IS-34 North Atlantic Beam – New Satellite for Mobility at 304.5°E

IS-34

Maps are for illustrative purposes only.

3

Maps are for illustrative purposes only – Initial Epic satellite deployment illustrated here.

IS-29e

IS-32e

IS-33e

Designed as an overlay to the existing Ku-band Network, Intelsat EpicNG

Capacity will Scale over Time, Offering Continuity, Growth, Resilience

IS-35e

4

Maps are for illustrative purposes only.

Intelsat Global C-band Coverage

5

*Not included in capital expenditures are IS-32e and Intelsat 38 as they are custom payloads being built on third-party satellites.

Programs in the concept phase are subject to change.

Intelsat EpicNG Roadmap: Launch Campaign Beginning in 2015

Accelerating in 2016

Satellite* Follows

Orbital

Location Launch Provider

Estimated

Launch Date

Estimated In-

Service Date

Intelsat 34 IS-805, G-11 304.5°E Arianespace Ariane 5 Launched 4Q15

Intelsat 31 New 95°W Proton 1Q16 2Q16

Intelsat 29e IS-1R, IS-805 310°E Arianespace Ariane 5 1Q16 Mid-2016

Intelsat 33e IS-904 60°E Arianespace Ariane 5 2H16 1H17

Intelsat 36 New 68.5°E Arianespace Ariane 5 2H16 1H17

Intelsat 35e IS-903 325.5°E SpaceX Falcon 9 2017 2018

Intelsat 37e 9-series Replacement TBD Arianespace Ariane 5 2017 2018

Traditional 9-series Replacement TBD Not Yet Assigned 2018 2019

Traditional 9-series Replacement TBD Not Yet Assigned 2018 2019

EpicNG class 9-series Replacement TBD Not Yet Assigned 2019 2020

EpicNG class 10-series Replacement TBD Not Yet Assigned 2019 2020

7

Commercial Shipping – Clear Usage and Growth Trends

23% 26%

58% 59%

0%

10%

20%

30%

40%

50%

60%

70%

Ship-to-Shore Shore-to-Ship

Anticipated increase in Data Traffic -

Ship Operators

Increase: 12 months Increase: 2-3 Yrs

Yes, 78%

No, 27%

Crew: Does the level of connectivity

influence which shipping company you

work for?

8

17%

34%

49%

0% 10% 20% 30% 40% 50% 60%

256 Kbit/second

512 Kbits/second

1 Mbps

Minimum Bandwidth Requirements for Acceptable Crew Internet Provision

Crew Internet Requirements – Is L-band Now Sufficient?