Intel Ireland Ltd.
Transcript of Intel Ireland Ltd.
Intel Ireland Ltd.
Annual
Environmental Report
2017
Prepared by EHS Department Intel Ireland Ltd. 22 March 2018
This Annual Environmental Report was generated using excel template documents provided by the Environmental Protection Agency. The report provides summary information on key environmental emissions
and management practices associated with Intel Ireland Ltd.'s Industrial Emissions Licence P0207-04.
Table of Contents
Facility Information 1
Emissions to Water/Wastewater 2
Groundwater/Contaminated Land 7
Bund/Tank/Pipeline Integrity Testing 53
Emissions to Air 56
Noise 63
Resource Usage/Energy Efficiency/Waste Reduction 67
Complaints and Incidents 70
Environmental Management Programme – Update for 2017 73
Environmental Management Programme – Plan for 2018 79
Environmental Liability Risk Assessment 83
Schedule D: Report on the assessment of the efficiency of use of raw materials in processes and the reduction in waste generated.
85
PRTR Proposed Parameters for 2018 88
PRTR 2017 90
2017
P0207-04
Date
Facility Information Summary
NACE Code 2611
Class/Classes of Activity Principal Activity:
13.2 The Manufacture of integrated circuits and printed circuit
boards.
Related Activities:
2.1 The operation of combustion installations with a rated
thermal input equal to or greater than 50 MegaWatt.
12.2.1 The surface treatment of products using organic solvents,
in particular for coating, cleaning, with a consumption capacity of
more than 200 tonnes per year.
Site Location Collinstown Industrial Park,
Leixlip, County Kildare, Ireland
AER Reporting Year
Licence Register Number
Name of site Intel Ireland Ltd.
National Grid Reference (6E, 6N) 298310E, 236940N
SignatureEnvironmental Health & Safety Manager
A description of the activities/processes at
the site for the reporting year. This should
include information such as production
increases or decreases on site, any
infrastructural changes, environmental
performance which was measured during
the reporting year and an overview of
compliance with your licence listing all
exceedances of licence limits (where
applicable) and what they relate to e.g. air,
water, noise.
Declaration:
All the data and information presented in this report has been checked and certified as being
accurate. The quality of the information is assured to meet licence requirements.
__________________________ 22/03/2018
There was an increase in manufacturing operations in 2017 from
2016. Small project related work occured at the site in 2017
which resulted in an increase in non-hazardous waste generation.
The site had no non compliances with its Industrial Emission
Licence P0207-04.
Intel Ireland Ltd. AER 2017 Page 1 of 106
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0207-04 Year 2017
Abbreviations: Chemical Oxygen Demand (COD), Total Organic Carbon (TOC), Acid Waste Neutralization System (AWN), Total Suspended Solids (TSS), Volatile Suspended Solids (VSS), Emission Limit Value (ELV), Limit of Quantification (LoQ),
Environmental Quality Standard (EQS).
2 Yes
Location
reference
Location relative to
site activities
PRTR Parameter Licenced
Parameter
Monitoring
date
ELV or trigger
level in licence
or any revision
thereof*
Licence
Compliance
criteria
Measured value Unit of
measurement
Compliant with
licence
Comments
SW1 onsite N/A pH Continuous ~6-9.3/10.6 N/A 7.66 pH Units N/A Action Limits
Agreed with the
EPA (changes from
winter to summer).
SW1 onsite N/A Flow Continuous N/A N/A 749.99 m3/day N/ASW1 onsite N/A COD Weekly N/A N/A 18.88 mg/L N/ASW1 onsite N/A Conductivity Weekly N/A N/A 647.8 µS/cm@25oC N/ASW1 onsite N/A Total Organic
Carbon (as C)
Weekly N/A N/A 5.23 mg/L N/A
SW1 onsite N/A Total Heavy
Metals
Biannually N/A N/A 15.79 µg/L N/A
*trigger values may be agreed by the Agency outside of licence conditions
Location
Reference
Date of inspection Source of
contamination
SW1 07/07/2017 site
SW1 08/07/2017 site
SW1 09/07/2017 site
3 No
4 External /Internal
Lab Quality
checklist
Assessment of
results checklist
Yes
Foam caught in oil booms at pond inlet. Source investigated N/A
Foam caught in oil booms at pond inlet. Source discovered to be gas boiler water pipe leaking
to storm drain. Storm drains were diverted to
containment tank until leak was repaired. Storm
drains were labelled to prevent reoccurrence.
Foam was contained at pond inlet booms
and was not observed at any other point
in the pond. Therefore there was no
environmental impact.
Comments
Foam caught in oil booms at pond inlet. Source investigated N/A
Licensed Emissions to water and /or wastewater(sewer)-periodic monitoring (non-continuous)Was there any result in breach of licence requirements? If yes please provide brief details in the comment
section of Table W3 below.
Additional information
Was all monitoring carried out in accordance with EPA guidance and
checklists for Quality of Aqueous Monitoring Data Reported to the
EPA? If no please detail what areas require improvement in additional
information box.
Was it a requirement of your licence to carry out visual inspections on any surface water
discharges or watercourses on or near your site? If yes please complete table W2 below
summarising only any evidence of contamination noted during visual inspections.
Table W1 Storm water monitoring
Table W2 Visual inspections-Please only enter details where contamination was observed.Description of contamination Corrective action
Additional information
1 Does your site have licensed emissions direct to surface water or direct to sewer? If yes please
complete table W2 and W3 below for the current reporting year and answer further questions. If
you do not have licenced emissions you only need to complete table W1 and or W2 for storm
water analysis and visual inspections.
Yes
Intel Ireland Ltd. AER 2017 Page 2 of 106
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0207-04 Year 2017
Table W3: Licensed Emissions to water and /or wastewater (sewer)-periodic monitoring (non-continuous)
Emission
reference no:
Emission released to Parameter/
SubstanceNote 1
Type of sample Frequency of
monitoring
Averaging
periodELV or trigger
values in licence or
any revision
therofNote 2
Licence Compliance criteria Measured value Unit of
measurement
Compliant with
licence
Method of analysis Procedural
reference source
Procedural
reference
standard number
Annual mass load
(kg)Comments
SE1 Wastewater/Sewer COD Equivalence composite Weekly Yearly 13,200 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
6,896 kg/day yes High temperature
combustion plus
conversion factor
APHA / AWWA
"Standard
Methods"
5310-B 2,516,953 Based upon test data
from monitoring of TOC
at the AWNs and the
application of a
conversion factor (3.04).
SE1 Wastewater/Sewer Inorganic Suspended
Solids
composite Weekly Yearly 2,700 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
134 kg/day yes In house calculation
(TSS - VSS)
N/A N/A 48,885
SE1 Wastewater/Sewer Suspended Solids composite Weekly Yearly 4,125 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
403 kg/day yes Gravimetric analysis APHA / AWWA
"Standard
Methods"
2540D 147,155
SE1 Wastewater/Sewer Total Dissolved Solids composite Weekly Yearly 60,570 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
34,599 kg/day yes Gravimetric analysis APHA / AWWA
"Standard
Methods"
2540C 12,628,535
SE1 Wastewater/Sewer Total Nitrogen composite Weekly Yearly 990 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
588 kg/day yes Total Nitrogen
Analyser
I.S. (Irish
Standard)
IS EN
12260:2003
214,456 Based upon test data
from monitoring at the
AWNs which is more
representative than SE1.
SE1 Wastewater/Sewer Total Phosphorus composite Weekly Yearly 140 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
10.66 kg/day yes Digestion +
Spectrophotometry
APHA / AWWA
"Standard
Methods"
4500-PD and
Hach method
8190
3,892.2
SE1 Wastewater/Sewer Fluorides (as total F) composite Weekly Yearly 160 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
45.15 kg/day yes Ion Chromatography APHA / AWWA
"Standard
Methods"
4110B 16,478
SE1 Wastewater/Sewer Cyanides (as total CN) composite Weekly Yearly 0.1 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.01 mg/L yes Spectrophotometry
(Colorimetry)
APHA / AWWA
"Standard
Methods"
4500-CN--E
SE1 Wastewater/Sewer Cyanides (as total CN) composite Weekly Yearly 1.35 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.003 kg/day yes Spectrophotometry
(Colorimetry)
APHA / AWWA
"Standard
Methods"
4500-CN--E 1.20 Some of the
measurements for
Cyanide were less than
the limit of quantification
(LoQ) and in these
instances the value used
for averaging was half the
LoQ.
SE1 Wastewater/Sewer Arsenic and
compounds (as As)
composite Weekly Yearly 0.1 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.003 mg/L yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
SE1 Wastewater/Sewer Arsenic and
compounds (as As)
composite Weekly Yearly 1.35 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.004 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
1.54 Some of the
measurements for arsenic
were less than the limit of
quantification (LoQ) and
in these instances the
value used for averaging
was half the LoQ.
Intel Ireland Ltd. AER 2017 Page 3 of 106
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0207-04 Year 2017
Emission
reference no:
Emission released to Parameter/
SubstanceNote 1
Type of sample Frequency of
monitoring
Averaging
period
ELV or trigger
values in licence or
any revision
therofNote 2
Licence Compliance criteria Measured value Unit of
measurement
Compliant with
licence
Method of analysis Procedural
reference source
Procedural
reference
standard number
Annual mass load
(kg)
Comments
SE1 Wastewater/Sewer Copper and
compounds (as Cu)
composite Weekly Yearly 0.3 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.036 mg/L yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
SE1 Wastewater/Sewer Copper and
compounds (as Cu)
composite Weekly Yearly 4.05 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.422 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
154.2
SE1 Wastewater/Sewer Chromium and
compounds (as Cr)
composite Weekly Yearly 0.1 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.003 mg/L yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
SE1 Wastewater/Sewer Chromium and
compounds (as Cr)
composite Weekly Yearly 1.35 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.004 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
1.64 Some of the
measurements for
chromium were less than
the limit of quantification
(LoQ) and in these
instances the value used
for averaging was half the
LoQ.
SE1 Wastewater/Sewer Nickel and compounds
(as Ni)
composite Weekly Yearly 0.2 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.005 mg/L yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
SE1 Wastewater/Sewer Nickel and compounds
(as Ni)
composite Weekly Yearly 2.7 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.076 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
27.85
SE1 Wastewater/Sewer Tin composite Weekly Yearly 0.4 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.004 mg/L yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
SE1 Wastewater/Sewer Tin composite Weekly Yearly 5.4 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.031 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
11.18 Some of the
measurements for tin
were less than the limit of
quantification (LoQ) and
in these instances the
value used for averaging
was half the LoQ.
Intel Ireland Ltd. AER 2017 Page 4 of 106
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0207-04 Year 2017
Emission
reference no:
Emission released to Parameter/
SubstanceNote 1
Type of sample Frequency of
monitoring
Averaging
period
ELV or trigger
values in licence or
any revision
therofNote 2
Licence Compliance criteria Measured value Unit of
measurement
Compliant with
licence
Method of analysis Procedural
reference source
Procedural
reference
standard number
Annual mass load
(kg)
Comments
SE1 Wastewater/Sewer Lead and compounds
(as Pb)
composite Weekly Yearly 0.4 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.001 mg/L yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
SE1 Wastewater/Sewer Lead and compounds
(as Pb)
composite Weekly Yearly 1.6 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.0004 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
0.15 Some of the
measurements for lead
were less than the limit of
quantification (LoQ) and
in these instances the
value used for averaging
was half the LoQ.
SE1 Wastewater/Sewer Total heavy metals composite Weekly Yearly 13.5 All results < 1.2 times ELV,
plus 8 from ten results must
be < ELV
0.64 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
233.3
SE1 Wastewater/Sewer Ammonia (as N) composite Weekly Yearly N/A N/A 127 kg/day yes UV/Vis APHA / AWWA
"Standard
Methods"
4500- NH3 F 46,333
SE1 Wastewater/Sewer Cobalt composite Weekly Yearly N/A N/A 0.0000 kg/day yes ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
US EPA 200.8
(supplement 1
rev. 5.4 May
1994)
0.00 The total annual mass of
Cobalt in the site's
wastewater emissions
was equal to the total
annual mass in the
incoming water so net
emissions are zero.
SE1 Wastewater/Sewer Nitrate (as N) composite Weekly Yearly N/A N/A 51.49 kg/day yes Ion Chromatography APHA / AWWA
"Standard
Methods"
4110B 18,795
SE1 Wastewater/Sewer Sulphate composite Weekly Yearly N/A N/A 21,884 kg/day yes Ion Chromatography APHA / AWWA
"Standard
Methods"
4110B 7,987,610
Note 1: Volumetric flow shall be included as a reportable parameter
Note 2: Where Emission Limit Values (ELV) do not apply to your licence please compare results against EQS for Surface water or relevant receptor quality standards
Intel Ireland Ltd. AER 2017 Page 5 of 106
AER Monitoring returns summary template-WATER/WASTEWATER(SEWER) Lic No: P0207-04 Year 2017
5 Yes
6 No
7 Yes
8 No
Table W4: Summary of average emissions -continuous monitoring
Emission
reference no:
Emission released to Parameter/ Substance ELV or trigger
values in licence or
any revision
thereof
Averaging Period Compliance
Criteria
Units of
measurement
Annual Emission for current
reporting year (kg)
% change +/- from
previous reporting
year
Monitoring
Equipment
downtime (hours)
Number of ELV
exceedences in
reporting year
SE1 Wastewater/Sewer volumetric flow 23000 Yearly No flow value
shall exceed the
specific limit
m3/day 13,981 4.16 0 0
SE1 Wastewater/Sewer volumetric flow 1,150 Yearly No flow value
shall exceed the
specific limit
m3/hr 583 4.16 0 0
SE1 Wastewater/Sewer volumetric flow 320 Yearly No flow value
shall exceed the
specific limit
l/sec 162 4.16 0 0
SE1 Wastewater/Sewer pH 6-9.5 Yearly No pH value
shall deviate
from the
specified range
pH units 7.68 0.20 0 0
SE1 Wastewater/Sewer temperature 30 Yearly No temperature
value shall
exceed the limit
value
degrees C 26.39 1.56 0 0
Note 1: Volumetric flow shall be included as a reportable parameter.
Table W5: Abatement system bypass reporting tableDate Duration (hours) Location Resultant
emissions
Reason for
bypass
Corrective
action*
Was a report
submitted to the
EPA?
When was this report submitted?
N/A N/A N/A N/A N/A N/A N/A N/A
*Measures taken or proposed to reduce or limit bypass frequency
Did continuous monitoring equipment experience downtime? If yes please record downtime in table W4
below
Do you have a proactive service contract for each piece of continuous monitoring equipment on site?
Did abatement system bypass occur during the reporting year? If yes please complete table W5 below
Comments
Continuous monitoring Additional Information
Does your site carry out continuous emissions to water/sewer monitoring?
If yes please summarise your continuous monitoring data below in Table W4 and compare it to its
relevant Emission Limit Value (ELV)
Intel Ireland Ltd. AER 2017 Page 6 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
Abbreviations: KCC: Kildare County Council, GTV; Groundwater Threshold Value, IGV: Interim Guideline Value, MW: Monitoring Well
Comments
1 yes
2 no
3 no
4 Groundwater
monitoring template
yes
5 yes
6
7 N/A
8 yes
9 yes
10 yes
11 yes
12 no
yes
Please specify the proposed time frame for the remediation strategy.
Is there a licence condition to carry out/update ELRA for the site?
Is there evidence that contamination is migrating offsite?
Has any type of risk assesment been carried out for the site?
Is the contamination related to operations at the facility (either current and/or historic)
Have potential receptors been identified on and off site?
Has a Conceptual Site Model been developed for the site?
Please provide an interpretation of groundwater monitoring data in the
interpretation box below or if you require additional space please
include a groundwater/contaminated land monitoring results
Are you required to carry out groundwater monitoring as part of your licence requirements?
Are you required to carry out soil monitoring as part of your licence requirements?
Have actions been taken to address contamination issues?If yes please summarise
remediation strategies proposed/undertaken for the site
Do monitoring results show that groundwater generic assessment
criteria such as GTVs or IGVs are exceeded or is there an upward trend
in results for a substance? If yes, please complete the Groundwater
Monitoring Guideline Template Report (link in cell G8) and submit
separately through ALDER as a licensee return AND answer questions 5-
12 below.
Do you extract groundwater for use on site? If yes please specify use in comment section
Some wells were found to be in exceedance of the GTVs for the following parameters: conductivity, chloride,
sulphate. Chloride and conductivity have been detected in concentrations above the GTVs in both up-gradient
and down-gradient wells. This suggests that the source of the contamination is an up-gradient offsite source and
the levels of conductivity and chloride tend to be higher in upgradient wells. This was the subject of a report
commissioned by Intel in 2009. The conclusion of this report was that elevated levels were due to an off-site
leaking sewer south of Intel owned by KCC. Monthly monitoring was conducted on upgradient wells in 2017 and
it was determined that the levels of these parameters remain constant throughout the year supporting a
consistent offsite source.
Sulphate levels were found at higher concentrations in downgradient wells than in upgradient wells which
suggests a site source. However, the likely source of sulphates onsite, the underground process water pipes and
Effluent Balance Tank, are all subject to integrity testing every three years and to date no leak has been found.
Also, the only downgradient well that showed an upward trend in Sulphates was MW11 and the upward trend is
very slight and insignificiant compared to historical results.
Lead and Arsenic were detected above the GTV in a number of wells in 2017. As 2014 was the first year that
metals were analysed since 2004, there is insufficient data available for expected background levels nor is there
5 year trend data available. However there was no upward trend for any heavy metal in the 4 year data available
and there was no increase in metals. when compared to historical data from 1998 - 2004.
Seven statistically significant upward trends are identified in the annual averages of all indicator parameters in all
wells over the last five years. None of these trends are considered significant when compared to the overall
trends/range of historic variation of these parameters in these monitoring wells.
Testing for hydrocarbons in groundwater is not required under the conditions of the IE licence however it is
carried out in specific wells due to a historic spill of diesel in 1997. Hydrocarbons were detected in the
groundwater at MW18 which was installed at the location of the diesel spill. A number of studies have been
done on this contamination (RSK Group 2010 and AWN Consulting 2014) and it was determined that the
contamination was localised to the area immediately surrounding MW18 as no contamination was detected in
downstream wells.
The TMS report mentioned above was sent to KCC in May 2010 as requested by the EPA but we have received no
reply to date.
In 2015, AWN Consulting developed a remediation strategy for the hydrocarbon contamination at MW18 which
involved injection of a bioremediator a number of times over set intervals. A course of groundwater monitoring
in the area showed that this failed to fully remediate the contamination but again showed that the
contamination was confined to the area immediately surrounding MW18 and was not migrating downgradient.
Monitoring for hydrocarbons will continue in this area.
