    INTRODUCTION

    Load shedding is a process in whicha suitable amount load is thrownoff in order to maintain system

    stability during over loadedcondition

    Generation- load unbalance problems

    Load shedding in industrial units

  • 8/14/2019 Inteligent Load ils

    3/18

    Problems of frequency decay

    Frequency is propotional to speed

    Gas turbines are sensitive to frequency

    Low frequency problem with thermal

    power plants Frequency decay affects quality of

    industrial products

    Frequency below 49.5Hz make s/munstable

    Is load shedding necessary

  • 8/14/2019 Inteligent Load ils

    4/18

  • 8/14/2019 Inteligent Load ils

    5/18

    Breaker interlock loadshedding

    Load sheddingbased on hard-wire signal

    &circuit-breakers Fast load shedding

    Load sheddingbased on worstcase scenario

    Only one stageload shedding

    Excessive loadshedding

    Modificationcostlier

  • 8/14/2019 Inteligent Load ils

    6/18

    Under frequency relay loadshedding

    Used to drop loadautomatically inaccordance withthe pre

    determinedschedule

    Fixed load reductionat fixed frequencylevel

    Upon reaching theset point &pre-specified timedelay the relaytrips load breakers

    Cycle repeats until

    Slow responsetime

    Incorrect orexcessive loadshedding

    Analysis knowledgeis lost

  • 8/14/2019 Inteligent Load ils

    7/18

    PLC based load shedding

    Load sheddingbased on Loadvsnum ofgeneratoronline orunder frequencydetection

    Shed a preset

    sequence ofload

    Use of distributedn/w via power

    managements/m

    Monitoring ofpower s/m islimited to portionof n/w

    s/m wide operatingcondition ismissing fromdecision makingprocess result inincorrect loadshedding

    Priority load list

  • 8/14/2019 Inteligent Load ils

    8/18

    INTELLIGENT LOADSHEDDING

    Requirements of ILS s/m1.Pre-disturbance operating conditions

    2.post-disturbance operatingconditions3.Nature and duration of disturbance

    4.s/m transient response to adisturbance

  • 8/14/2019 Inteligent Load ils

    9/18

    ILS block diagram

  • 8/14/2019 Inteligent Load ils

    10/18

    Functions of blocks

    Knowledgebase-possess s/m dynamicbehavior

    Advanced Monitoring

    Network Models Trigger List

    Load Shed Optimizer- computes optimal

    load shedding tables corresponding to system

    changes.

    Distributed Controls -utilize PLCs to

    rapidly execute the load shedding

  • 8/14/2019 Inteligent Load ils

    11/18

    , W ith th e a rch ite ctu re d e scrib e d a b o v e a nILS

    sch e m e p ro v id e s th e fo llo w in g b e n e fits:

    - ,Tim e v a ria n t lo a d sh e d d in g ta b le s w h ichre fle ct

    ,tru e sta tu s a n d lo a d in g co n d itio n s fo r th e

    .sh e d d a b le lo a d s

    O p tim a l co m b in a tio n o f sh e d d a b le lo a d s to.m a x im ize lo a d p re se rv a tio n

    (Fa st re sp o n se to d istu rb a n ce trig g e rs le ssthan

    ).1 0 0 m s in m o st case s

  • 8/14/2019 Inteligent Load ils

    12/18

    O n e lin e d ia g ra m o f o il re fin e ry

  • 8/14/2019 Inteligent Load ils

    13/18

    T h e in te rn a l e le ctrica l n e tw o rk su p p lie s a to ta llo a d

    ,o f a b o u t 4 5 M W a n d is con stitu te d b y th e:fo llo w in g

    S u b sta tio n in te rco n n e ctin g th e in te rn a le le ctrica l

    , -syste m to th e p o w er g rid b y tw o th re e w in d in g. / . ,tra n sfo rm e rs 3 4 5 1 3 8 kV ra te d a t 2 0 M V A

    .su p p ly in g th re e m a in sw itch b o a rd s

    In te rn a l d istrib u tio n syste m o p e ra tin g a t 6 0h e rtz

    ,o rg a n ize d in to m a in d istrib u tio n sw itch b o a rd s. . ,ra te d a t 1 3 8 kV a n d 4 1 6 kV w h ich su p p lies

    /la rg e M V m o to rs a n d o r d istrib u tio n fe e d e rs a sw e ll a s se ve ra l lo w v o lta g e d istrib u tio n

    .sw itch b o a rd s To ta lg e n e ra tio n o f 1 5 M W o b ta in e d fro m o n e

    ( ).g en erator G en set C T h e p la n t is n o rm a lly im p o rtin g 2 3 M W fro m th e

  • 8/14/2019 Inteligent Load ils

    14/18

    H a rd w a re co n fig u ra tio n o f P LC/b a se d S m

  • 8/14/2019 Inteligent Load ils

    15/18

    TABLE ISHEDDABLE LOAD PRIORITY LIST

    Load ShedPriority Load ID

    MW Shed- ( )1 Aux B Pump

    .1 20( % )MCC24AB 30 Load

    .2 55( )Aux A Pump

    .2 00( % )MCC24AB 30 Load

    .2 55#Desalter 1

    .4 25#2 Distillation Unit 1

    .3 40#Distillation Unit 3

    .2 55#Desalter 2

    .4 25( % )3 MCC24AB 40 Load

    .4 25#Distillation Unit 5

    .2 55 Total Load Shed

    .29 55

    Frequency response

  • 8/14/2019 Inteligent Load ils

    16/18

    ILS communication architecture

  • 8/14/2019 Inteligent Load ils

    17/18

    TABLE IILOADS SHED BY ILS SCHEMELoad Shed

    Priority Load ID MW Shed

    - ( )1 Aux B Pump.1 20( )MCC24AB LV Motors 1

    .2 55 ( )Aux A Pump.2 00( )MCC24AB LV Motors

    .2 55

    #Desalter 1.4 25 2 Distillation

    # .Unit 1 3 40 Distillation Unit

    # .3 2 55

    #3 Desalter 2

  • 8/14/2019 Inteligent Load ils

    18/18

    conclusion

    ILS is better than any of theconventional load shedding scheme