    5 Ramp Reservation for Interchange Scheduling ............................................................................17

    5.1 Ramp Capability ..................................................................................................................17

    5.2 Ramp Reservation Business Rules.......................................................................................17

    5.3 Ramp Reservation Validation ..............................................................................................18

    5.4 Ramp Reservation Deadlines ...............................................................................................18

    5.5 e-Tag Ramp Validation ........................................................................................................18

  • Southwest Power Pool, Inc.

    Interchange Scheduling Reference Manual 3

    5.5.1 Ramp Availability..................................................................................................................... 18 5.5.2 Ramp Start/Stop ........................................................................................................................ 19 5.5.3 Ramp Overlap ........................................................................................................................... 19

    5.6 Ramp Reservation System (RRS) ........................................................................................20

    5.7 Ramp Reservation (Submission) Display ............................................................................21

    5.8 Ramp Reservation Status .....................................................................................................23

    5.9 Ramp Availability ................................................................................................................24

    6 Tagging Interchange Transactions .................................................................................................26

    6.1 Electronic Tagging (e-Tag) ..................................................................................................26

    6.2 Tag Transaction Types .........................................................................................................26

    6.3 Interchange Schedule Types ................................................................................................27 6.3.1 Import ....................................................................................................................................... 27 6.3.2 Export ....................................................................................................................................... 27 6.3.3 Through .................................................................................................................................... 28

    6.4 Market Types .......................................................................................................................28 6.4.1 Day-Ahead Market ................................................................................................................... 28 6.4.2 Real Time Market (RTBM) ...................................................................................................... 29

    6.5 Integrated Marketplace Transaction Types ..........................................................................30 6.5.1 Fixed Interchange Transactions ................................................................................................ 30 6.5.2 Dispatchable Interchange Schedules ........................................................................................ 31 6.5.3 Up-to-TUC Interchange Schedules........................................................................................... 33

    6.6 Dynamic Interchange Schedules ..........................................................................................34 6.6.1 External Dynamic Resources (EDR) ........................................................................................ 34

    6.7 HVDC Ties ..........................................................................................................................35 6.7.1 HVDC Tie Inadvertent ............................................................................................................. 36

    7 Scheduling Interchange Transactions