Intel Ireland Ltd. AER 2017 Page 7 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
Table 1: Upgradient Groundwater monitoring resultsDate of sampling Sample
location
reference
Parameter/
Substance
Methodology Monitoring
frequency
Maximum
Concentration++
Average
Concentration+unit GTV's* IGV Upward trend in
pollutant
concentration
over last 5 years
of monitoring
data
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 pH pH Electrode Biannual 7.15 7.115 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Conductivity Conductivity Meter Biannual 1306 1289.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 COD Microdigestion,
colorimetry
Biannual 8 5.25 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Nitrate Spectrophotometry Biannual 2.68 2.165 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Total Ammonia Spectrophotometry Biannual 0.010 0.010 mg/l as N N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Total Nitrogen Addition of TKN +
TON
Biannual 2.1 1.85 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Chloride Titration Biannual 200 198.5 mg/l 24-187.5 30 no
Intel Ireland Ltd. AER 2017 Page 8 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Fluoride Ion Selective
Electrode
Biannual 0.4 0.325 mg/l N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 39.7 38.55 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 2.78 2.38 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Orthophosphate Spectrophotometry Biannual 0.3 0.18 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Sulphate Turbidimetry Biannual 109 98.4 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.002 0.0015 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
Intel Ireland Ltd. AER 2017 Page 9 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.008 0.0065 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.011 0.00725 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW1 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 pH pH Electrode Biannual 7.1 7.085 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Conductivity Conductivity Meter Biannual 902 885 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 COD Microdigestion,
colorimetry
Biannual 2.5 2.5 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Nitrate Spectrophotometry Biannual 2.47 1.485 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Total Ammonia Spectrophotometry Biannual 0.030 0.020 mg/l as NH4 N/A 0.15 no
Intel Ireland Ltd. AER 2017 Page 10 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Total Nitrogen Addition of TKN +
TON
Biannual 2.1 1.7 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Chloride Titration Biannual 86 71.35 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Fluoride Ion Selective
Electrode
Biannual 0.34 0.335 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 13 12.8 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 5.17 3.845 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Sulphate Turbidimetry Biannual 40.4 38.8 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
Intel Ireland Ltd. AER 2017 Page 11 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0015 0.0015 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.00625 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW7 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.002 0.00165 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 pH pH Electrode Biannual 7.21 7.175 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Conductivity Conductivity Meter Biannual 831 824.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 COD Microdigestion,
colorimetry
Biannual 10 8.5 mg/l O2 N/A N/A no
Intel Ireland Ltd. AER 2017 Page 12 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Nitrate Spectrophotometry Biannual 1.32 0.91 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Total Ammonia Spectrophotometry Biannual 0.050 0.030 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Total Nitrogen Addition of TKN +
TON
Biannual 1.3 1.05 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Chloride Titration Biannual 48 41 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Fluoride Ion Selective
Electrode
Biannual 0.17 0.14 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 14.2 14.15 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 6.14 4.305 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
Intel Ireland Ltd. AER 2017 Page 13 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Sulphate Turbidimetry Biannual 56.5 52.8 mg/l N/A 200 yes
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.0025 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.019 0.0175 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.012 0.009 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0035 0.0035 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW8 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0074 0.006 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 pH pH Electrode Biannual 7.53 7.47 pH Units N/A ≥ 6.5 and ≤ 9.5 no
Intel Ireland Ltd. AER 2017 Page 14 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Conductivity Conductivity Meter Biannual 703 685 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 COD Microdigestion,
colorimetry
Biannual 9 5.75 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Nitrate Spectrophotometry Biannual 3 1.74 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Total Ammonia Spectrophotometry Biannual 0.060 0.035 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Total Nitrogen Addition of TKN +
TON
Biannual 2.2 1.8 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Chloride Titration Biannual 22.9 19.45 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Fluoride Ion Selective
Electrode
Biannual 0.22 0.205 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 10.5 9.625 mg/l 150 150 no
Intel Ireland Ltd. AER 2017 Page 15 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 10.5 9.95 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Sulphate Turbidimetry Biannual 39.4 35.7 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0015 0.0015 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0035 0.0035 mg/l N/A N/A no
Intel Ireland Ltd. AER 2017 Page 16 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW9 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0017 0.0015 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 pH pH Electrode Biannual 6.89 6.79 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Conductivity Conductivity Meter Biannual 1341 1308.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 COD Microdigestion,
colorimetry
Biannual 9 5.75 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Nitrate Spectrophotometry Biannual 1.28 0.89 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Total Ammonia Spectrophotometry Biannual 0.050 0.030 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Total Nitrogen Addition of TKN +
TON
Biannual 1.8 1.8 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Chloride Titration Biannual 104 102.5 mg/l Cl 24-187.5 30 no
Intel Ireland Ltd. AER 2017 Page 17 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Fluoride Ion Selective
Electrode
Biannual 0.2 0.2 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 37.2 34.45 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 4.36 4.3 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Orthophosphate Spectrophotometry Biannual 0.3 0.205 mg/l P 0.035 0.03 no
Intel Ireland Ltd. AER 2017 Page 18 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Sulphate Turbidimetry Biannual 174 172.5 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.002 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.012 0.00825 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.007 0.005 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.021 0.017 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.00625 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW13 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0038 0.00265 mg/l 0.0075 0.01 no
.+ where average indicates arithmetic mean
.++ maximum concentration indicates the maximum measured concentration from all monitoring results produced during the reporting year
Intel Ireland Ltd. AER 2017 Page 19 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
Table 2: Downgradient Groundwater monitoring resultsDate of sampling Sample
location
reference
Parameter/
Substance
Methodology Monitoring
frequencyMaximum Concentration Average Concentrationunit GTV's* IGV Upward trend in
yearly average
pollutant
concentration
over last 5 years
of monitoring
data
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 pH pH Electrode Biannual 7.06 7.025 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Conductivity Conductivity Meter Biannual 687 675 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 COD Microdigestion,
colorimetry
Biannual 13 9 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Nitrate Spectrophotometry Biannual 2.22 1.36 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Total Ammonia Spectrophotometry Biannual 0.050 0.030 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Total Nitrogen Addition of TKN +
TON
Biannual 1.5 1.5 mg/l N N/A N/A no
Intel Ireland Ltd. AER 2017 Page 20 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Chloride Titration Biannual 37 36.25 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Fluoride Ion Selective
Electrode
Biannual 0.41 0.395 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 14.3 14.25 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 1.8 1.495 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Orthophosphate Spectrophotometry Biannual 0.3 0.205 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Sulphate Turbidimetry Biannual 74.6 63.4 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.002 0.0015 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
Intel Ireland Ltd. AER 2017 Page 21 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.006 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.031 0.0215 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0035 0.0035 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW2 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0097 0.0066 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 pH pH Electrode Biannual 7.11 7.085 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Conductivity Conductivity Meter Biannual 821 784.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 COD Microdigestion,
colorimetry
Biannual 7 4.75 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Nitrate Spectrophotometry Biannual 0.78 0.64 mg/l NO3 37.5 25 no
Intel Ireland Ltd. AER 2017 Page 22 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Total Ammonia Spectrophotometry Biannual 0.010 0.010 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Total Nitrogen Addition of TKN +
TON
Biannual 1.4 1.1 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Chloride Titration Biannual 38 34.75 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Fluoride Ion Selective
Electrode
Biannual 0.3 0.255 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 11.6 11.35 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 1.72 1.67 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Orthophosphate Spectrophotometry Biannual 0.3 0.16 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Sulphate Colorimetry Biannual 69.3 62 mg/l N/A 200 no
Intel Ireland Ltd. AER 2017 Page 23 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.00525 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.00625 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW3 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 pH pH Electrode Biannual 7.11 7.105 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Conductivity Conductivity Meter Biannual 1408 1390.5 uS/cm 800-1875 1000 no
Intel Ireland Ltd. AER 2017 Page 24 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 COD Microdigestion,
colorimetry
Biannual 6 4.25 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Nitrate Spectrophotometry Biannual 17.07 11.085 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Total Ammonia Spectrophotometry Biannual 0.040 0.025 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Total Nitrogen Addition of TKN +
TON
Biannual 5.4 3.8 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Chloride Titration Biannual 71.4 61.2 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Fluoride Ion Selective
Electrode
Biannual 0.36 0.32 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 17.8 17.35 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 5.93 5.175 mg/l N/A 5 yes
Intel Ireland Ltd. AER 2017 Page 25 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Orthophosphate Spectrophotometry Biannual 0.3 0.2 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Sulphate Colorimetry Biannual 473 397 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.012 0.0105 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.012 0.00775 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW4 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0015 0.001 mg/l 0.0075 0.01 no
Intel Ireland Ltd. AER 2017 Page 26 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 pH pH Electrode Biannual 7.4 7.315 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Conductivity Conductivity Meter Biannual 927 914 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 COD Microdigestion,
colorimetry
Biannual 25 15.5 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Nitrate Spectrophotometry Biannual 1.04 0.63 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Total Ammonia Spectrophotometry Biannual 0.155 0.088 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Total Nitrogen Addition of TKN +
TON
Biannual 2 1.9 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Chloride Titration Biannual 44.4 44.05 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Fluoride Ion Selective
Electrode
Biannual 0.85 0.765 mg/l F N/A 1 no
Intel Ireland Ltd. AER 2017 Page 27 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 18.9 18.9 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 5.57 5.005 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Sulphate Colorimetry Biannual 165 164.5 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.014 0.0085 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.008 mg/l N/A 0.02 no
Intel Ireland Ltd. AER 2017 Page 28 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.014 0.012 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW5 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 pH pH Electrode Biannual 7.13 7.1 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Conductivity Conductivity Meter Biannual 817 814.5 uS/cm 800-1875 1000 yes
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 COD Microdigestion,
colorimetry
Biannual 2.5 2.5 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Nitrate Spectrophotometry Biannual 1.03 0.765 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Total Ammonia Spectrophotometry Biannual 1.1 0.555 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Total Nitrogen Addition of TKN +
TON
Biannual 1.8 1.75 mg/l N N/A N/A no
Intel Ireland Ltd. AER 2017 Page 29 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Chloride Titration Biannual 49.5 42 mg/l Cl 24-187.5 30 yes
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Fluoride Ion Selective
Electrode
Biannual 1.09 0.655 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 13.3 12.25 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 1.93 1.85 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Sulphate Colorimetry Biannual 64.7 62.7 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
Intel Ireland Ltd. AER 2017 Page 30 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.005 0.004 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.008 0.00575 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW10 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0028 0.00165 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 pH pH Electrode Biannual 7.21 7.175 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Conductivity Conductivity Meter Biannual 972 961 uS/cm 800-1875 1000 yes
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 COD Microdigestion,
colorimetry
Biannual 2.5 2.5 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Nitrate Spectrophotometry Biannual 1.29 1.265 mg/l NO3 37.5 25 no
Intel Ireland Ltd. AER 2017 Page 31 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Total Ammonia Spectrophotometry Biannual 0.010 0.010 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Total Nitrogen Addition of TKN +
TON
Biannual 2.3 1.65 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Chloride Titration Biannual 110 80.15 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Fluoride Ion Selective
Electrode
Biannual 0.22 0.21 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 22.1 19.2 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 3.63 2.805 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Sulphate Colorimetry Biannual 125 108.3 mg/l N/A 200 yes
Intel Ireland Ltd. AER 2017 Page 32 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.012 0.00825 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.01 0.00575 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.01 0.00675 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW11 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 pH pH Electrode Biannual 7.18 7.11 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Conductivity Conductivity Meter Biannual 772 756 uS/cm 800-1875 1000 no
Intel Ireland Ltd. AER 2017 Page 33 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 COD Microdigestion,
colorimetry
Biannual 2.5 2.5 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Nitrate Spectrophotometry Biannual 0.5 0.375 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Total Ammonia Spectrophotometry Biannual 1.130 0.570 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Total Nitrogen Addition of TKN +
TON
Biannual 2 1.4 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Chloride Titration Biannual 33 31.55 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Fluoride Ion Selective
Electrode
Biannual 0.4 0.395 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 12.7 12.35 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 2.9 2.815 mg/l N/A 5 no
Intel Ireland Ltd. AER 2017 Page 34 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Orthophosphate Spectrophotometry Biannual 0.36 0.33 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Sulphate Colorimetry Biannual 47.7 47.65 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.007 0.005 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.005 0.00325 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.00625 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW12 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
Intel Ireland Ltd. AER 2017 Page 35 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A pH pH Electrode Biannual 7.25 7.205 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Conductivity Conductivity Meter Biannual 748 744.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A COD Microdigestion,
colorimetry
Biannual 9 5.75 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Nitrate Spectrophotometry Biannual 1.08 0.79 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Total Ammonia Spectrophotometry Biannual 0.070 0.040 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Total Nitrogen Addition of TKN +
TON
Biannual 1.7 1.35 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Chloride Titration Biannual 96.6 75.3 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Fluoride Ion Selective
Electrode
Biannual 0.21 0.205 mg/l F N/A 1 no
Intel Ireland Ltd. AER 2017 Page 36 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 37.7 31.55 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 1.73 1.63 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Orthophosphate Spectrophotometry Biannual 0.3 0.195 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Sulphate Colorimetry Biannual 49 46.25 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.004 0.00275 mg/l N/A 0.02 no
Intel Ireland Ltd. AER 2017 Page 37 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0035 0.0035 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW14A Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 pH pH Electrode Biannual 6.89 6.845 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Conductivity Conductivity Meter Biannual 1602 1390.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 COD Microdigestion,
colorimetry
Biannual 8 7 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Nitrate Spectrophotometry Biannual 0.82 0.66 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Total Ammonia Spectrophotometry Biannual 0.010 0.010 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Total Nitrogen Addition of TKN +
TON
Biannual 1.5 1.4 mg/l N N/A N/A no
Intel Ireland Ltd. AER 2017 Page 38 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Chloride Titration Biannual 51 47.9 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Fluoride Ion Selective
Electrode
Biannual 0.18 0.175 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 19 18.7 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 2.55 2.39 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Orthophosphate Spectrophotometry Biannual 0.3 0.195 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Sulphate Colorimetry Biannual 241 237.5 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
Intel Ireland Ltd. AER 2017 Page 39 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.005 0.004 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.007 0.00525 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW15 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 pH pH Electrode Biannual 6.91 6.895 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Conductivity Conductivity Meter Biannual 1586 1503.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 COD Microdigestion,
colorimetry
Biannual 29 15.75 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Nitrate Spectrophotometry Biannual 18.5 15.3 mg/l NO3 37.5 25 yes
Intel Ireland Ltd. AER 2017 Page 40 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Total Ammonia Spectrophotometry Biannual 0.010 0.010 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Total Nitrogen Addition of TKN +
TON
Biannual 6 5.15 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Chloride Titration Biannual 98.5 87.7 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Fluoride Ion Selective
Electrode
Biannual 0.4 0.395 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 39.4 36.95 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 30.5 19.315 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Orthophosphate Spectrophotometry Biannual 0.3 0.16 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Sulphate Colorimetry Biannual 515 402 mg/l N/A 200 no
Intel Ireland Ltd. AER 2017 Page 41 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.013 0.008 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.034 0.01925 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.023 0.0165 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.135 0.079 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.015 0.00925 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW16 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.007 0.0044 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 pH pH Electrode Biannual 7.21 7.165 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Conductivity Conductivity Meter Biannual 1108 1080 uS/cm 800-1875 1000 no
Intel Ireland Ltd. AER 2017 Page 42 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 COD Microdigestion,
colorimetry
Biannual 2.5 2.5 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Nitrate Spectrophotometry Biannual 0.65 0.575 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Total Ammonia Spectrophotometry Biannual 0.070 0.040 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Total Nitrogen Addition of TKN +
TON
Biannual 0.8 0.575 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Chloride Titration Biannual 38 35.75 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Fluoride Ion Selective
Electrode
Biannual 0.32 0.31 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 16.3 16.05 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 3.28 3.165 mg/l N/A 5 no
Intel Ireland Ltd. AER 2017 Page 43 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Orthophosphate Spectrophotometry Biannual 0.3 0.16 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Sulphate Colorimetry Biannual 291 274.5 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.002 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.014 0.0095 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0035 0.0035 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW17 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0015 0.00125 mg/l 0.0075 0.01 no
Intel Ireland Ltd. AER 2017 Page 44 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 pH pH Electrode Biannual 7.03 7.02 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Conductivity Conductivity Meter Biannual 602 529.5 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 COD Microdigestion,
colorimetry
Biannual 76 40.5 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Nitrate Spectrophotometry Biannual 8.27 5.71 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Total Ammonia Spectrophotometry Biannual 0.010 0.010 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Total Nitrogen Addition of TKN +
TON
Biannual 3.2 2.9 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Chloride Titration Biannual 46 25.2 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Fluoride Ion Selective
Electrode
Biannual 0.45 0.37 mg/l F N/A 1 no
Intel Ireland Ltd. AER 2017 Page 45 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 6.27 4.855 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 11.9 8.17 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Orthophosphate Spectrophotometry Biannual 0.3 0.21 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Sulphate Colorimetry Biannual 30.6 24.7 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.009 0.0065 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.01 0.00725 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.01 0.007 mg/l N/A 0.02 no
Intel Ireland Ltd. AER 2017 Page 46 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0035 0.0035 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW18 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0013 0.0009 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 pH pH Electrode Biannual 6.97 6.935 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Conductivity Conductivity Meter Biannual 1002 986 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 COD Microdigestion,
colorimetry
Biannual 7 4.75 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Nitrate Spectrophotometry Biannual 8.67 5.78 mg/l NO3 37.5 25 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Total Ammonia Spectrophotometry Biannual 0.010 0.010 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Total Nitrogen Addition of TKN +
TON
Biannual 4.2 3.35 mg/l N N/A N/A no
Intel Ireland Ltd. AER 2017 Page 47 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Chloride Titration Biannual 79 76.95 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Fluoride Ion Selective
Electrode
Biannual 0.28 0.275 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 20.1 19.9 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 5.16 4.61 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Sulphate Colorimetry Biannual 129 114.15 mg/l N/A 200 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.01 0.00725 mg/l 1.5 0.03 no
Intel Ireland Ltd. AER 2017 Page 48 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.076 0.045 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.014 0.00875 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW19 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0082 0.00435 mg/l 0.0075 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 pH pH Electrode Biannual 7.18 7.14 pH Units N/A ≥ 6.5 and ≤ 9.5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Conductivity Conductivity Meter Biannual 792 780 uS/cm 800-1875 1000 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 COD Microdigestion,
colorimetry
Biannual 9 5.75 mg/l O2 N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Nitrate Spectrophotometry Biannual 9.94 6.8 mg/l NO3 37.5 25 no
Intel Ireland Ltd. AER 2017 Page 49 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Total Ammonia Spectrophotometry Biannual 0.050 0.030 mg/l as NH4 N/A 0.15 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Total Nitrogen Addition of TKN +
TON
Biannual 4.5 4.1 mg/l N N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Chloride Titration Biannual 34 31.3 mg/l Cl 24-187.5 30 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Fluoride Ion Selective
Electrode
Biannual 0.16 0.155 mg/l F N/A 1 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Sodium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 15.2 15.15 mg/l 150 150 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Potassium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 1.48 1.295 mg/l N/A 5 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Orthophosphate Spectrophotometry Biannual 0.3 0.155 mg/l P 0.035 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Sulphate Colorimetry Biannual 38.1 37.45 mg/l N/A 200 no
Intel Ireland Ltd. AER 2017 Page 50 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Chromium ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.001 0.001 mg/l 0.0375 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Copper ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0045 0.0045 mg/l 1.5 0.03 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Lead ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.003 mg/l 0.01875 0.01 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Nickel ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.003 0.00225 mg/l N/A 0.02 no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Tin ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0035 0.0035 mg/l N/A N/A no
13th February 2017
to
16th February 2017
and
14th August 2017
to
15th August 2017
MW20 Arsenic ICP / ICPMS
(Inductively Coupled
Plasma - Mass
Spectrometry)
Biannual 0.0005 0.0005 mg/l 0.0075 0.01 no
Surface
water EQS
Groundwater
regulations
GTV's
Drinking water
(private supply)
standards
Groundwater monitoring template*please note exceedance of generic assessment criteria (GAC) such as a Groundwater Threshold Value (GTV) or an Interim Guideline Value (IGV) or an upward trend in results for a substance
indicates that further interpretation of monitoring results is required. In addition to completing the above table, please complete the Groundwater Monitoring Guideline Template Report at the
link provided and submit separately through ALDER as a licensee return or as otherwise instructed by the EPA.
**Depending on location of the site and proximity to other sensitive receptors alternative Receptor based Water Quality standards should be used in addition to the GTV e.g. if the site is close to
surface water compare to Surface Water Environmental Quality Standards (SWEQS), If the site is close to a drinking water supply compare results to the Drinking Water Standards (DWS)
More information on the use of soil and groundwater standards/ generic assessment criteria (GAC) and
risk assessment tools is available in the EPA published guidance (see the link in G31)Guidance on the Management of Contaminated Land and Groundwater at EPA Licensed Sites (EPA 2013).
Intel Ireland Ltd. AER 2017 Page 51 of 106
Groundwater/Soil monitoring template Lic No: P0207-04 Year 2017
Table 3: Soil resultsDate of sampling Sample
location
reference
Parameter/
Substance
Methodology Monitoring
frequency
Maximum
Concentration
Average
Concentration
unit
N/A N/A N/A N/A N/A N/A N/A N/A
Where additional detail is required please enter it here in 200 words or less.
Intel Ireland Ltd. AER 2017 Page 52 of 106
Bund/Pipeline testing template Lic No: P0207-04 Year: 2017
Bund testing Additional information
1 Yes
2 Please provide integrity testing frequency period 3 years
3 Yes
4 How many bunds are on site? 106
5 How many of these bunds have been tested within the required test schedule? 106
6 How many mobile bunds are on site? 93
7 Are the mobile bunds included in the bund test schedule? Yes
8 How many of these mobile bunds have been tested within the required test schedule? 93
9 15 Sumps in this case is taken to mean sumps
that are not part of a bund e.g. chemical
offload sumps.
10 15
Please list any sump integrity failures in table B1
11 Yes There are some sumps on-site that are used
to contain chemical offloads which do not
have high level liquid alarms. These sumps are
open to the storm water system unless there
is a chemical transfer occuring in which case
they are closed.
12 Yes All failsafe systems are subject to a
maintenance and testing programme with the
exception of the effluent balance tank which
has two liquid levels sensors with a
differential alarm which triggers
maintenance.
13 Is the Fire Water Retention Pond included in your integrity test programme? Yes
Bund/Containment
structure ID
Type Specify Other type Product containment Actual capacity Capacity required* Type of integrity test Other test type Test date Integrity reports
maintained on
site?
Results of test Integrity test failure explanation
<50 words
Corrective action taken Scheduled date for
retest
Results of
retest(if in
current
reporting year)
Bund no. 32 general purpose
concrete/masonryAcid waste water 93 m3 67.1 m3 Structural assessment 30/05/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 34 general purpose
concrete/masonrySodium Hydroxide 66 m3 49.5m3 Structural assessment 30/05/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 84 general purpose
concrete/masonryAcid waste water 65 m3 1.43 m3 Structural assessment 07/03/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 278 general purpose
concrete/masonryAcid waste water 63 m3 1.43 m3 Structural assessment 07/03/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 280 general purpose
concrete/masonryLime Solution 15 m3 3.1 m3 Structural assessment 30/05/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 86 general purpose
concrete/masonryPackaged Hazardous Chemicals 13 m3 0.5 m3 Structural assessment 24/11/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 101 general purpose
concrete/masonryPackaged Hazardous Chemicals 193 m3 18.44 m3 Structural assessment 24/11/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
How many sumps on site are included in the integrity test schedule?
dropdown menu click to see options
Are you required by your licence to undertake integrity testing on bunds and containment structures ? if yes please fill out table B1 below listing all new bunds and
containment structures on site, in addition to all bunds which failed the integrity test-all bunding structures which failed including mobile bunds must be listed in
the table below, please include all bunds outside the licenced testing period (mobile bunds and chemstore included)
Does the site maintain a register of bunds, underground pipelines (including stormwater and foul), Tanks, sumps and containers? (containers refers to
"Chemstore" type units and mobile bunds)
How many of these sumps are integrity tested within the test schedule?
Do all sumps and chambers have high level liquid alarms?
If yes to Q11 are these failsafe systems included in a maintenance and testing programme?
Table B1: Summary details of bund /containment structure integrity test
Intel Ireland Ltd. AER 2017 Page 53 of 106
Bund/Pipeline testing template Lic No: P0207-04 Year: 2017
dropdown menu click to see optionsBund no. 159 general purpose
concrete/masonryPackaged Hazardous Chemicals 14 m3 4.45 m3 Structural assessment 24/11/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 181 general purpose
concrete/masonryPackaged Hazardous Chemicals 62 m3 2.87 m3 Structural assessment 24/11/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
Bund no. 283 general purpose
concrete/masonry
Trimix Waste 8.4 m3 6.77 m3 Structural assessment 24/11/2017 Yes Fail Small localised areas of
damage to chemical resistant
coating.
Chemical resistant coating
repair. Note CRC repair can
only be effectively carried out
in summer on large outdoor
areas due to the required
curing temperature.
Apr-18 N/A
* Capacity required should comply with 25% or 110% containment rule as detailed in your licence
Intel Ireland Ltd. AER 2017 Page 54 of 106
Bund/Pipeline testing template Lic No: P0207-04 Year: 2017
dropdown menu click to see options Commentary
15 bunding and storage guidelines Yes
16 Are channels/transfer systems to remote containment systems tested? No Due to the extremely large capacities of the
site remote containment transfer systems it is
deemed impractical to conduct hydrostatic
testing. A comprehensive groundwater
monitoring programme is in place which
would identify any release of chemicals into
the groundwater.
17 Are channels/transfer systems compliant in both integrity and available volume? Yes All channels/transfer systems are compliant in
available volume.
For integrity see above.
1 Yes All underground pipelines are tested using
CCTV surveys. Tanks and sumps are
hydrostatically tested.
2 Please provide integrity testing frequency period 3 years
*please note integrity testing means water tightness testing for process and foul pipelines (as required under your licence)
Structure ID Type system Material of construction: Does this structure have Secondary
containment?
Type of secondary
containment
Type integrity
testing
Integrity reports
maintained on site?
Results of test Integrity test failure
explanation <50 words
Corrective action
taken
Scheduled date for
retest
Results of retest(if in current
reporting year)
Fab 14 Process
Effluent Pipe
Process Ductile Iron No N/A CCTV Yes Fail Crack in concrete lining Lined with epoxy
resin
9th November 2017 Pass
Are you required by your licence to undertake integrity testing* on underground structures e.g. pipelines or sumps etc ? if yes please fill out table 2 below listing
all underground structures and pipelines on site which failed the integrity test and all which have not been tested withing the integrity test period as specified
Table B2: Summary details of pipeline/underground structures integrity test
Please use commentary for additional details not answered by tables/ questions above
Has integrity testing been carried out in accordance with licence requirements and are all structures tested in line
with BS8007/EPA Guidance?
Pipeline/underground structure testing
Intel Ireland Ltd. AER 2017 Page 55 of 106
AIR-summary template Lic No: P0207-04 Year 2017
Abbreviations: ELV: Emission Limit Value, RCTO: Rotary Concetrator Thermal Oxidiser, LOD: Limit of Detection, CEMS: Continuous Environmental Monitoring System, PM: Preventive Maintenance, UV: Ultravioloet
Answer all questions and complete all tables where relevant
2 No
3 Basic air
monitoring
checklist
AGN2 Yes
Table A1: Licensed Mass Emissions/Ambient data-periodic monitoring (non-continuous)
Emission
Description
Emission reference
no:
Parameter/ Substance Frequency of
Monitoring
ELV in licence or
any revision
therof
Licence Compliance criteria Measured value Unit of measurement Compliant with
licence limit
Method of
analysis
Annual mass load
(kg)
Comments -reason for change in % mass load from
previous year if applicable
Fab 14 and Fab 24-2
Ammonia exhausts
A158-A161; A257-
A259; A273
Ammonia (NH3) Biannually 2.0 100 % of values < ELV 0.34 mg/Nm3 yes EN 14791:2005 1,044 The strictest ELV is reported which applies when all four
F24-2 ammonia exhaust fans are operating. The average
of all emission point results is reported. The annual
mass emission includes ammonia scrubbers and trimix
waste treatment system emissions.
Fab 14 Ammonia
exhausts
A158-A161 Volumetric flow Biannually 41,000 100 % of values < ELV 17,444 Nm3/hour yes EN 13284-1:2002 The average of all emission point results is reported.
Fab 24-2 Ammonia
exhausts
A257-A259; A273 Volumetric flow Biannually 65,000 100 % of values < ELV 38,822 Nm3/hour yes EN 13284-1:2002 The average of all emission point results is reported.
Fab 10 Boilers A01/A03/A04/A05/
A06
Nitrogen oxides
(NOx/NO2)
Annually 180 100 % of values < ELV 122 mg/Nm3 yes EN 14792:2005 17,278 The average of all emission point results is reported.
The annual mass emission includes boilers, RCTO and
Trimix waste emissions.Fab 14 Boilers A101/A102/A103 Nitrogen oxides
(NOx/NO2)
Annually 170 100 % of values < ELV 83 mg/Nm3 yes EN 14792:2005 The average of all emission point results is reported.
Fab 24 Boilers A201/A202/A203/A
204/A205/A248/A25
3
Nitrogen oxides
(NOx/NO2)
Annually 150 100 % of values < ELV 94 mg/Nm3 yes EN 14792:2005 The average of all emission point results is reported.
Fab 10, 14 and 24
Boilers
A01/A03/A04/A05/
A06,
A101/A102/A103,A2
01/A202/A203/A204
/A205/A248/A253
Carbon monoxide (CO) Annually N/A 100 % of values < ELV 2.31 mg/Nm3 yes EN 15058:2004 18,328 The average of all emission point results is reported.
The annual mass emission includes boilers, RCTO and
Trimix waste emissions.
Fab 24 Speciality
Exhaust
A218 Volumetric flow Biannually 25,200 100 % of values < ELV 17,315 Nm3/hr yes CRM The average of all emission point results is reported.
Fab 14 Speciality
Exhaust
A152 Volumetric flow Biannually 24,500 100 % of values < ELV 16,531 Nm3/hr yes CRM The average of all emission point results is reported.
Fab 14 and Fab 24
Speciality Exhaust
A218/A152 Inorganic Dust
Particles Class I
Biannually 0.05 100 % of values < ELV <.0.0003 mg/Nm3 yes CRM 0.1 The average of all emission point results is reported.
Fab 14 and Fab 24
Speciality Exhaust
A218/A152 Inorganic Dust
Particles Class II
Biannually 0.20 100 % of values < ELV <0.0009 mg/Nm3 yes CRM 0.2 The average of all emission point results is reported.
1 Does your site have licensed air emissions? If yes please complete table A1 and A2 below for the current
reporting year and answer further questions. If you do not have licenced emissions and do not complete a
solvent management plan (table A4 and A5) you do not need to complete the tables
Yes
Periodic/Non-Continuous Monitoring
Are there any results in breach of licence requirements? If yes please provide brief details in the comment
section of Table A1 below.
Was all monitoring carried out in accordance with EPA guidance
note AG2 and using the basic air monitoring checklist?
Please note that the analysis method used for ammonia is as
specified in Intel's Industrial Emissions Licence (colorimetry). We
have submitted a request for approval to the EPA to change this
method to ion chromatography to align with the Agency's Air
Guidance Note No. 2 (AG2) Index of Preferred Methods.
Additional information
Intel Ireland Ltd. AER 2017 Page 56 of 106
AIR-summary template Lic No: P0207-04 Year 2017
Emission
Description
Emission reference
no:
Parameter/ Substance Frequency of
Monitoring
ELV in licence or
any revision
therof
Licence Compliance criteria Measured value Unit of measurement Compliant with
licence limit
Method of
analysis
Annual mass load
(kg)
Comments -reason for change in % mass load from
previous year if applicable
Fab 14 and Fab 24
Speciality Exhaust
A218/A152 Inorganic Dust
Particles Class III
Biannually 0.20 100 % of values < ELV <0.001 mg/Nm3 yes CRM 0.3 The average of all emission point results is reported.
Fab 14 and Fab 24
Speciality Exhaust
A218/A152 Total Dusts Biannually 20 100 % of values < ELV 0.11 mg/Nm3 yes CRM 33 The average of all emission point results is reported.
Fab 10 RCTO
Oxidiser Exhaust
A65-A66 Volumetric flow Quarterly 5,100 100 % of values < ELV 2,649 Nm3/hour yes EN 13284-1:2002 The average of all emission point results is reported.
Fab 14, Fab 24 and
Fab 24-2 RCTO
Oxidiser Exhaust
A155-A157, A214-
A216, A287, A267-
A269
Volumetric flow Quarterly 4,000 100 % of values < ELV 2,349 Nm3/hour yes EN 13649:2001 The average of all emission point results is reported.
Fab 10 RCTO
Concentrator
Exhaust
A61 Volumetric flow Quarterly 120,000 100 % of values < ELV 9,856 Nm3/hour yes EN 13284-1:2002 The average of all emission point results is reported.
Fab 14 and Fab 24-2
RCTO Concentrator
Exhaust
A141-A144, A263-
A266
Volumetric flow Quarterly 34,700 100 % of values < ELV 24,357 Nm3/hour yes EN 13284-1:2002 The average of all emission point results is reported.
Fab 24 RCTO
Concentrator
Exhaust
A260-A262, A270 Volumetric flow Quarterly 48,000 100 % of values < ELV 23,585 Nm3/hour yes EN 13284-1:2002 The average of all emission point results is reported.
Fab 10, Fab 14, Fab
24 and Fab 24-2
RCTO Oxidiser and
Concentrator
Exhaust
A61, A65, A66, A155-
A157, A141-A144,
A214-A216, A287,
A263-A266, A260-
A262, A267-A269,
A270
Organics Class I Quarterly 5 100 % of values < ELV 0.09 mg/Nm3 yes EN 13649:2001 235 The average of all emission point results is reported.
Where results were < LOD, it was assumed that the
emission concentration was equal to the LOD.
Fab 10, Fab 14, Fab
24 and Fab 24-2
RCTO Concentrator
Exhaust
A61, A141-A144,
A263-A266, A260-
A262, A270
Organics Class II Quarterly 20 100 % of values < ELV 0.54 mg/Nm3 yes EN 13649:2001 1,393 The average of all emission point results is reported.
Where results were < LOD, it was assumed that the
emission concentration was equal to the LOD.
Fab 10 Acid
Scrubbed Exhaust
A07, A15, A20 Volumetric flow Quarterly 151,421 100 % of values < ELV 99,697 Nm3/hour yes EN 13284-1:2002 The average of the total flow from this bank of
scrubbers is provided for comparison with the ELV.
Fab 14 Acid
Scrubbed Exhaust
A105-A107, A109-
A111
Volumetric flow Quarterly 350,660 100 % of values < ELV 210,213 Nm3/hour yes EN 13284-1:2002 The average of the total flow from this bank of
scrubbers is provided for comparison with the ELV.
Fab 24 Main and
Fab 24 Bridge Acid
Scrubbed Exhaust
A206-A213 Volumetric flow Quarterly 181,705 100 % of values < ELV 147,948 Nm3/hour yes EN 13284-1:2002 The average total flow from this bank of scrubbers is
provided for comparison with the ELV.
Intel Ireland Ltd. AER 2017 Page 57 of 106
AIR-summary template Lic No: P0207-04 Year 2017
Emission
Description
Emission reference
no:
Parameter/ Substance Frequency of
Monitoring
ELV in licence or
any revision
therof
Licence Compliance criteria Measured value Unit of measurement Compliant with
licence limit
Method of
analysis
Annual mass load
(kg)
Comments -reason for change in % mass load from
previous year if applicable.
Fab 24-2 Acid
Scrubbed Exhaust
A249-A251 Volumetric flow Quarterly 159,391 100 % of values < ELV 125,851 Nm3/hour yes EN 13284-1:2002 The average total flow from this bank of scrubbers is
provided for comparison with the ELV.Fab 10 Acid
Scrubbed Exhaust
A07, A15, A20 Hydrogen fluoride Quarterly 1.70 - 3.00 100 % of values < ELV 0.23 mg/Nm3 yes ISO 15713:2006 2,966 The applicable ELV is dependent upon the total
scrubber header flow and the mean weighted average
concentration across all emission points is reported.
Fab 14, Fab 24
Main, Fab 24 Bridge
and Fab 24-2 Acid
Scrubbed Exhaust
A105-A107, A109-
A111, A206-A213,
A249-A251
Hydrogen fluoride Quarterly 0.85 - 3.00 100 % of values < ELV 0.50 mg/Nm3 yes ISO 15713:2006 The applicable ELV is dependent upon the total
scrubber header flow and the mean weighted average
concentration across all emission points is reported.
Fab 10 Acid
Scrubbed Exhaust
A07, A15, A20 Total fluoride Quarterly 2.20 - 4.00 100 % of values < ELV 0.25 mg/Nm3 yes ISO 15713:2006 3,554 The applicable ELV is dependent upon the total
scrubber header flow and the mean weighted average
concentration across all emission points is reported.
The ISO 15713 method has been adapted to include
filter analysis and therefore, a value for total fluoride.
Fab 14, Fab 24
Main, Fab 24 Bridge
and Fab 24-2 Acid
Scrubbed Exhaust
A105-A107, A109-
A111, A206-A213,
A249-A251
Total fluoride Quarterly 1.10 - 4.00 100 % of values < ELV 0.59 mg/Nm3 yes ISO 15713:2006 The applicable ELV is dependent upon the total
scrubber header flow and the mean weighted average
concentration across all emission points is reported. The
ISO 15713 method has been adapted to include filter
analysis and therefore, a value for total fluoride.
Intel Ireland Ltd. AER 2017 Page 58 of 106
AIR-summary template Lic No: P0207-04 Year 2017
Emission
Description
Emission reference
no:
Parameter/ Substance Frequency of
Monitoring
ELV in licence or
any revision
therof
Licence Compliance criteria Measured value Unit of measurement Compliant with
licence limit
Method of
analysis
Annual mass load
(kg)
Comments -reason for change in % mass load from
previous year if applicable
Fab 10, Fab 14, Fab
24 Main, Fab 24
Bridge and Fab 24-2
Acid Scrubbed
Exhaust
A07, A15, A20, A105-
A107, A109-A111,
A206-A213, A249-
A251
Total acids Quarterly 4 100 % of values < ELV 0.70 mg/Nm3 yes EN 1911-1 (Part
1)
4,487 The average of all emission point results is reported.
Fab 10 Acid
Scrubbed Exhaust
A07, A15, A20 Total acids Quarterly 0.202 100 % of values < ELV 0.049 kg/hr yes EN 1911-1 (Part
1)
The average of all emission point results is reported.
Fab 14 Acid
Scrubbed Exhaust
A105-A107, A109-
A111
Total acids Quarterly 0.234 100 % of values < ELV 0.176 kg/hr yes EN 1911-1 (Part
1)
The average of all emission point results is reported.
Fab 24 Main and
Fab 24 Bridge Acid
Scrubbed Exhaust
A206-A213 Total acids Quarterly 0.182 100 % of values < ELV 0.094 kg/hr yes EN 1911-1 (Part
1)
The average of all emission point results is reported.
Fab 24-2 Acid
Scrubbed Exhaust
A249-A251 Total acids Quarterly 0.213 100 % of values < ELV 0.061 kg/hr yes EN 1911-1 (Part
1)
The average of all emission point results is reported.
Trimix Waste
Treatment System
A and System B
Exhaust
A256A/A256B Volumetric flow Quarterly 7,000 100 % of values < ELV 3,899 Nm3/hr yes EN 13284-1:2002 The average of all emission point results is reported.
Trimix Waste
Treatment System
A and System B
Exhaust
A256A/A256B Ammonia (NH3) Quarterly 80 100 % of values < ELV 4.1 mg/Nm3 yes EN 14791:2005 The average of all emission point results is reported.
Trimix Waste
Treatment System
A and System B
Exhaust
A256A/A256B Nitrogen oxides
(NOx/NO2)
Quarterly 140 100 % of values < ELV 15.7 mg/Nm3 yes EN 14792:2005 The average of all emission point results is reported.
Trimix Waste
Treatment System
Exhausts
A256A/A256B Carbon monoxide (CO) Quarterly 600 100 % of values < ELV 24.6 mg/Nm3 yes EN 15058:2004 The average of all emission point results is reported.
Ambient Air Ambient (L1-L5) Nitrogen dioxide Biannually N/A N/A 11.8 ug/m3 N/A CRM The method used for analysis of the diffusion tubes is
UV Spectoophotometry.
Ambient Air Vegetation Fluoride Quarterly N/A N/A 18.2 mg/kg N/A OTH The average of all vegetation location results is
reported. A method developed by Newcastle University
specifically for fluoride analysis in vegetation is
employed.
Intel Ireland Ltd. AER 2017 Page 59 of 106
AIR-summary template Lic No: P0207-04 Year 2017
4 Yes
5 Yes
6 Yes
7 Yes
Table A2: Summary of average emissions -continuous monitoring
Emission
Description
Emission reference
no:
Parameter/
Substance
ELV in licence or
any revision
therof
Averaging
Period
Compliance Criteria Units of
measurement
Annual Emission Annual
maximum
Monitoring
Equipment
downtime
(hours)
Number of ELV
exceedences in
current reporting
year
Comments
All RCTO Oxidiser
and Concentrator
Exhausts
A61, A65, A66, A155-
A157, A141-A144,
A214-A216, A287,
A263-A266, A260-
A262, A267-A269,
A270
Total Organic Carbon
(as C)
50 30 minute All 30-minutes averages < 2 x
ELV
mg/Nm3 1.8 87.5 475 None All values were in compliance with the ELV of 100
mg/Nm3 TOC during normal operation i.e. all 30 minute
averages were less than twice the nominal ELV. 97% of
all 30-minute mean values were < 1.2 ELV. The figure
for monitoring equipment downtime represents the
combined downtime across all five TOC analysers on
site. During the CEMS downtime, manufacturing
operations were as normal and all RCTOs were
operating within specifications. Therefore, all emissions
were expected to be within the normal range for that
system.
All RCTO Oxidiser
and Concentrator
Exhausts
A61, A65, A66, A155-
A157, A141-A144,
A214-A216, A287,
A263-A266, A260-
A262, A267-A269,
A270
Total Organic Carbon
(as C)
50 24 hour Daily average < ELV mg/Nm3 1.8 27.9 None
All RCTO Oxidiser
Exhausts
A65-A67, A155-
A157, A214-A216,
A287, A267-A269
Nitrogen oxides
(NOx/NO2)
200 30 minute All 30-minutes averages < 2 x
ELV
mg/Nm3 15.3 237 308 None All values were in compliance with the ELV of 400
mg/Nm3 NOx as NO2 i.e. all 30 minute averages were
less than twice the nominal ELV. 97% of all 30-minute
mean values were < 1.2 ELV. The figure for monitoring
equipment downtime represents the combined
downtime across all four combustion gas analysers on
site. During the CEMS downtime, manufacturing
operations were as normal and all RCTOs were
operating within specifications. Therefore, all emissions
were expected to be within the normal range for that
system.
All RCTO Oxidiser
Exhausts
A65-A67, A155-
A157, A214-A216,
A287, A267-A269
Nitrogen oxides
(NOx/NO2)
200 24 hour Daily average < ELV mg/Nm3 15.2 129 None
All RCTO Oxidiser
Exhausts
A65-A67, A155-
A157, A214-A216,
A287, A267-A269
Carbon monoxide (CO) 600 30 minute All 30-minutes averages < 2 x
ELV
mg/Nm3 61.8 1030 None All values were in compliance with the ELV of 1200
mg/Nm3 CO i.e. all 30 minute averages were less than
twice the nominal ELV. 97% of all 30-minute mean
values were < 1.2 ELV.
All RCTO Oxidiser
Exhausts
A65-A67, A155-
A157, A214-A216,
A287, A267-A269
Carbon monoxide (CO) 600 24 hour Daily average < ELV mg/Nm3 61.4 530 None
Ambient Air Ambient Nitrogen oxides
(NOx/NO2)
N/A N/A µg/Nm3 16 N/A
Continuous Monitoring
Does your site carry out continuous air emissions monitoring?
If yes please review your continuous monitoring data and report the required fields below in Table A2 and
Did continuous monitoring equipment experience downtime? If yes please record downtime in table A2 below
Do you have a proactive service agreement for each piece of continuous monitoring equipment?
Did your site experience any abatement system bypasses? If yes please detail them in table A3 below
Intel Ireland Ltd. AER 2017 Page 60 of 106
AIR-summary template Lic No: P0207-04 Year 2017
Table A3: Abatement system bypass reporting table Bypass protocol
Date* Duration** (hours) Location14/03/2017 1.0 Fab 24-2 RCTO
21/03/2017 9.3 Fab 24-2 RCTO
29/03/2017 32.9 Fab 24-2 RCTO
04/04/2017 0.8 Fab 24-2 RCTO
26/04/2017 1.6 Fab 24-2 RCTO
29/05/2017 2.2 Fab 24-2 RCTO
31/05/2017 1.0 Fab 24-2 RCTO
07/06/2017 53.9 Fab 24-2 RCTO
21/06/2017 24.8 Fab 24-2 RCTO
06/07/2017 2.5 Fab 14 RCTO
17/07/2017 34.8 Fab 24-2 RCTO
24/07/2017 52.0 Fab 24-2 RCTO
31/07/2017 50.1 Fab 24-2 RCTO
29/08/2017 0.7 Fab 24 RCTO
30/08/2017 0.5 Fab 14 RCTO
14/09/2017 0.7 Fab 14 RCTO
N/A
N/A
RCTO No. 1 oxidiser restored to normal
operation.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Non-significant
Non-significant
Non-significant
Non-significant
Non-significant
Required preventive maintenance on concentrator
fan.
Non-significant
Non-significant
Non-significant
Non-significant
Non-significant
Note: In all cases except where specified otherwise, these were partial bypasses with at least 50% of the air being abated through the other two operational RCTOs.
To enable bringing back on RCTO 1 fan post
modifications
Required preventive maintenance on RCTO No. 3
Required to support manufacturing operations. High
ambient temperatures affected fan capacity to
maintain pressure required by tools.
Bypass opened for test during fab shutdown.
Therefore, no VOC emissions arose from this but it is
included here for reference only.
Planned RCTO No. 1 upgrade which enabled
reduced natural gas usage and lower carbon
monoxide emissions.
Planned RCTO No. 2 upgrade which enabled
reduced natural gas usage and lower carbon
monoxide emissions.
Planned RCTO No. 3 upgrade which enabled
reduced natural gas usage and lower carbon
monoxide emissions.
Temporary bypass of oxidiser on RCTO No. 1 during
vendor works on system.
Bearing maintenance required on concentrator fan
No. 2.
Reason for bypass Corrective actionImpact magnitude
Test of bypass damper.
Loss of natural gas to F24-2 RCTO system resulting
in failure of all 3 RCTOs and full bypass.
To enable installation of spades to enable design
improvement for RCTO No. 1 fan duct
Non-significant
Required preventive maintenance on RCTO No. 2
Required preventive maintenance on RCTO No. 2
Non-significant
Non-significant
Non-significant
Non-significant
Non-significant
F24-2 RCTO No. 2 failure due to low natural gas
pressure.
Not applicable.
Natural gas was restored and RCTOs
were all rotated back on.
N/A
The RCTO was rotated back on as soon
as possible.
Not applicable.
Not applicable.
Intel Ireland Ltd. AER 2017 Page 61 of 106
AIR-summary template Lic No: P0207-04 Year 2017
8 Do you have a total Emission Limit Value of direct and fugitive emissions on site? if yes please fill out tables A4 and A5 Yes
Solvent
regulations
Reporting year Total solvent input on
site (kg)
Total Fugitive
emissions to Air
from site (kg)
Fugitive
emissions as %
of solvent input
Fugitive Emission Limit Value
(ELV) (%) in licence or any
revision therof
Compliance Comment
2017 6,247,674 30,699 0.5% 15% of total solvent input Yes
(I) Inputs (kg)
Solvent (I) Inputs (kg) Organic solvent
emission in waste
gases(kg)
Solvents lost in
water (kg)
Collected waste solvent (kg) Fugitive Organic
Solvent (kg)
Solvent released in other
ways e.g. by-passes (kg)
Solvents
destroyed
onsite through
physical
reaction e.g.
incineration(kg)
Total emission of
Solvent to air (kg)
All 6,247,674 16,703 626,946 4,578,385 30,699 10,085 680,885 57,487
Total 57,487
(O) Outputs (kg)
Please note that the Solvent Management Plan summary is detailed below. The full report is
available on site for review by the Agency.
Table A4: Solvent Management Plan Summary Total VOC
Emission limit value
Table A5: Solvent Mass Balance summary
Please refer to linked solvent regulations to
complete table 5 and 6
Solvent use and management on site
Intel Ireland Ltd. AER 2017 Page 62 of 106
Lic No: P0207-4 Year 2017
1 Yes
2 Noise
Guidance
note NG4
Yes
3 No
4 N/A
5 No
Date of
monitoring
Time period Noise
sensitive
location -NSL
(if applicable)
LAeq LA90 LA10 LAmax Tonal or Impulsive
noise* (Y/N)
If tonal /impulsive noise was
identified was 5dB penalty
applied?
Comments (ex. main noise sources on site, & extraneous noise ex.
road traffic)
Is site compliant with
noise limits
(day/evening/night)?
04/10/2017 10:02-10:32 NM01 53 48 57 65 No N/A Intel plant noise audible during lulls. Occasional traffic and some
foliage noise.
Yes
04/10/2017 11:56-12:26 NM01 53 47 56 67 No N/A Intel plant noise audible during lulls. Birdsong and some foliage
noise.
Yes
04/10/2017 13:47-14:17 NM01 53 46 57 68 No N/A Intel plant noise audible lulls. Birdsong, occasional traffic and
foliage noise.
Yes
25/10/2017 19:49-20:19 NM01 52 45 56 64 No N/A Intel plant noise audible. Dominant noise sources from traffic,
birdsong, some foliage and occasional distant rail noise.
Yes
26/10/2017 23:08-23:23 NM01 40 34 42 60 No N/A Intel plant noise audible. Distant traffic and railway noise with
occasional aircraft flyover.
Yes
27/10/2017 00:10-00:25 NM01 41 34 38 65 No N/A Intel plant noise audible. Distant traffic and railway noise with
occasional aircraft flyover.
Yes
04/10/2017 10:38-11:08 NM02 52 48 55 63 No N/A Intel plant noise audible. Some foliage noise with birdsong and
occasional aircraft flyover.
Yes
04/10/2017 12:33-13:03 NM02 51 47 54 66 No N/A Intel plant noise not discernible. Foliage noise with birdsong. Yes
04/10/2017 14:26-14:56 NM02 51 49 53 62 No N/A Intel mobile plant noise audible. Yes
25/10/2017 20:33-21:03 NM02 48 46 48 61 No N/A Steady Intel plant noise discernible. Noise contribution from traffic
noise, with birdsong and occasional fireworks.
Yes
26/10/2017 23:27-23:42 NM02 36 27 35 62 No N/A Steady Intel plant noise discernible. Noise contribution from traffic
noise and farm animals.
Yes
27/10/2017 00:29-00:44 NM02 39 27 40 65 No N/A Steady Intel plant noise discernible. Noise contribution from traffic
noise and bird noises.
Yes
04/10/2017 11:16-11:46 NM03 50 48 51 57 No N/A Steady Intel plant noise dominant with occasional foliage noise. Yes
04/10/2017 13:09-13:39 NM03 49 48 50 65 No N/A Steady Intel plant noise dominant with occasional reversing alarms. Yes
04/10/2017 14:59-15:29 NM03 59 51 58 93 No N/A Steady Intel plant noise dominant with increase in plant noise,
potentially from street sweeper in Westlands area.
Yes
Have there been changes relevant to site noise emissions (e.g. plant or operational
changes) since the last noise survey?
Table N1: Noise monitoring summary
When was the noise reduction plan last updated?
Noise monitoring summary report
Was noise monitoring a licence requirement for the AER period?
If yes please fill in table N1 noise summary below
Was noise monitoring carried out using the EPA Guidance note,
including completion of the "Checklist for noise measurement report"
included in the guidance note as table 6?Does your site have a noise reduction plan
Intel Ireland Ltd. AER 2017 Page 63 of 106
Lic No: P0207-4 Year 2017Noise monitoring summary report25/10/2017 21:11-21:41 NM03 47 45 48 60 No N/A Steady Intel plant noise dominant with traffic and foliage noise. Yes
26/10/2017 23:48-00:03 NM03 35 34 37 49 No N/A Steady Intel plant noise dominant with traffic and aircraft noise. Yes
27/10/2017 00:48-01:03 NM03 35 34 36 48 No N/A Steady Intel plant noise dominant with traffic and occasional dog
barking.
Yes
12/10/2017 11:59-12:29 NM04 50 45 52 67 No N/A Noise contributions from distant road traffic noise, livestock,
foliage, birdsong and occasional aircraft flyover.
Yes
12/10/2017 14:05-14:35 NM04 54 46 54 81 No N/A Noise contributions from local and distant road traffic noise,
livestock, foliage, birdsong and occasional aircraft flyover.
Yes
12/10/2017 16:17-16:47 NM04 53 48 55 71 No N/A Noise contributions from local and distant road traffic noise,
livestock, foliage, birdsong and occasional aircraft flyover.
Yes
26/10/2017 22:14-22:44 NM04 43 36 46 55 No N/A Farm machinery operating to NW of location at 315Hz third octave
band, non-Intel related activity. Intel plant inaudible.
Yes
11/10/2017 23:27-23:42 NM04 44 41 45 66 No N/A Distant N4 traffic with distant Intel plant audible along with foliage
noise.
Yes
12/10/2017 00:39-00:54 NM04 43 41 44 55 No N/A Distant N4 traffic with distant Intel plant audible along with foliage
noise.
Yes
25/09/2017 12:48 – 13:18 NM05 48 38 52 69 No N/A Road traffic noise and birdsong dominant with occasional mobile
plant movements on site. No plant noise discernible.
Yes
25/09/2017 14:46 – 15:16 NM05 48 39 48 70 No N/A Road traffic noise and birdsong dominant with occasional mobile
plant movements on site. No plant noise discernible. Intermittent
railway and aircraft flyover noise.
Yes
25/09/2017 16:34 – 17:04 NM05 42 37 44 57 No N/A Road traffic noise and birdsong dominant with occasional mobile
plant movements on site. No plant noise discernible. Intermittent
railway and aircraft flyover noise.
Yes
25/09/2017 22:18 – 22:48 NM05 46 43 48 59 No N/A Road traffic noise and intermittent railway and aircraft flyover
noise. No plant noise discernible.
Yes
26/09/2017 23:51 – 00:06 NM05 42 38 44 57 No N/A Road traffic noise and intermittent railway noise. No plant noise
discernible.
Yes
27/09/2017 00:52 – 01:07 NM05 39 35 42 48 No N/A Road traffic noise No plant noise discernible. Yes
25/09/2017 11:55 – 12:25 NM06 49 41 52 61 No N/A Main noise contribution from traffic noise, birdsong railway and
aircraft flyover noise. Steady Intel plant noise discernible during
lulls with intermittent mobile plant movement from site.
Yes
25/09/2017 14:13 – 14:43 NM06 51 42 54 74 No N/A Main noise contribution from traffic noise, birdsong railway and
aircraft flyover noise. Steady Intel plant noise discernible during
lulls. Local construction noise (non-Intel) related to South of site.
Yes
25/09/2017 16:01 – 16:31 NM06 49 40 52 65 No N/A Main noise contribution from traffic noise, birdsong railway and
aircraft flyover noise. Steady Intel plant noise discernible during
lulls with intermittent mobile plant movement from site.
Yes
26/09/2017 21:46 – 22:16 NM06 48 44 51 64 No N/A Road traffic noise and intermittent railway noise. No plant noise
discernible.
Yes
Intel Ireland Ltd. AER 2017 Page 64 of 106
Lic No: P0207-4 Year 2017Noise monitoring summary report26/09/2017 23:35 – 23:50 NM06 42 38 44 62 No N/A Road traffic noise and intermittent railway noise. No plant noise
discernible.
Yes
27/09/2017 00:35 – 00:50 NM06 45 36 44 62 No N/A Road traffic noise and intermittent railway noise. No plant noise
discernible.
Yes
25/09/2017 11:10 – 11:40 NM07 53 40 50 77 No N/A Main noise contribution from traffic noise, birdsong, railway and
aircraft flyover noise. Steady Intel plant noise discernible during
lulls.
Yes
25/09/2017 13:34 – 14:04 NM07 49 40 52 67 No N/A Main noise contribution from traffic noise, birdsong, railway and
aircraft flyover noise. Steady Intel plant noise discernible during
lulls with intermittent mobile plant movement from site.
Yes
25/09/2017 15:23 – 15:53 NM07 52 47 54 66 No N/A Main noise contribution from traffic noise and railway noise. Steady
Intel plant noise discernible during lulls. Local construction noise
(non-Intel) related to estate property.
Yes
26/09/2017 21:04 – 21:34 NM07 49 45 52 63 No N/A Road traffic noise and intermittent railway noise. Audible activities
from sports ground to North of location. No plant noise audible.
Yes
26/09/2017 23:13 – 23:28 NM07 47 43 48 64 No N/A Road traffic noise and intermittent aircraft flyover. No plant noise
discernible.
Yes
27/09/2017 00:13 – 00:28 NM07 46 44 48 54 No N/A Road traffic noise. No plant noise discernible. Yes
12/10/2017 12:37 – 13: 07 NM08 49 46 51 65 No N/A Distant road traffic noise with birdsong, foliage noise and
occasional aircraft flyover. Plant noise difficult to distinguish.
Yes
12/10/2017 15:02 – 15:32 NM08 49 46 52 65 No N/A Distant road traffic noise with birdsong, foliage noise and
occasional aircraft flyover. Plant noise difficult to distinguish.
Yes
12/10/2017 16:50 – 17:20 NM08 51 48 52 80 No N/A Local and distant road traffic noise with birdsong, foliage noise and
occasional aircraft flyover. Plant noise difficult to distinguish.
Yes
26/10/2017 21:39 – 22:09 NM08 41 35 44 58 No N/A Distant road traffic noise with tapping from neighbour's garden.
Occasional intermittent farm machinery noise (non-Intel) from
fields to NW. Plant noise audible in distance during lulls.
Yes
11/10/2017 23:51-00:06 NM08 52 43 56 70 No N/A Foliage noise raising LAeq. Plant clearly audible along with noise
contribution from road traffic.
Yes
12/10/2017 01:12-01:27 NM08 46 41 49 67 No N/A Foliage noise raising LAeq. Plant clearly audible along with noise
contribution from road traffic.
Yes
12/10/2017 11:20 – 11:50 NM09 49 46 50 67 No N/A Distant road traffic noise with birdsong, foliage noise and
occasional railway and aircraft noise. Plant noise not discernible.
Yes
12/10/2017 13:16 – 13:46 NM09 50 47 50 71 No N/A Local and distant road traffic noise with birdsong, foliage noise and
occasional railway and aircraft noise. Plant noise not discernible.
Yes
12/10/2017 15:40 – 16:10 NM09 51 48 53 70 No N/A Local and distant road traffic noise with birdsong, foliage noise and
occasional railway and aircraft noise. Plant noise not discernible.
Yes
Intel Ireland Ltd. AER 2017 Page 65 of 106
Lic No: P0207-4 Year 2017Noise monitoring summary report26/10/2017 21:01 – 21:31 NM09 40 35 41 60 No N/A Distant road traffic noise with noise from water flow along with
occasional railway and aircraft noise. Plant noise not discernible.
Yes
11/10/2017 23:00-23:15 NM09 47 45 48 63 No N/A Distant road traffic noise dominant noise source. Foliage noise and
occasional dogs barking adding to noise build-up. Plant noise not
discernible.
Yes
12/10/2017 00:15-00:30 NM09 44 42 46 59 No N/A Distant road traffic noise dominant noise source with foliage noise.
Plant noise not discernible.
Yes
The annual noise survey was carried out by AWN consulting on behalf of Intel. In 2017, an additional noise measurement location was added as a once off NM09 to confirm that plant noise is not discernible at this location. Audible
noise sources include traffic on surrounding roads, the passage of trains, aircraft movements, birdsong and, to varying degrees, steady external plant noise from the Intel site. Due to the continuous nature of these external plant
noise sources, it is appropriate to compare the measured LA90 which better reflect the steady background component of the environmental noise climate at each location. At all locations, the LA90 values are within the given limit
values, for day, evening and night-time periods. In addition, review of one-third octave band data confirms that there is no tonal component to measured noise levels at an Noise Sensitive Locations. It therefore may be concluded
that this facility is in compliance with Condition 4.5 of the IEL in respect of noise.
Intel Ireland Ltd. AER 2017 Page 66 of 106
Resource Usage/Energy efficiency summary Lic No: P0207-04 Year 2017
Additional information
1 16th November 2017 The site is acredited to international
standard ISO50001. To support this
accreditiation we carry out continuous
energy auditing. A surveillance audit was
completed in Nov 2017.
2 SEAI - Large Industry
Energy Network
(LIEN)
Yes ISO 50001
3 Yes <0.1%
Energy Use Previous year Current year Production +/- %
compared to
previous reporting
year**
Energy
Consumption +/- %
vs overall site
production*
Total Energy Used (MWHrs) 980,475 988,194
Total Energy Generated (MWHrs)
Total Renewable Energy Generated (MWHrs) 113,197 96,354
Electricity Consumption (MWHrs) 771,605 768,552
Fossil Fuels Consumption:
Heavy Fuel Oil (m3) 0 0
Light Fuel Oil (m3) 109 115
Natural gas (m3) 18,250,512 19,366,757
Coal/Solid fuel (metric tonnes) 0
Peat (metric tonnes) 0
Renewable Biomass 0
Renewable energy generated on site*** 113,197 96,354
* where consumption of energy can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year.
** where site production information is available please enter percentage increase or decrease compared to previous year.
*** renewable energy generated from heat recovery.
When did the site carry out the most recent energy efficiency audit? Please list the recommendations in table 3 below
Is the site a member of any accredited programmes for reducing energy usage/water conservation such as the SEAI
programme linked to the right? If yes please list them in additional information
Where Fuel Oil is used in boilers on site is the sulphur content compliant with licence conditions? Please state percentage in additional
information
Table R1 Energy usage on site
Intel Ireland Ltd. AER 2017 Page 67 of 106
Resource Usage/Energy efficiency summary Lic No: P0207-04 Year 2017
Water Emissions Water Consumption
Water use Water extracted
Previous year m3/yr.
Water extracted
Current year m3/yr.
Production +/- %
compared to
previous reporting
year**
Energy
Consumption +/- %
vs overall site
production*
Volume Discharged
back to
environment(m3yr):
Volume used i.e not discharged to
environment e.g. released as steam
m3/yr
Unaccounted for Water:
Groundwater N/A N/A
Surface water N/A N/A
Public supply 5,777,721 5,931,895
Recycled water N/A N/A
Total 5,777,721 5,931,895 5,078,511 853,384
* where consumption of water can be compared to overall site production please enter this information as percentage increase or decrease compared to the previous reporting year.
** where site production information is available please enter percentage increase or decrease compared to previous year
Total Landfill Incineration Recycled Other Comment
Hazardous (Tonnes) 18,527.33 0.00 5,761.37 9,038.32 3,727.64 Increase in "Other" from 2016 due to
1300 tonnes of corrosive solvent went
for aqueous blend in Veolia Fermoy as
opposed to directly for incineration.
Also, 900 tonnes of sulphuric acid waste
went for physiochemical treatment that
previously went for recycling.
Non-Hazardous (Tonnes) 11,053.11 2040.95 20.38 8883.93 107.85
Table R3 Waste Stream Summary
Table R2 Water usage on site
Intel Ireland Ltd. AER 2017 Page 68 of 106
Resource Usage/Energy efficiency summary Lic No: P0207-04 Year 2017
Date of audit Recommendations Description of
Measures proposed
Origin of measures Predicted energy
savings %
Implementation date Responsibility Completion date Status and
comments
Not applicable. Please note that audit
recommendations are evaluated and where
feasible, the recommendations will become a
site energy project and is tracked through the
site's Environmental management objectives,
targets and programmes. For high level energy
information please refer to the EMP template.
More detailed information is available for review
at the Intel site.
SELECT
Table R5: Power Generation: Where power is generated onsite (e.g. power generation facilities/food and drink industry)please complete the following information
Unit ID Unit ID Unit ID Unit ID Station Total
Technology
Primary Fuel
Thermal Efficiency
Unit Date of Commission
Total Starts for year
Total Running Time
Total Electricity Generated (GWH)
House Load (GWH)
KWH per Litre of Process Water
KWH per Litre of Total Water used on Site
Table R4: Energy Audit finding recommendations
Intel Ireland Ltd. AER 2017 Page 69 of 106
Complaints and Incidents summary template Lic No: P0207-04 Year 2017
Additional information
Yes
Date Category Other type (please specify) Brief description of
complaint (Free txt <20
words)
Corrective action< 20
words
Resolution status Resolution date Further
information
01/02/2017 Noise Local neighbour
contacted Intel outlining
that they were
experiencing noise from
site.
Following full
investigation no unusual
noise source from site
was noted to be
attributing to noise
concern made by the
local neighbour.
Complete 09/02/2017
09/08/2017 Odour Local neighbour advised
Intel that they were
experiencing an odour
over a 4-5 week period
when the wind was
coming from the north.
Following full
investigation it was
determined that no
odour from site was
noted to be attributing
to the odour concern
made by the local
neighbour.
Complete 23/08/2017
19/08/2017 Noise Local neighbour
contacted Intel outlining
that they were
experiencing noise from
site.
Following full
investigation no unusual
noise source from site
was noted to be
attributing to noise
concern made by the
local neighbour.
Complete 21/08/2017
02/09/2017 Noise Local neighbour
contacted Intel outlining
that they were
experiencing noise from
site.
Following full
investigation no unusual
noise source from site
was noted to be
attributing to noise
concern made by the
local neighbour.
Complete 02/09/2017
05/11/2017 Noise Local neighbour
contacted Intel outlining
that they were
experiencing noise from
site.
Following full
investigation no unusual
noise source from site
was noted to be
attributing to noise
concern made by the
local neighbour.
Complete 07/12/2017
Complaints
Have you received any environmental complaints in the current reporting year? If yes please complete
summary details of complaints received on site in table 1 below
Table 1 Complaints summary
Intel Ireland Ltd. AER 2017 Page 70 of 106
Complaints and Incidents summary template Lic No: P0207-04 Year 2017
Complaints20/11/2017 Noise & Air Local neighbour
contacted Intel outlining
they were experiencing
noise from site and
subsequently raised a
concern about smoke
from site.
Following full
investigation no unusual
noise source from site
was noted to be
attributing to noise
concern made by local
neighbour. Following
full investigation it was
determined that there is
no smoke emission from
the exhaust stacks as
indicated by the
neighbour. The
neighbour was advised
plumes are more visible
under certain weather
conditions and time of
day (e.g. day versus
night).
Complete 29/01/2018
11/12/2017 Noise Local neighbour advised
that they were
experiencing noise from
site either the first or
second or third or fourth
week in November.
Following full
investigation no unusual
site noise was attributed
to noise concern raised
by the local neighbour.
Complete 11/12/2017
16/12/2017 Noise Local neighbour advised
Intel that they were
experiencing noise from
site.
Following full
investigation no unusual
noise from site was
attributed to the noise
concern raised by the
local neighbour.
Complete 21/12/2017
Total complaints
open at start of
reporting year
0
Total new
complaints
received during
reporting year
8
Total complaints
closed during
reporting year
8
Balance of
complaints end of
reporting year
0
Intel Ireland Ltd. AER 2017 Page 71 of 106
Complaints and Incidents summary template Lic No: P0207-04 Year 2017
Complaints
Additional information
Yes
What is an incident
Table 2 Incidents summary
Date of occurrence Incident nature Location of occurrence Incident
category*please refer to
guidance
Receptor Cause of
incident
Other cause(please
specify)
Activity in
progress at time
of incident
Communication Occurrence Corrective action<20
words
Preventative action <20 words Resolution
status
Resolution
date
Likelihood of
reoccurence
14/03/2017 Planned downtime of the Fab 10
Total Organic Carbon analyser to
carry out upgrade works
Licenced discharge point
(Fab 10 Rotary
Concentrator Thermal
Oxidiser - A61 & oxidisers -
A65 & A66)
1. Minor Air Other (Note this
was a planned
downtime for
upgrade works)
Normal activities EPA New Not applicable as this
was a planned
downtime to
upgrade the Fab 10
monitoring system.
Implement any recommendations
from the Fab 10 upgrade work and
apply to the Fab 14 Total Organic
Carbon monitoring system upgrade.
Complete 16/06/2017 Low
24/04/2017 Planned downtime of the Fab 14
Total Organic Carbon analyser to
carry out upgrade works
Licenced discharge point
(Fab 14 Rotary
Concentrator Thermal
Oxidiser A141-A144 & A155-
A157)
1. Minor Air Other (Note this
was a planned
downtime for
upgrade works)
Normal activities EPA New Not applicable as this
was planned
downtime to
upgrade the Fab 14
Total Organic Carbon
monitoring system.
Not applicable as this was planned
downtime to upgrade the Fab 14
Total Organic Carbon monitoring
system.
Complete 28/04/2017 Low
23/06/2017 Abatement equipment off-line –
One of the F24-2 acid gas
scrubbers (Emission Reference
A250) failed for approximately 48
minutes resulting in loss of
abatement on that scrubber
Licenced discharge point
(Acid Gas Scrubber A250)
1. Minor Air Plant or
equipment issues
Normal activities EPA New The scrubber was
rotated offline.
The pump was refurbished and
reinstalled.
Complete 26/02/2018 Low
24/08/2017 Lime Spillage Other location (spill) 1. Minor Contained spill Operational
controls of lime
supplier to site
Normal activities EPA New The tanker offload
area was cordoned
off by Intel
emergency response
team and clean up of
the area was
commenced. The
washings from the
clean up were sent to
the on-site Acid
waste neutralization
wastewater
treatment system.
All tankers coming to site were
retrofitted with rear stop isolation
valves. The operational procedure
of the supplier was updated to
ensure depressurisation prior to
disconnection of hosing.
Complete 18/10/2017 Low
24/11/2017 Monitoring equipment offline Other location (storm
water discharge point SW1)
1. Minor No Uncontrolled release Plant or
equipment issues
Normal activities EPA New The autosampler
refrigeration unit was
found to be faulty
and was bypassed.
This allowed power
to be restored to the
sampler and
flowmeter.
The autosampler unit was replaced
with a new unit.
Complete 23/01/2018 Low
Total number of
incidents current
year
5
Total number of
incidents previous
year
6
% reduction/
increase
17% reduction
Incidents
Have any incidents occurred on site in the current reporting year? Please list all incidents for current
reporting year in Table 2 below
*For information on how to report and what
constitutes an incident
Intel Ireland Ltd. AER 2017 Page 72 of 106
Environmental Management Programme/Continuous Improvement Programme template
Lic No: P0207-04 Year 2017
YesYesYesYes
Objective Category or
Environmental Aspect
Objective Obj No. Target Project Due Date Owner Comments/Updates Status
Air Emissions To comply with EPA commitment 1 Determine feasibility of retrofitting the
Fab 14 Total Organic Carbon analyser
to enable routing calibration gases to
the sample points to enable
verificaiton of the sampling system.
Investigate the feasibility of routing the
CEMS gas via the sampling probes to
the TOC analyser for checking the
entire sampling system.
Q2 2017 Env.
Engineer
All TOC analysers across the site now
have the functionality to enable
verification of the sampling system by
routing calibration gas up to each
sample point and back through the
sampling line to the analyser.
Complete
Air Emissions Continuous improvement of data
management system and reporting
2 Reduce time spent exporting
continuous data and running
calculations in Excel.
Develop method to automatically
calculate data ensuring maintenance
related data and data associated with
offline abatement is not included.
Q3 2017 Env.
Engineer
Facility Management System now
calculates data ensuring more accurate
reporting of emissions.
Complete
Air Emissions Improve access to F24-2 emission
points
3 Compliance with Condition 3.5 (to
provide safe and permanent access to
all on-site sampling and monitoring
points)
Install equipment hoist to reduce
manual handling risk
Q4 2017 Env.
Engineer
Funding was approved in Q4 2017.
Will be carried over to 2018.
In progress
Air Emissions Improve access to F14 emission points 4 Compliance with Condition 3.5 (to
provide safe and permanent access to
all on-site sampling and monitoring
points)
Investigate feasibility of installing
equipment hoist to reduce manual
handling risk
Q4 2017 Env.
Engineer
Funding was approved in Q4 2017.
Will be carried over to 2018.
In progress
Do you maintain an environmental documentation/communication system to
Do you maintain an Environmental Mangement System (EMS) for the site. If yes,
please detail in additional information
Intel Corporation holds a multisite certification
to the voluntary environmental standard ISO
14001 and safety stanardard OHSAS 18001.
The Intel Ireland site also holds site
certification to the energy management
standard ISO 50001.Does the EMS reference the most significant environmental aspects and
Does the EMS maintain an Environmental Management Programme (EMP) as
Intel Ireland Ltd. AER 2017 Page 73 of 106
Air Emissions Compliance 5 Continuation of vegetation analysis
method once this is discontinued by
the laboratory that developed this
method.
Carry out laboratory trials and
compare results with original
laboratory to assess consistency of this
method between laboratories.
Q2 2017 Env.
Engineer
An intra-laboratory study was
conducted to ensure consistency with
the original method developed by
Newcastle University. A new
laboratory was chosen to enable
continuation of this analysis.
Complete
Air Emissions Compliance with Condition 2.2.2.2 6 Control parameters correlation with
ammonia and fluoride emissions to air.
Investigate how the control
parameters associated with the
emissions to air abatement systems
correlate with emission levels of
fluorides and ammonia.
Q3 2017 Env.
Engineer
The control parameters specified in
Intel's Industrial Emissions Licence for
the acid and ammonia scrubbers are
pH and conductivity. Intel's Technology
Development site determine, based on
best practice and manufacturers
recommendations, what the optimum
set points for pH and conductivity are
for fluoride and ammonia removal.
While there is inconclusive data in
relation to any correlation between
fluoride/ammonia emissions and
conductivity, this parameter is
optimised to ensure the blow down
from the scrubbers is at a sufficient
concentration for onsite wastewater
treatment. In relation to pH, general
scrubber vendor recommendations for
optimum HF removal is a higher pH,
while a lower pH is recommended for
optimum ammonia removal. Intel's
Technology Development site
continues to investigate the control
parameters for fluoride and ammonia
removal in relation to semiconductor
activities. This project will be carried
over to 2018.
In progress
Air Emissions/Resource
Utilisation
Reduce environmental emissions and
natural gas usage
7 Reduce carbon monoxide emissions
and natural gas usage associated with
RCTO solvent abatement systems
Carry out vendor upgrades to RCTO
units across the site to enable
improvements in air emissions and
natural gas usage.
Q3 2017 Env.
Engineer/
Mechanic
al
Engineer
All RCTO units were upgraded by the
abatement system vendor which
resulted in approximately 30%
reduction in natural gas usage and 30%
- 90% reduction in CO emissions from
the oxidisers.
Complete
Surface/Grouwater
protection
Compliance with Condtion 6.16 8 Ensure all required bund/underground
pipe integrity testing is completed
Carry out hydrostatic testing of bunds
that are due for testing in 2017.
Q4 2017 Env.
Engineer
45 bunds were tested in 2017. 10
bunds failed inspections due to small
areas of chemical resistant coating
damage. The repair of these bunds has
been included in the 2018 EMP
Complete
Surface/Grouwater
protection
Compliance with Condtion 6.16 9 Ensure all required bund/underground
pipe integrity testing is completed
Carry out hydrostatic testing of loading
aprons
Q4 2017 Env.
Engineer
2 Loading aprons were tested in 2017.
Both failed. See Obj No. 11 for repair
details.
Complete
Surface/Grouwater
protection
Compliance with Condtion 6.16 10 Ensure all required bund/underground
pipe integrity testing is completed
Conduct testing of F24 contained
storm systems
Q1 2017 Env.
Engineer
Testing showed that the pipes are in
good condition but the main isolation
valve is passing. See Obj No. 11 for
repair details.
Complete
Intel Ireland Ltd. AER 2017 Page 74 of 106
Surface/Grouwater
protection
Compliance with Condtion 6.16 11 Ensure all required bund/underground
pipe integrity testing is completed
Repair and retest all contained storm
valves that failed hydrostatic tests
Q2 2018 Env.
Engineer
Numerous repair attempts have been
made but retests have failed. Valve will
be replaced if final repair attempt fails.
In progress
Hazardous Waste Reduce environmental impact of
chemical waste generated by IR site
operations.
12 Achieve zero chemical waste to landfill
in line with Intel corporate targets.
Achieve zero chemical waste to landfill
by 2020 in line with Intel corporate
targets.
2020 EHS
Manager
Zero hazardous waste went to landfill
during 2017
Ongoing
Non-Hazardous Waste Recycle 90% of our solid waste (non-
hazardous) generated per year
13 Recycle 90% of our non-hazardous
waste in line with Intel Corporate
targets
Find a new outlet for calcium fluoride
filter cake
Market
Dependen
t
Timefram
e
EHS
Manager
Gannon ECO have proposed to mix the
calcium fluoride filter cake with other
waste materials and produce large
blocks to be used as temporary
supports in the construction industry.
Initial trial loads went to Eco Gannon in
WW35 2017 with all loads going to the
facility by begining of Q4. Non-
hazardous recycling rate of 93%
reached for Q4 2017.
Complete
Materials Handling Ensure compliance with the REACH
regulation
14 Track all substances used for REACH
registration compliance.
Track all substances used in 2017 for
REACH registration status and SDS CLP
compliance.
Q4 2017 GM All substances have been assessed for
REACH registration. This is an ongoing
project as new substances come on-
board.
Complete
Materials Handling Ensure compliance with the CLP
regulation
15 Manage SDS compliance Obtain REACH/CLP format SDSs for all
products in use.
Q4 2017 GM EU CLP formatted SDSs received from
all suppliers.
Complete
Resource utilization Conserve natural resources 16 Provide annaulised savings of $3.2M in
utilities projects. There is a stretch
target in place for $4M.
Implementation of energy projects as
scheduled in the site energy project
tracker. Please note these include
water reduction projects.
Q4 2017 CS
Engineeri
ng groups
The energy projects completed in 2017
provided an annualised saving of
$5.2M which exceeded both the goal
and the stretch goal. The site is
purchasing 100% renewable electricity
as of 2017.
Complete
Resource utilization Conserve natural resources 17 Maintain accreditation to a multisite
ISO 50001 accreditation with Ireland as
the head office.
Complete a head office ISO 50001
external audit to maintain
accreditation
Q4 2017 Env
Engineer
Head office ISO 50001 surveillance
audit was completed on 16th
November 2017.
Complete
Wastewater To track fluoride emissions in
wastewater
18 Track fluoride emissions to sewer
against our commitment to the EPA
(letter dated 5th December 2007) to
reduce fluoride emissions on a
production basis for future
technologies.
Fluoride emissions from the site are
tracked on a weekly basis as per IE
licence requirements. The average
mass emissions for the current
technology and the previous
technology are calculated using
representative production timeframes
to determine, when normalized for the
increased process complexity, the
reduction in Fluoride emissions.
Ongoing Env
Engineer
A full year's worth of production and
emissions data was used in the fluoride
reduction calculations for 2017. These
calculations demonstrate an
approximate 50% reduction in fluoride
emissions when normalised for
production and complexity factors
between the current production
technology and the previous
production technology.
Ongoing
Intel Ireland Ltd. AER 2017 Page 75 of 106
Visual Impact/ Impact on
local Environment
To increase Env Awareness at the Intel
Ireland Site
19 Establish an overall Biodiversity Plan
for the Intel Ireland site
Establish an overall biodiversity plan
for the site that all employees can see
e.g Ergo/ Env Walks, Bat/Bird Boxes
Q4 2017 Env
Engineer
In 2017, biodiversity work was
completed throughout the year.
Projects included:
Q1 :Intel have allotments available for
employees use, which will engage
employees in adding to the local area
biodiversity and increase employee
awareness.
Feb 9th - Trinity College Dublin lecture
completed
Q2 - The wildflower meadow is in
bloom
Q2 - Working with local schools/
Community to increase biodiversity
awareness e.g. San Carlos
"Embracing Biodiversity" was launched
on April 20th
Q3- Intel Ireland's biodiversity work
acknowledged and achieved Intel's
Environemntal Excellence award
(Silver)
Q4 - Irish Times piece " Insect Hotels
and Wildflower Meadows: Industrial
Site Goes Green
https://www.irishtimes.com/news/env
ironment/insect-hotels-and-wildflower-
meadows-industrial-site-goes-green-
1.3249671
Complete
Noise Continuous improvement 20 Install 2 additional weather stations to
site noise monitors to provide current
and future trending capabilities.
Install 2 additional weather stations to
site noise monitors to provide current
and future trending capabilities.
Q2 2017 Env.
Engineer
2 weather stations installed with
warning and alerts system put in place.
Complete
Environmental Health &
Safety Management System
Ensure completion of three third pary
audits of Intel Ireland Ltd. (Intel
Corporation Internal Audit group, Intel
Corporation Environmental Health &
Safety Group and NSAI surveillance
audit to ISO14001 and OHSAS 18001).
21 Ensure successful third party audits
take place at the site.
Prepare the Intel Ireland Site for 3rd
party Environmental Health and Safety
Audits.
Q2/3
2017
Env
Engineer
The site successfully completed its
Intel Corporation Internal Audit, Intel
Corporate EHS audit and NSAI audit for
ISO 14001 and OHSAS 18001
requirements. The site underwent an
EPA audit in May 2017. There were no
major findings in all audits.
Complete
Environmental Health &
Safety Management System
Transition to new document
management software tool
22 Review all EHS documents before
migration to new document
management tool.
Ensure EHS documents are migrated
correctly to new software tool with no
impact to compliance.
Q2 2017 Env
Engineer
The new document management
system went live in September 2017. A
site validation process was completed
in October, November & December
2017 to ensure that issues noted with
the new software tool were rectified.
Complete
Intel Ireland Ltd. AER 2017 Page 76 of 106
Environmental Health &
Safety Management System
Engage in local community on
environmental awareness topics
23 Provide school visits as part of
Engineers Ireland Week and Intel
Miniscientist. Provide community
engagement evenings in 2017.
Provide school visits as part of
Engineers Ireland Week and Intel
Miniscientist
Q1 2017
and Q4
2017
Env
Engineer
There were 7 Community Engagement
vists completed in 2017 with approx 25
People per visit.
Biodiversity report launched on the
20th April.
26th April Intel launched the sensory
and biodiversity garden San Carlos
school at Leixlip. Installing solar panels
in schools around general locality.
Env Engineers engaged in Engineers
week in 2017 at local primary schools.
Env engineers engaged in Intel's
Miniscientist competition in national
schools across the island of Ireland and
the Regional Final in Blanchardstown
Institute of Technology and Grand Final
in January 2018 in Dublin City
University. As part of Intel's
Miniscientist the environment is one
theme which students can choose to
do their project on helping to spread
awarenesss of protection of the
environment.
Complete
Noise Improve noise impact during abnormal
plant activities
24 Implement silencer on Fab 10 Air
Seperation Unit vent which is
activitated during abnormal plant
activity due to the trip of nitrogen
supply. Technically know as double
block and bleed venting.
Implement silencer on Fab 10 Air
Seperation Unit vent which is
activitated during abnormal plant
activity due to trip of nitrogen supply.
Technically know as double block and
bleed venting.
Q1 2017 Env
Engineer
This project was implemented
successfully.
Complete
Hazardous Waste Improve controls on hazardous waste
leaving site
25 Improve controls on hazardous waste Weighbridge and new Veolia field
office to be brought online to check
Q2 2017 Env
Engineer
Weighbridge is online and all
trucks/tankers for hazardous waste
loads report to the Veolia site office
upon arrival at the site for weigh-in.
Tankers/trucks also report to Veolia
office prior to departure and are
reweighed. Veolia staff check all
paperwork, placarding and marking
upon arrival onsite prior to tank/truck
being loaded.
Complete
Intel Ireland Ltd. AER 2017 Page 77 of 106
Environmental Health &
Safety Management System
Improve EHS document management
and retention
26 Improve EHS document management
and retention
Review of EHS document management
cabinets to streamline and ensure
master listing is up to date.
Q2/Q3
2017
Env
Engineer
EHS documentation was reviewed in
line with legal requirements and those
records not legally required to keep
were removed. EHS policy for
retention agreed by Intel legal.
Systematic compliance task
incorporated into the site management
system to ensure annual review of
retention of EHS documentation to
meet the policy requirements.
Complete
Noise Update the site Noise survey report
2015 to measure emissions which were
provided as technical estimates
27 Update the site Noise survey report
2015 to measure emissions which were
provided as technical estimates.
Update the site Noise survey report
2015 to measure emissions which were
provided as technical estimates
Q3 2017 Env
Engineer
Where feasible noise measurements
were taken for noise sources where
manufacturers data was used in the
site noise model. Additional readings
were taken in Q4 2017 and AWN
consulting are currently generating an
updated noise report. Additional noise
source readings will be taken in 2018
as new sources are commissioned.
Therefore, this target will be continued
on into 2018.
In progress
Note: Please note that Intel Corporation generate a 10 year plans for achievement of public environmental goals which the site aligns to and this is detailed in the current EMP where appropriate.
Note a rolling 5 year plan for site is not generated due to the rapid changes in the technology sector the site implements an annual plan which is more appropriate to the business environment we operate in.
Intel Ireland Ltd. AER 2017 Page 78 of 106
Environmental Management Programme/Continuous Improvement Programme templateLic No: P0207-04 Year 2018
YesYesYesYes
Objective
Category or
Environmental
Aspect
Objective Obj No. Target Project Due Date Owner Env Owner Comments/Updates Status
Air Emissions Improve access to F24-2 emission points 1 Install equipment hoist to reduce manual
handling risk
Installation of hoist for air abatement
monitoring equipment.
Q2 2018 Env.
Engineer
A. Breheny In progress
Air Emissions Improve access to F14 emission points 2 Install equipment hoist to reduce manual
handling risk
Installation of hoist for air abatement
monitoring equipment.
Q3 2018 Env.
Engineer
A. Breheny In progress
Air Emissions Compliance with Condition 2.2.2.2 3 Control parameters correlation with ammonia
and fluoride emissions to air.
Investigate how the control parameters
associated with the emissions to air abatement
systems correlate with emission levels of
fluorides and ammonia.
Q4 2018 Env.
Engineer
A. Breheny The control parameters specified in Intel's
Industrial Emissions Licence (IEL) for the acid
and ammonia scrubbers are pH and
conductivity. Intel's Technology Development
site determine, based on best practice and
manufacturers recommendations, what the
optimum setpoints are for pH and conductivity
are for fluoride and ammonia removal. While
there is inconclusive data in relation to any
correlation between fluoride/ammonia
emissions and conductivity, this parameter is
optimised to ensure the blowdown from the
scrubbers is at a sufficient concentration for
onsite wastewater treatment. In relation to pH,
general scrubber vendor recommendations for
optimum HF removal is a higher pH, while a
lower pH is recommended for optimum
ammonia removal. Intel's Technology
Development site continues to investigate the
control parameters for fluoride and ammonia
removal in relation to semiconductor activities.
In progress
Air Emissions Reduction of Emissions to Air 4 Operation of the Fab 24-2 RCTO system on a
duty/standby basis to reduce the frequency of
bypasses of the system.
Investigate the feasbility of improving the
design of the F24-2 RCTO system to ensure the
system can operate on a duty/standby basis.
Q3 2018 Env.
Engineer
A. Breheny In progress
Do you maintain an environmental
Do you maintain an Environmental Mangement System
(EMS) for the site. If yes, please detail in additional
information
Intel Corporation holds a multisite certification to the voluntary environmental standard
ISO 14001 and safety stanardard OHSAS 18001. The Intel Ireland site also holds site
certification to the energy management standard ISO 50001.
Does the EMS reference the most significant environmental Does the EMS maintain an Environmental Management
Intel Ireland Ltd. AER 2017 Page 79 of 106
Air Emissions Reduction of Emissions to Air 5 Operation of the Fab 14 RCTO system on a
duty/standby basis to reduce the frequency of
bypasses of the system.
Investigate the feasbility of improving the
design of the F14 RCTO system to ensure the
fans can operate on a duty/standby basis.
Q3 2018 Env.
Engineer
A. Breheny In progress
Surface/Groudwa
ter protection
Compliance with Condition 6.16 6 Ensure all required bund/underground pipe
integrity testing is completed
Carry out integrity testing of all 44 bunds that
are due for testing in 2018.
Q4 2018 Env.
Engineer
RKearney In progress
Surface/Groudwa
ter protection
Compliance with Condition 6.16 7 Ensure all required bund/underground pipe
integrity testing is completed
Carry out hydrostatic testing of 9 loading
aprons
Q4 2018 Env.
Engineer
RKearney In progress
Surface/Groudwa
ter protection
Compliance with Condition 6.16 8 Ensure all required bund/underground pipe
integrity testing is completed
Conduct testing of Fab 10 contained storm
system.
Q4 2018 Env.
Engineer
RKearney In progress
Surface/Groudwa
ter protection
Compliance with Condition 6.16 9 Ensure all required bund/underground pipe
integrity testing is completed
Conduct hydrostatic testing of site retention
pond.
Q4 2018 Env.
Engineer
RKearney In progress
Surface/Groudwa
ter protection
Compliance with Condition 6.16 10 Ensure all required bund/underground pipe
integrity testing is completed
Repair and retest all contained storm valves
that failed hydrostatic tests
Q2 2018 Env.
Engineer
RKearney In progress
Hazardous Waste Reduce environmental impact of chemical
waste generated by IR site operations.
11 Achieve zero chemical waste to landfill in line
with Intel corporate targets.
Achieve zero chemical waste to landfill by 2020
in line with Intel corporate targets.
2020 EHS
Manager
R Keane Ongoing
Non-Hazardous
Waste
Recycle 90% of our solid waste (non-hazardous)
generated per year
12 Recycle 90% of our non-hazardous waste in line
with Intel Corporate targets
Recycle 90% of our non-hazardous waste in line
with Intel Corporate targets
Market
Dependen
t
Timefram
e
EHS
Manager
R Keane Ongoing
Resource
utilization
Conserve natural resources 13 Conserve in excess of 400,000m3 water through
various water conservation projects.
Implementation of water conservation projects
as scheduled in the site energy project tracker.
Q4 2018 Corporate
Services
Engineeri
ng groups
RKearney In progress
Resource
utilization
Conserve natural resources 14 Provide annualised savings of $3.2M in energy
projects. There is a stretch target in place for
$4M.
Implementation of energy projects as
scheduled in the site energy project tracker.
Q4 2018 Corporate
Services
Engineeri
ng groups
RKearney In progress
Resource
utilization
Conserve natural resources 15 Maintain accreditation to a multisite ISO 50001
accreditation with Ireland as the head office.
Complete a head office ISO 50001 external
audit to maintain accreditation
Q4 2018 Env.
Engineer
RKearney In progress
Wastewater To track fluoride emissions in wastewater 16 Track fluoride emissions to sewer against our
commitment to the EPA (letter dated 5th
December 2007) to reduce fluoride emissions
on a production basis for future technologies.
Fluoride emissions from the site are tracked on
a weekly basis as per IE licence requirements.
The average mass emissions for the current
technology and the previous technology are
calculated using representative production
timeframes to determine, when normalized for
the increased process complexity, the reduction
in Fluoride emissions.
Ongoing Env.
Engineer
RKearney Ongoing
Intel Ireland Ltd. AER 2017 Page 80 of 106
Visual Impact/
Impact on local
Environment
To increase Env Awareness at the Intel Ireland
Site
17 Maintain a Biodiversity Programme for the
Intel Ireland site
Continue an overall biodiversity plan for the
site that all employees and local community
can see e.g. Ergo/ Env Walks, Bat/Bird Boxes
Q4 2018 Env.
Engineer
T O'Brien In 2018, biodiversity work will continue
throughout the year. Projects to include:
Q1: Winter Bird Feeding programme
established at 5 locations throughout the site.
On Feb 7th - TCD MSc. students along with Dr
Maria Long visited the site to review work being
completed and how to engage employees on a
biodiversity programme.
Q2 -Establish North Kildare Biodiversity
Programme with local tidy Towns and
Maynooth University.
Q3 - Support a Site Visit with a NGO e.g.
Butterfly conservation Ireland.
Q4- Update Biodiversity Database with site
findings throughout 2018.
In progress
Environmental
Health & Safety
Management
System
Engage in local community on environmental
awareness topics
18 Provide school visits as part of Engineers Ireland
Week and Intel Miniscientist. Provide
community engagement evenings in 2017.
Provide school visits as part of Engineers Ireland
Week and Intel Miniscientist.
Q1 & Q4
2018
Env.
Engineer
Env.
Engineers
Feb 23rd - Leixlip School site visit for
Engineering Ireland Week. Due to adverse
weather conditions 'The Beast from the East'
Engineers week volunteering was cancelled for
Env Engineers. Intel are trying to reorganize an
alternative date with the schools.
In progress
Environmental
Health & Safety
Management
System
Improved EHS awareness 19 Increase level of EHS awareness on-site and
externally
1. Updating of EHS webpage
2. Awareness as part of Earth Week
3. Updating of EHS New Employee Orientiation
Video
4. Carry out environmental benchmarking on
environmental awareness and culture at other
multinationals
5. Use site social media communications
channels to promote environmental awareness
at the site.
6. Carry an employee hazardous waste and
WEEE collection event onsite.
7. Updating the site Environmental Awareness
Class
Q1, Q2,
Q3 & Q4
2018
Env.
Engineer
All Env.
Engineers
In progress
Environmental
Health & Safety
Management
System
Improve EHS document management and
retention
20 Improve EHS document management and
retention
Review of EHS document management cabinets
to streamline and ensure master listing is up to
date.
Q1 2018 Env.
Engineer
Cathy Cronin Complete
Noise Improve Noise Source Survey Model 21 Update the site Noise survey report 2015 to
measure emissions which were provided as
technical estimates and incorporate any new
sources in 2018.
Update the site Noise survey report 2015 to
measure emissions which were provided as
technical estimates. Add any additional noise
sources to the site noise model.
Q4 2018 Env.
Engineer
Cathy Cronin Noise measurement were taken of equipment
in 2017 where in 2015 this was not feasible.
Additional noise sources will be measured in
2018 in order to rerun the noise model and
update the noise source survey report.
In progress
Environmental
Health & Safety
Management
System
Improve Site EHS Management System 22 Develop implementation plan for site to
implement ISO45001
1. Review requirements of ISO45001 and
provide implementation plan for new standard.
Q1 & Q2
2018
Env.
Engineer
Cathy Cronin In March 2018, site environmental engineer
attended workshop on ISO45001 held by NSAI.
In progress
Non-Hazardous
Waste
Reduce environmental impact of front of house
waste being produced onsite
23 Reduce environmental impact of front of house
waste being produced onsite
1. Improve waste segregation facilitues at front
of house
2. Reduce the number of disposables being
used onsite
Q4 2018 Env.
Engineer
R Keane In progress
Intel Ireland Ltd. AER 2017 Page 81 of 106
Environmental
Health & Safety
Management
System
Review of site best practice tasks and also site
compliance task to make continuous
improvements to the management system.
24 Improve EHS compliance and best practice
system
1. Review of the site compliance and best
practice tasks to assess if improvements can be
made.
2. Assess resources required to improve the
document system for this process.
3. If feasible implement changes to improve the
system for tracking compliance and best
practices.
Q2 2018 Env.
Engineer
Cathy Cronin Not
started.
Note a rolling 5 year plan for site is not generated due to the rapid changes in the technology sector the site implements an annual plan which is more appropriate to the business environment we operate in.
Note: Please note that Intel Corporation generate a 10 year plans for achievement of public environmental goals which the site aligns to and this is detailed in the current EMP where appropriate.
Intel Ireland Ltd. AER 2017 Page 82 of 106
Environmental Liabilities template Lic No: P0207-04 Year: 2017
Commentary
1 Submitted and agreed by EPA; Previously, the ELRA was incorporated into the
Residual Management Plan (RMP). The initial RMP
was submitted to the Agency in 2003 and was
updated in 2005, 2006 and 2007. A standalone
ELRA was produced in 2010 and submitted to the
Agency. The Agency has not provided any
comments on the content of the intial
RMP/ELRA's submitted.
2 Submitted and agreed by EPA; The company submitted a revised ELRA in January
2015. Intel Ireland submitted a revised ELRA in
December 2015 in accordance with the revised
Guidance Document (2014) and this was agreed
in full by the Agency on October 9th 2017.
3 €775,000 This figure is taken from the ELRA submitted to
the Agency in December 2015.
4 Submitted and agreed by EPA
5 €934,000 This figure is taken from the combined ELRA and
Closure, Restoration, Aftercare Management Plan
(CRAMP) previously submitted to the Agency.
6 Other please specify Parent Company Guarantee (PCG)
7 None
8 Closure plan submitted and not agreed
by EPA
Incorporated into the RMP-CRAMP document
submitted to the Agency in 2010. The Agency has
not provided any comments on the content of the
RMP-CRAMP. A 2010 update was submitted to
the Agency, but the Agency has not provided
comment.
Click here to access EPA guidance on Environmental Liabilities and Financial
provision
Financial provision for ELRA expiry date
Closure plan initial agreement status
Environmental Liabilities Risk Assessment (ELRA) initial agreement status
ELRA review status
Amount of Financial Provision cover required as determined by the latest ELRA
Financial Provision for ELRA status
Financial Provision for ELRA - amount of cover
Financial Provision for ELRA - type
Intel Ireland Ltd. AER 2017 Page 83 of 106
9 Submitted and agreed by EPA The company submitted a revised closure plan in
Dec 2015 and this was approved by the EPA.
10 Submitted and agreed by EPA This was agreed in full by the Agency on October
9th 2017.
11 €18.34 Million
12 Other please specify Parent Company Guarantee
13 None
Closure plan review status
Financial Provision for Closure status
Financial Provision for Closure - amount of cover
Financial provision for Closure expiry date
Financial Provision for Closure - type
Intel Ireland Ltd. AER 2017 Page 84 of 106
P207-04 Schedule D: Report on the assessment of the efficiency of use of raw materials in processes
and the reduction in waste generated.
Design for the Environment (Technology Goals)
Intel Corporation develops and delivers a new chip manufacturing technology approximately every
two years. The development cycle starts typically with six years external research in universities and
government labs, followed by approximately four years joint research and development between Intel
and suppliers followed by two years process development to produce a fully functional technology
before transfer to high volume manufacturing (Figure 1). Intel has recognised that there is an
opportunity for early engagement to effect change for environmental benefit during external and joint
research, in addition to when the process is in high volume manufacturing mode. However, the
optimum time to effect change for environmental design of the process is during the 2 years of final
process development. The Intel Environmental Technology Development (TD) group is involved
throughout this timeframe and has input into manufacturing process development, chemical
selection, waste management, facility systems design and manufacturing equipment selection.
Figure 1: Effecting change during Intel process technology development
For each technology, goals are set for specific types of emissions, for example: - mass of VOCs or
copper emitted per wafer produced. The methodology used for the setting of these goals is to first
Intel Ireland Ltd. AER 2017 Page 85 of 106
evaluate the receiving environment at each of the High Volume Manufacturing (HVM) sites. Items
considered during this review would include existing site permits, local area regulations, wastewater
treatment plant capacity, air and water quality standards and demographic growth projections.
Against this data is set projected wafer manufacturing capacities at each of the HVMs for each of the
technologies. From this are derived acceptable emissions/wafer figures for each of the HVM sites. To
set the corporate goal, the lowest emission/wafer figure so calculated is used. Once the goals have
been ratified at the appropriate management level, measures are put in place during the development
cycle to ensure the targets are met. Measures include material selection, material substitution, recipe
optimisation, emissions treatment and waste segregation. In this way, the Corporation aims to ensure
that the transfer of technologies to the HVMs can be successfully transferred without detrimental
effect on the local environment.
Once the technology is transferred to a receiving HVM site, such as Intel Ireland, actual emissions per
unit of product for each parameter are sampled and reported back to the development site and to the
receiving factory site management to confirm that, when the technology is run in high volume
manufacturing conditions, it performs to the goals that the Technology Development (TD) group is
required to deliver.
Since the inception of the environmental technology goals process, a number of additional parameters
have been included in the more recent years. Currently Intel has technology goals for reducing air,
water and waste emissions per wafer produced.
Material Efficiency
Process Optimisation for Material Efficiency
Due to the very minute dimensions that are patterned onto a wafer during manufacture, process
chemical and gas flow set points need to be very exact.
Process optimisation through the statistical ‘Design of Experiments’ methodology is a practice used
extensively throughout the process to determine the wafer processing recipe set points such as gas
and chemical flows and power during technology development.
Using this method, tests are carried out by varying equipment recipe set points and measuring the
result on the wafer. For example, in a dry etch process; set-point variables for an etchant gas may be
tested at varying flow rates. The flow that provides optimum results on the surface of the wafer is
Intel Ireland Ltd. AER 2017 Page 86 of 106
selected. Process optimisation ensures that excess chemicals, gases or energy are not consumed
which conserves resources.
The current technology that is being manufactured in Intel Ireland uses a 12 inch (or 300mm) wafer
which carries more than twice the number of dies that can be produced on the old 8 inch wafer. This
economy of scale has given rise to an increase in production without a proportional increase in
consumption of raw materials.
Yield Improvements
In all the manufacturing technologies operated on site, yield improvement is a focus area. This covers
the line yield, (the number of wafers that are not scrapped in line), as well as die yield (which is the
number of functioning die per wafer at end of line). The continuous effort to improve yield gives rise
to more efficient use of raw material, thereby conserving resources.
For example; certain compounds reduce the number of defects on the product which can cause
failures in circuits and reducing die yield. Failed circuits are discarded at end of process and require
replacements. Use of these chemicals reduce these process losses and makes the manufacturing
process more efficient, thereby reducing overall emissions and resource use per unit of production.
Intel Ireland Ltd. AER 2017 Page 87 of 106
Proposed PRTR Parameters for 2018
Intel Ireland is proposing the following PRTR parameters for 2018. Please note that this is an indicative
listing of pollutants to be emitted and may therefore change based upon actual manufacturing
operations and emissions.
Emissions to Air:
Sector-Specific PRTR Pollutants
No. Annex II Name
06 Ammonia (NH3) 03 Carbon dioxide (CO2) 02 Carbon monoxide (CO) 04 Hydro-fluorocarbons (HFCs) 08 Nitrogen oxides (NOx/NO2) 05 Nitrous oxide (N2O) 09 Perfluorocarbons (PFCs) 10 Sulphur hexafluoride (SF6) 80 Chlorine and inorganic compounds (as HCl) 86 Particulate Matters (PM10) 07 Non-methane volatile organic compounds (NMVOC)
Remaining PRTR Pollutants
No. Annex II Name
84 Fluorine and inorganic compounds (as HF)
Emissions to Wastewater:
Sector-Specific PRTR Pollutants
No. Annex II Name
12 Total Nitrogen
13 Total Phosphorus
17 Arsenic and compounds (as As)
18 Cadmium and compounds (as Cd)
19 Chromium and compounds(as Cr)
20 Copper and compounds (as Cu)
21 Mercury and compounds (as Hg)
22 Nickel and compounds (as Ni)
23 Lead and compounds (as Pb)
24 Zinc and compounds (as Zn)
76 Total Organic Carbon (TOC) (as total C or as COD/3)
79 Chlorides (as total Cl)
82 Cyanides (as total CN)
83 Fluorides (as total F)
Intel Ireland Ltd. AER 2017 Page 88 of 106
Remaining PRTR Pollutants
No. Annex II Name
238 Ammonia (as N)
240 Suspended Solids
327 Nitrate (as N)
343 Sulphate
347 Total Heavy Metals
356 Cobalt
358 Tin
363 Total Dissolved Solids
Intel Ireland Ltd. AER 2017 Page 89 of 106
| PRTR# : P0207 | Facility Name : Intel Ireland Limited | Filename : P0207_2017.xls |
Return Year : 2017 | 4600 22/03/2018 15:48
Guidance to completing the PRTR workbook
Version 1.1.19
REFERENCE YEAR 2017
1. FACILITY IDENTIFICATION
Parent Company Name Intel Ireland Limited
Facility Name Intel Ireland Limited
PRTR Identification Number P0207
Licence Number P0207-04
Classes of Activity
No. class_name
- Refer to PRTR class activities below
Address 1 Collinstown Industrial Park
Address 2 Leixlip
Address 3
Address 4
Kildare
Country Ireland
Coordinates of Location -6.51258 53.3749
River Basin District IEEA
NACE Code 2611
Main Economic Activity Manufacture of electronic components
AER Returns Contact Name Mark Rutherford
AER Returns Contact Email Address [email protected]
AER Returns Contact Position Environmental Health & Safety Manager
AER Returns Contact Telephone Number 01 606 8896
AER Returns Contact Mobile Phone Number NA
AER Returns Contact Fax Number NA
Production Volume 0.0
Production Volume Units NA
Number of Installations 1
Number of Operating Hours in Year 8760
Number of Employees 4500
User Feedback/Comments Manufacturing operations increased in 2017 from 2016. Non-
hazardous waste increased due to small projects occuring at the site.
There were no non-compliances with IEL in 2017.
Web Address www.intel.ie
2. PRTR CLASS ACTIVITIES
Activity Number Activity Name
9(c)
Installations for surface treatment of substances,objects or products
using organic solvents,in particular
dressing,printing,coating,degreasing,waterproofing,sizing,painting,clea
ning or impregnating
1(c) Thermal power stations and other combustion installations
50.1 General
3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)
Is it applicable? Yes
Have you been granted an exemption ? NoIf applicable which activity class applies (as per
Schedule 2 of the regulations) ? 5- Other surface cleaningIs the reduction scheme compliance route being
used ? No
4. WASTE IMPORTED/ACCEPTED ONTO SITE Guidance on waste imported/accepted onto site
Do you import/accept waste onto your site for on-
site treatment (either recovery or disposal
activities) ? No
This question is only applicable if you are an IPPC or Quarry site
PRTR Returns Workbook
Intel Ireland Ltd. AER 2017 Page 90 of 106
4.1 RELEASES TO AIR Link to previous years emissions data | PRTR# : P0207 | Facility Name : Intel Ireland Limited | Filename : P0207_2017.xls | Return Year : 2017 | 22/03/2018 15:48
8 18 26 26 34 37 6 11 6 6 6 8 18
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS
Please enter all quantities in this section in KGsQUANTITY
Acid Gas Scrubbers Ammonia Scrubbers VOC Emission Points Trimix BoilersEmergency Generators
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 Emission Point 4 Emission Point 5 Emission Point 6 T (Total) KG/YearA (Accidental) KG/Year
F (Fugitive) KG/Year
06 Ammonia (NH3) M EN 14791:2005 0.0 768.9 0.0 274.9 0.0 0.0 1043.8 0.0 0.002 Carbon monoxide (CO) M EN 15058:2004 0.0 0.0 16268.9 1760.3 298.7 0.0 18327.9 0.0 0.008 Nitrogen oxides (NOx/NO2) M EN 14792:2005 0.0 0.0 3713.7 1107.0 12457.4 0.0 17278.1 0.0 0.080 Chlorine and inorganic compounds (as HCl) M EN 1911-1 to 3:2003 1264.0 0.0 0.0 0.0 0.0 0.0 1264.0 0.0 0.0
04 Hydro-fluorocarbons (HFCs) C OTH
Mass Balance Calculations and Emission Factors from IPCC. Fugitive losses based upon estimates losses from on-site chillers 96.0 0.0 0.0 0.0 0.0 0.0 96.0 0.0 0.0
05 Nitrous oxide (N2O) C OTH
Mass Balance Calculations and Emission Factors from IPCC. 98700.0 0.0 0.0 0.0 0.0 0.0 98700.0 0.0 0.0
10 Sulphur hexafluoride (SF6) C OTH
Mass Balance Calculations and Emission Factors from IPCC. 95.0 0.0 0.0 0.0 0.0 0.0 95.0 0.0 0.0
09 Perfluorocarbons (PFCs) C OTH
Mass Balance Calculations and Emission Factors from IPCC. 5965.0 0.0 0.0 0.0 0.0 0.0 5965.0 0.0 0.0
03 Carbon dioxide (CO2) C ETS 0.0 0.0 4242500.0 0.0 38182500.0 0.0 42425000.0 0.0 0.0
86 Particulate matter (PM10) C OTHMass Balance Calculations and Emission Factors 0.0 0.0 9625.9 0.0 2165.2 173.3 11964.4 0.0 0.0
07 Non-methane volatile organic compounds (NMVOC) M OTH
Continuous TOC monitoringdata and calculations toobtain NMVOC 0.0 0.0 13800.7 0.0 0.0 0.0 52870.3 0.0 39069.6
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTSPlease enter all quantities in this section in KGs
QUANTITYAcid Gas Scrubbers
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year84 Fluorine and inorganic compounds (as HF) M ISO/DIS 15713:2004 2965.9 2965.9 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)Please enter all quantities in this section in KGs
QUANTITYAcid Gas Scrubbers VOC Emission Points Speciality Exhaust
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 T (Total) KG/YearA (Accidental) KG/Year
F (Fugitive) KG/Year
330 Organic solvents C MAB
Determined using emissionfactors for solvents usede.g. for wipes 0.0 16703.3 0.0 57487.2 0.0 40783.9
351 Total Organic Carbon (as C) M CRM
Continuous emissionsmonitoring data and periodic
flow measurements 0.0 11135.5 0.0 38324.8 0.0 27189.3
235 Total acids M EN 1911-1 to 3:2003
Part 1 only and analysis
using potantiometric titration. 4486.5 0.0 0.0 4486.5 0.0 0.0
210 Dust M ALT EN 13284-1 0.0 0.0 33.0 33.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
Additional Data Requested from Landfill operators
Landfill: Intel Ireland Limited
Please enter summary data on the
quantities of methane flared and / or utilised
RELEASES TO AIRPOLLUTANT METHOD
Method Used
POLLUTANT
RELEASES TO AIR
RELEASES TO AIRMETHOD
POLLUTANT METHOD
Method Used
For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas
(Methane) flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net
methane (CH4) emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the
table below:
Method Used
Method Used
Intel Ireland Ltd. AER 2017 Page 91 of 106
additional_pollutant_no T (Total) kg/Year M/C/E Method Code
Designation or
Description
Facility Total Capacity m3
per hour
Total estimated methane generation (as per
site model) 0.0 N/AMethane flared 0.0 0.0 (Total Flaring Capacity)
Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)
Net methane emission (as reported in Section A
above) 0.0 N/A
Intel Ireland Ltd. AER 2017 Page 92 of 106
4.2 RELEASES TO WATERS Link to previous years emissions data | PRTR# : P0207 | Facility Name : Intel Ireland Limited | Filename : P0207_2017.xls | Return Year : 2017 | 22/03/2018 15:49
8 8 16 16 24 24 6 6 6 6 6 6
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
RELEASES TO WATERS
Method Used
RELEASES TO WATERS
RELEASES TO WATERS
Method Used
POLLUTANT
Method Used
POLLUTANT
POLLUTANT
Intel Ireland Ltd. AER 2017 Page 93 of 106
4.3 RELEASES TO WASTEWATER OR SEWER Link to previous years emissions data | PRTR# : P0207 | Facility Name : Intel Ireland Limited | Filename : P0207_2017.xls | Return Year : 2017 | 22/03/2018 15:49
8 21 29 35 6 6 6 6 35SECTION A : PRTR POLLUTANTS
Please enter all quantities in this section in KGsQUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
17 Arsenic and compounds (as As) M CRM
U.S. EPA method 200.8
(supplement 1 rev. 5.4 May 1994) 1.54 1.54 0.0 0.0
18 Cadmium and compounds (as Cd) M CRM
U.S. EPA method 200.8
(supplement 1 rev. 5.4 May 1994) 1.27 1.27 0.0 0.0
79 Chlorides (as Cl) M CRM
Ion chromatography method
based on Standard Methods
for the Examination of Water and Wastewater, 2012, 22nd edition, Method 4110B published by the APHA, AWWA and WEF 238711.9 238711.9 0.0 0.0
19 Chromium and compounds (as Cr) M CRM
U.S. EPA method 200.8
(supplement 1 rev. 5.4 May 1994) 1.64 1.64 0.0 0.0
20 Copper and compounds (as Cu) M CRM
U.S. EPA method 200.8 (supplement 1 rev. 5.4 May 1994) 154.2 154.2 0.0 0.0
82 Cyanides (as total CN) M OTH
Method based on APHA, 2012, 22nd Edition, Method 4500 CN - E 1.2 1.2 0.0 0.0
83 Fluorides (as total F) M CRM
Ion chromatography method based on Standard Methods for the Examination of Water and Wastewater, 2012, 22nd edition, Method 4110B published by the APHA, AWWA and WEF 16478.2 16478.2 0.0 0.0
23 Lead and compounds (as Pb) M CRM
U.S. EPA method 200.8 (supplement 1 rev. 5.4 May 1994) 0.15 0.15 0.0 0.0
21 Mercury and compounds (as Hg) M CRM
U.S. EPA method 200.8 (supplement 1 rev. 5.4 May 1994) 0.06 0.06 0.0 0.0
22 Nickel and compounds (as Ni) M CRM
U.S. EPA method 200.8 (supplement 1 rev. 5.4 May 1994) 27.85 27.85 0.0 0.0
12 Total nitrogen M EN 12260:2003Total Nitrogen Analyser IS EN 12260:2003 214456.0 214456.0 0.0 0.0
76 Total organic carbon (TOC) (as total C or COD/3) M CRM
Method based on APHA, 2012, 22nd Edition, Method 5310-B 823785.5 823785.5 0.0 0.0
13 Total phosphorus M CRM
Standard Methods for the Examination of Water and Wastewater, 2012, 22nd edition, Method 4500-PB and Method 4500-PD published by the APHA, AWWA and WEF 3892.2 3892.2 0.0 0.0
24 Zinc and compounds (as Zn) M CRM
U.S. EPA method 200.8 (supplement 1 rev. 5.4 May 1994) 22.85 22.85 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year
238 Ammonia (as N) M CRM
Method based on APHA, 2012, 22nd Edition, Method 4500-NH3 F 46333.1 46333.1 0.0 0.0
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWER
Method Used
Method Used
POLLUTANT METHOD
POLLUTANT METHOD
Intel Ireland Ltd. AER 2017 Page 94 of 106
327 Nitrate (as N) M CRM
Ion chromatography method based on Standard Methods
for the Examination of Water and Wastewater, 2012, 22nd edition, Method 4110B published by the APHA, AWWA and WEF 18795.3 18795.3 0.0 0.0
343 Sulphate M CRM
Ion chromatography method
based on Standard Methods
for the Examination of Water and Wastewater, 2012, 22nd edition, Method 4110B published by the APHA, AWWA and WEF 7987609.7 7987609.7 0.0 0.0
240 Suspended Solids M CRM
Method based on APHA,
2012, 22nd Edition, Method 2540-D 147155.5 147155.5 0.0 0.0
363 Total Dissolved Solids M CRM
Method based on APHA,
2012, 22nd Edition, Method 2540C 12628535.6 12628535.6 0.0 0.0
347 Total heavy metals C CRM
U.S. EPA method 200.8
(supplement 1 rev. 5.4 May 1994) 233.3 233.3 0.0 0.0
358 Tin M CRM
U.S. EPA method 200.8 (supplement 1 rev. 5.4 May 1994) 11.18 11.18 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
Intel Ireland Ltd. AER 2017 Page 95 of 106
4.4 RELEASES TO LAND Link to previous years emissions data | PRTR# : P0207 | Facility Name : Intel Ireland Limited | Filename : P0207_2017.xls | Return Year : 2017 | 22/03/2018 15:50
8 8 16 16 6 6 6 6
SECTION A : PRTR POLLUTANTS
Please enter all quantities in this section in KGs
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year
0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
Please enter all quantities in this section in KGs
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year
0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
POLLUTANT METHOD
Method Used
RELEASES TO LAND
RELEASES TO LAND
POLLUTANT METHOD
Method Used
Intel Ireland Ltd. AER 2017 Page 96 of 106
5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : P0207 | Facility Name : Intel Ireland Limited | Filename : P0207_2017.xls | Return Year : 2017 | 22/03/2018 15:50
5 149 Please enter all quantities on this sheet in Tonnes 149
Quantity (Tonnes per
Year)
Haz Waste : Name and
Licence/Permit No of Next
Destination Facility Non
Haz Waste: Name and
Licence/Permit No of
Recover/Disposer
Haz Waste : Address of Next
Destination Facility
Non Haz Waste: Address of
Recover/Disposer
Name and License / Permit No. and
Address of Final Recoverer /
Disposer (HAZARDOUS WASTE
ONLY)
Actual Address of Final Destination
i.e. Final Recovery / Disposal Site
(HAZARDOUS WASTE ONLY)
Transfer Destination
European Waste Code Hazardous Quantity T/Year Description of Waste
Waste Treatment Operation M/C/E Method Used
Location of Treatment Name and Licence / Permit No. of Rec overer / Disposer / Broker Address of Recoverer / Disposer / Broker Name and Address of Final Destination i .e. Final Recovery / Disposal Si te (HAZARDOUS WAST E ONLY) Licence / Permit No. of Final Destination i .e. Final Recovery / Disposal Si te (HAZARDOUS WAST E ONLY)
To Other Countries 06 01 01 Yes 7.49 sulphuric acid and sulphurous acid D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 06 01 01 Yes 52.28 sulphuric acid and sulphurous acid R5 M Weighed Abroad
Koppers UK Ltd.,EA (UK) BV770IL Variation FP3034SE Variation DP3532SR.
Port Clarence Works Huntsman Drive,Huntsman Drive,Port Clarence Middlebrough ,TS21SD ,United Kingdom
Koppers UK Ltd.,EA (UK) BV770IL Variation FP3034SE Variation DP3532SR.,Port Clarence Works Huntsman Drive,Huntsman Drive,Port Clarence Middlebrough ,TS21SD ,United Kingdom
Port Clarence Works Huntsman Drive,Huntsman Drive,Port Clarence Middlebrough ,TS21SD ,United Kingdom
Within the Country 06 01 01 Yes 2388.52 sulphuric acid and sulphurous acid D9 M Weighed Offsite in Ireland Enva Ireland Ltd.,W0041-01
Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
Enva Ireland Ltd.,W0041-01,Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
To Other Countries 06 01 02 Yes 0.24 hydrochloric acid D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 06 01 03 Yes 1.26 hydrofluoric acid D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 06 01 01 Yes 17.26 sulphuric acid and sulphurous acid D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
To Other Countries 06 01 04 Yes 0.14 phosphoric and phosphorous acid D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 06 01 05 Yes 0.0 nitric acid and nitrous acid D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services,BS5193IE,Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
To Other Countries 06 02 03 Yes 0.03 ammonium hydroxide D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 06 01 06 Yes 1.21 other acids D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 06 02 01 Yes 8.5 calcium hydroxide D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 06 02 04 Yes 0.41 sodium and potassium hydroxide D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Method Used
Intel Ireland Ltd. AER 2017 Page 97 of 106
To Other Countries 06 02 05 Yes 0.22 other bases D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 06 02 05 Yes 3.38 other bases D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
To Other Countries 06 03 14 No 0.0
solid salts and solution other than those mentioned in 06 03 11 and 06 03 13 D10 M Weighed Abroad
Sava GmbH & Co. Kg,A51G00508
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 06 13 02 Yes 14.0 spent activated carbon (except 06 07 02) R1 E Volume Calculation Abroad Enva Ireland Ltd.,W0184-01Clonminam Industrial Estate ,.,Portlaoise,Co. Laois,Ireland
Lindenschmidt KG Umweltservice,N/A,Krombacher Strasse ,42 - 46,Kreuztal-Krombach,57223,Germany
Krombacher Strasse ,42 - 46,Kreuztal-Krombach,57223,Germany
Within the Country 07 01 04 Yes 0.35
other organic solvents, washing liquids and mother liquors D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 08 03 18 No 0.24
waste printing toner other than those mentioned in 08 03 17 R12 M Weighed Offsite in Ireland
Brian Kehoe,WFP-CW-11-06-01
Bagenalstown Industrial Estate,Royal Oak Road,Bagenalstown ,Co. Carlow,Ireland
Within the Country 08 04 99 No 0.23 wastes not otherwise specified D15 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 11 01 10 No 2037.08
sludges and filter cakes other than those mentioned in 11 01 09 D5 M Weighed Offsite in Ireland
Drehid Waste Management Facility,W0201-03
Drehid Waste Management Facility,In the townlands of Parsonstown Loughnacush Kilkeaskin Drummond ,Timahoe West Coolcarrigan Killinagh Lower & Killinagh Upper Carbury,Co. Kildare,Ireland
To Other Countries 11 01 11 Yes 347.87
aqueous rinsing liquids containing dangerous substances R5 M Weighed Abroad
Koppers UK Ltd.,EA (UK) BV770IL Variation FP3034SE Variation DP3532SR.
Port Clarence Works Huntsman Drive,Huntsman Drive,Port Clarence Middlebrough ,TS21SD ,United Kingdom
Koppers UK Ltd.,EA (UK) BV770IL Variation FP3034SE Variation DP3532SR.,Port Clarence Works Huntsman Drive,Huntsman Drive,Port Clarence Middlebrough ,TS21SD ,United Kingdom
Port Clarence Works Huntsman Drive,Huntsman Drive,Port Clarence Middlebrough ,TS21SD ,United Kingdom
To Other Countries 11 01 11 Yes 4290.43
aqueous rinsing liquids containing dangerous substances R5 M Weighed Abroad
Lostock Metals Recovery,EPR/RP3931XD,Edelchemie (UK) Ltd ,Eco-Option House Lostock Works ,Griffiths Road Lostock,Northwich CW9 &NU,United Kingdom
Edelchemie (UK) Ltd ,Eco-Option House Lostock Works ,Griffiths Road Lostock,Northwich CW9 &NU,United Kingdom
Lostock Metals Recovery,EPR/RP3931XD,Edelchemie (UK) Ltd ,Eco-Option House Lostock Works ,Griffiths Road Lostock,Northwich CW9 &NU,United Kingdom
Edelchemie (UK) Ltd ,Eco-Option House Lostock Works ,Griffiths Road Lostock,Northwich CW9 &NU,United Kingdom
To Other Countries 11 01 16 Yes 16.96 saturated or spent ion exchange resins D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 11 01 16 Yes 87.0 saturated or spent ion exchange resins R7 C Volume Calculation Offsite in Ireland Enva Ireland Ltd.,W0041-01
Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
Enva Ireland Ltd.,W0041-01,Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
To Other Countries 11 02 05 Yes 21.2
wastes from copper hydrometallurgical processes containing dangerous substances R4 M Weighed Abroad
Veolia Environmental Services Technical solutions Ltd. (c/o Eco-safe Systems Ltd.),W0054-02,Unit 1A,Allied Industrial Estate ,Kylemore Road Ballyfermot ,D10,Ireland
Unit 1A,Allied Industrial Estate ,Kylemore Road Ballyfermot ,D10,Ireland
Mastermelt Refining Services Ltd.,CB/LN5512WL
Staden Lane ,Ashbourne Road Buxton ,Derbyshire,SK17 9RZ,United Kingdom
Intel Ireland Ltd. AER 2017 Page 98 of 106
To Other Countries 12 01 16 Yes 6.8
waste blasting material containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 13 02 08 Yes 0.1 other engine, gear and lubricating oils D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 13 02 08 Yes 0.62 other engine, gear and lubricating oils R12 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 13 05 03 Yes 0.0 interceptor sludges D9 M Weighed Offsite in Ireland Enva Ireland Ltd.,W0184-01Clonminam Industrial Estate ,.,Portlaoise,Co. Laois,Ireland
Enva Ireland Ltd.,W0041-01,Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
Smithstown Industrial Estate,.,Shannon,Co. Clare,Ireland
Within the Country 13 03 07 Yes 28.88
mineral-based non-chlorinated insulating and heat transmission oils R9 M Weighed Offsite in Ireland
Rilta Environmental Ltd.,Waste licence 192-02
Block 402 Greenogue Business Park ,Rathcoole,.,Dublin,Ireland
Rilta Enviromental Ltd,Waste licence 192-02,Block 402 Greenogue Business Park,Rathcoole,Dublin,.,Ireland
Block 402 Greenogue Business Park,Rathcoole,Dublin,.,Ireland
Within the Country 13 05 07 Yes 0.0 oily water from oil/water separators D9 M Weighed Offsite in Ireland
Dublin City Council Drainage Services,D0034-01
Civic Offices,Wood Quay,Dublin ,8,Ireland
Dublin City Council Drainage Services,D0034-01
Civic Offices,Wood Quay,Dublin ,8,Ireland
Within the Country 13 05 07 Yes 0.0 oily water from oil/water separators R13 M Weighed Offsite in Ireland
Dublin City Council Drainage Services,D0034-01
Civic Offices,Wood Quay,Dublin ,8,Ireland
Dublin City Council Drainage Services,D0034-01
Civic Offices,Wood Quay,Dublin ,8,Ireland
To Other Countries 14 06 01 Yes 4.27 chlorofluorocarbons, HCFC, HFC R3 M Weighed Abroad
Veolia Environmental Services Technical solutions Ltd. (c/o Eco-safe Systems Ltd.),W0054-02 Unit 1A Allied Industrial Estate Kylemore Road Ballyfermot D10 Ireland
Unit 1A,Allied Industrial Estate ,Kylemore Road Ballyfermot ,D10,Ireland
A-Gas (UK) Ltd ,EPR/BP3390FS/V003,Banyard Road,Portbury West,Bristol,Avon BS20 7XH,United Kingdom
Banyard Road,Portbury West,Bristol,Avon BS20 7XH,United Kingdom
To Other Countries 14 06 03 Yes 5342.76 other solvents and solvent mixtures D10 M Weighed Abroad
Veolia Environmental Services,BS5193IE,Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
Veolia Environmental Services,BS5193IE,Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
To Other Countries 14 06 03 Yes 1974.2 other solvents and solvent mixtures R2 M Weighed Abroad
Veolia Environmental Services (UK) Limited,EPR/FP3133GL,Garston Distillation Services,King Street,Liverpool,L19 8EG,United Kingdom
Garston Distillation Services,King Street,Liverpool,L19 8EG,United Kingdom
Veolia Environmental Services (UK) Limited,EPR/FP3133GL,Garston Distillation Services,King Street,Liverpool,L19 8EG,United Kingdom
Garston Distillation Services,King Street,Liverpool,L19 8EG,United Kingdom
Within the Country 14 06 03 Yes 2211.41 other solvents and solvent mixtures R12 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 14 06 03 Yes 1289.26 other solvents and solvent mixtures D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
To Other Countries 14 06 03 Yes 24.08 other solvents and solvent mixtures D9 M Weighed Abroad
TWZ n.v.,Licence Number 8088
Durmakker 4,Haven 8710,Evergem,B9940,Belgium
TWZ n.v.,Licence number 8088,Durmakker 4,Haven 8710,Evergem,B9940,Belgium
Durmakker 4,Haven 8710,Evergem,B9940,Belgium
Within the Country 15 01 02 No 14.53 plastic packaging R13 M Weighed Offsite in Ireland Greenstar Bray,W0053-03
Greenstar Limited,Bray Depot,Fassaroe,Bray Co. Wicklow,Ireland
Intel Ireland Ltd. AER 2017 Page 99 of 106
Within the Country 15 01 02 No 0.1 plastic packaging R13 M Weighed Offsite in Ireland
Irish Packaging Recycling Ltd.,W0263-01
Ballymount Road,.,Walkinstown,Dublin 12,Ireland
Within the Country 15 01 02 No 0.15 plastic packaging R13 M Weighed Offsite in Ireland Panda,W0039-02
Ballymount Cross,Tallaght,Dublin,24,Ireland
Within the Country 15 01 06 No 276.53 mixed packaging R12 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 15 01 06 No 0.0 mixed packaging R12 M Weighed Offsite in Ireland
Greyhound Recycling and Recovery,W0205-01
Crag Avenue,Clondalkin Industrial Estate,Clondalkin,Dublin 22,Ireland
Within the Country 15 01 06 No 13.62 mixed packaging R12 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
To Other Countries 15 01 10 Yes 0.13
packaging containing residues of or contaminated by dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 15 01 10 Yes 0.96
packaging containing residues of or contaminated by dangerous substances D15 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
To Other Countries 15 02 02 Yes 366.52
absorbents, filter materials (including oil filters not otherwise specified), wiping cloths, protective clothing contaminated by dangerous substances D10 M Weighed Abroad
Sava GmbH & Co. Kg,A51G00508
Osterweute 125541,.,Brunsbuttel,.,Germany
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 15 02 03 No 20.38
absorbents, filter materials, wiping cloths and protective clothing other than those mentioned in 15 02 02 D10 M Weighed Abroad
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 16 02 16 No 1.32
components removed from discarded equipment other than those mentioned in 16 02 15 R4 M Weighed Abroad
Mastermelt Refining Services Ltd.,CB/LN5512WL
Staden Lane ,Ashbourne Road,Buxton,SK17 9RZ,United Kingdom
Within the Country 16 02 14 No 7.25
discarded equipment other than those mentioned in 16 02 09 to 16 02 13 R4 M Weighed Offsite in Ireland
A1 Metals/Hegartys Metal Processors (International) Ltd.,ATF WMP007E
.,Aeragar,Mountmellick,Co. Laois,Ireland
Within the Country 16 02 14 No 0.15
discarded equipment other than those mentioned in 16 02 09 to 16 02 13 D5 M Weighed Offsite in Ireland
A1 Metals/Hegartys Metal Processors (International) Ltd.,ATF WMP007E
.,Aeragar,Mountmellick,Co. Laois,Ireland
Within the Country 16 03 03 Yes 0.0
inorganic wastes containing dangerous substances D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
To Other Countries 16 03 03 Yes 0.0
inorganic wastes containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical solutions Ltd. (c/o Eco-safe Systems Ltd.),W0054-02 Unit 1A Allied Industrial Estate Kylemore Road Ballyfermot D10 Ireland
Unit 1A,Allied Industrial Estate ,Kylemore Road Ballyfermot ,D10,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 16 03 04 No 0.0
inorganic wastes other than those mentioned in 16 03 03 D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 16 03 05 Yes 0.0
organic wastes containing dangerous substances D15 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 16 03 05 Yes 0.0
organic wastes containing dangerous substances R4 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Intel Ireland Ltd. AER 2017 Page 100 of 106
To Other Countries 16 03 05 Yes 0.0
organic wastes containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 16 05 04 Yes 0.41
gases in pressure containers (including halons) containing dangerous substances R13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
To Other Countries 16 05 06 Yes 0.04
laboratory chemicals, consisting of or containing dangerous substances, including mixtures of laboratory chemicals D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 16 05 07 Yes 0.06
discarded inorganic chemicals consisting of or containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Remondis,17HRO03004,Niederlassung Bramsche,Am kanal 9,Bramsche,49565,Germany
niederlassung Bramsche,am kanal 9,bramsche,49565,Germany
To Other Countries 16 05 07 Yes 2.77
discarded inorganic chemicals consisting of or containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 16 05 07 Yes 0.0
discarded inorganic chemicals consisting of or containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services,BS5193IE,Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
Ellesmere Port Incinerator,Cleanaway Limted Bridges Road,Ellesmere Port,South Wirral Cheshire CH65 4 EQ,United Kingdom
To Other Countries 16 05 08 Yes 0.17
discarded organic chemicals consisting of or containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 16 05 08 Yes 0.63
discarded organic chemicals consisting of or containing dangerous substances R12 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 16 05 09 No 1.17
discarded chemicals other than those mentioned in 16 05 06, 16 05 07 or 16 05 08 D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 16 06 01 Yes 1.35 lead batteries R4 M Weighed Offsite in Ireland
KMK Metals Recycling Limited,W0113-03
Cappincur Industrial Estate,Daingean Road,Tullamore,Co Offaly,Ireland
KMK Metals Recycling Limited,W0113-03,Cappincur Industrial Estate,Daingean Road,Tullamore,Co. Offaly,Ireland
Cappincur Industrial Estate,Daingean Road,Tullamore,Co. Offaly,Ireland
Within the Country 16 06 04 No 0.83 alkaline batteries (except 16 06 03) R4 M Weighed Offsite in Ireland
KMK Metals Recycling Limited,W0113-03
Cappincur Industrial Estate,Daingean Road,Tullamore,Co Offaly,Ireland
KMK Metals Recycling Limited,W0113-03,Cappincur Industrial Estate,Daingean Road,Tullamore,Co. Offaly,Ireland
Cappincur Industrial Estate,Daingean Road,Tullamore,Co. Offaly,Ireland
To Other Countries 16 09 03 Yes 1.51 peroxides, for example hydrogen peroxide D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 16 10 02 No 18.68
aqueous liquid wastes other than those mentioned in 16 10 01 D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 16 10 01 Yes 2.53
aqueous liquid wastes containing dangerous substances D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 17 01 01 No 269.7 concrete R5 E Volume Calculation Offsite in Ireland
Cullen Excavations Ltd,WFP-WW-17-0003-03
Kilmullin,Kilcoole,Co. Wicklow,.,Ireland
Intel Ireland Ltd. AER 2017 Page 101 of 106
Within the Country 17 01 07 No 0.0
mixture of concrete, bricks, tiles and ceramics other than those mentioned in 17 01 06 R12 M Weighed Offsite in Ireland
Roadstone Wood Limited,WFP-DS-11-0005-01
Belgard Quarry,Fortunestown,Tallaght,Dublin 24,Ireland
Within the Country 17 02 03 No 0.0 plastic R12 M Weighed Offsite in Ireland
Greyhound Recycling and Recovery,W0205-01
Crag Avenue,Clondalkin Industrial Estate,Clondalkin,Dublin 22,Ireland
Within the Country 17 03 02 No 53.02
bituminous mixtures containing other than those mentioned in 17 03 01 R5 C Volume Calculation Offsite in Ireland
Roadstone Ltd,WFP/MH/15/0002/01
Deerpark Quarry,Carrickdexter,Slane,Co. Meath,Ireland
Within the Country 17 04 01 No 0.0 copper, bronze, brass R12 M Weighed Offsite in Ireland
Clearcircle (formally HMP),WFP-LKC-11-001-01
Ballysimon Road,Limerick,Limerick City,Ireland,Ireland
Within the Country 17 04 01 No 0.0 copper, bronze, brass R12 M Weighed Offsite in Ireland
A1 Metals/Hegartys Metal Processors (International) Ltd.,ATF WMP007E
.,Aeragar,Mountmellick,Co. Laois,Ireland
Within the Country 17 04 02 No 0.5 aluminium R13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 17 04 02 No 0.0 aluminium R12 M Weighed Offsite in Ireland
Hammond Lane Metal,WFP-DC-09-0013-01
Hammond Lane Metal,Pigeon house Road,Dublin 4,.,Ireland
Within the Country 17 04 05 No 0.0 iron and steel R12 M Weighed Offsite in Ireland
Hammond Lane Metal,WFP-DC-09-0013-01
Hammond Lane Metal,Pigeon house Road,Dublin 4,.,Ireland
Within the Country 17 04 07 No 0.0 mixed metals R12 M Weighed Offsite in Ireland
A1 Metals/Hegartys Metal Processors (International) Ltd.,ATF WMP007E
.,Aeragar,Mountmellick,Co. Laois,Ireland
Within the Country 17 05 04 No 5280.0
soil and stones other than those mentioned in 17 05 03 R5 M Weighed Offsite in Ireland
Cool Cat Plant Services Ltd,WFP/MH/16/002/01
Moynalvy,Summerhill,Co. Meath,.,Ireland
Within the Country 17 05 04 No 0.0
soil and stones other than those mentioned in 17 05 03 D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
To Other Countries 17 06 05 Yes 0.0
construction materials containing asbestos (18) D5 M Weighed Abroad
Rilta Environmental Ltd.,Waste licence 192-02
Block 402 Greenogue Business Park ,Rathcoole,.,Dublin,Ireland
Grosenasper Entsorgungsgesellschaft mbH &Co KG,A60F00507,Bimohler Str. 57A,DE 24623,Grosenasp,Germany,Germany
Bimohler Str. 57A,DE 24623,Grosenasp,Germany,Germany
Within the Country 17 09 04 No 33.12
mixed construction and demolition wastes other than those mentioned in 17 09 01, 17 09 02 and 17 09 03 R13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 17 09 04 No 7.5
mixed construction and demolition wastes other than those mentioned in 17 09 01, 17 09 02 and 17 09 03 R13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 18 01 03 Yes 1.44
wastes whose collection and disposal is subject to special requirements in order to prevent infection R3 M Weighed Offsite in Ireland SRCL Limited,W0055-02
430 Beech Raod,Western Industrial Estate,Naas Road,Dublin 12,Ireland
SRCL Limited,W0055-02,430 Beech Raod,Western Industrial Estate,Naas Road,Dublin 12,Ireland
430 Beech Raod,Western Industrial Estate,Naas Road,Dublin 12,Ireland
Within the Country 19 09 05 No 58.82 saturated or spent ion exchange resins R12 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 19 09 05 No 10.5 saturated or spent ion exchange resins R12 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 01 01 No 5.0 paper and cardboard R13 M Weighed Offsite in Ireland
Dublin City Council MRF (Panda Merrywell),W0238-01
Merrywell,Ballymount Road Lower,Dublin City Council MRF,22,Ireland
Within the Country 20 01 01 No 7.49 paper and cardboard R13 M Weighed Offsite in Ireland
Irish Packaging Recycling Ltd.,W0263-01
Ballymount Road,.,Walkinstown,Dublin 12,Ireland
Intel Ireland Ltd. AER 2017 Page 102 of 106
Within the Country 20 01 02 No 20.34 glass R13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 01 08 No 110.0 biodegradable kitchen and canteen waste R13 M Weighed Offsite in Ireland
Ormonde Organics Limited,WFP-WD-13-0001-01
Ormonde Organics Limited,Killowen,Portlaw,Co. Waterford,Ireland
Within the Country 20 01 08 No 64.66 biodegradable kitchen and canteen waste R13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 01 08 No 9.71 biodegradable kitchen and canteen waste R13 M Weighed Offsite in Ireland Panda,W0039-02
Ballymount Cross,Tallaght,Dublin,24,Ireland
Within the Country 20 01 08 No 1.52 biodegradable kitchen and canteen waste R13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 01 21 Yes 2.06
fluorescent tubes and other mercury-containing waste R5 M Weighed Offsite in Ireland
Irish lamps Recycling Co. Ltd.,WFP-KE-08-0348-01
Woodstock Ind. Estate ,Kilkenny Road ,Athy,Co. Kildare,Ireland
Irish lamps Recycling Co. Ltd.,WFP-KE-08-0348-01,Woodstock Ind. Estate ,Kilkenny Road ,Athy,Co. Kildare,Ireland
Woodstock Ind. Estate ,Kilkenny Road ,Athy,Co. Kildare,Ireland
Within the Country 20 01 25 No 10.21 edible oil and fat R13 M Weighed Offsite in Ireland Frylite,WFP-DS-10-0009-01
Unit 12 Ballymount Industrial Estate,Ballymount,Dublin 12,.,Ireland
Within the Country 20 01 33 Yes 0.18
batteries and accumulators included in 16 06 01, 16 06 02 or 16 06 03 and unsorted batteries and accumulators containing these batteries R4 M Weighed Offsite in Ireland
KMK Metals Recycling Limited,W0113-03
Cappincur Industrial Estate,Daingean Road,Tullamore,Co Offaly,Ireland
KMK Metals Recycling Limited,W0113-03,Cappincur Industrial Estate,Daingean Road,Tullamore,Co. Offaly,Ireland
Cappincur Industrial Estate,Daingean Road,Tullamore,Co. Offaly,Ireland
Within the Country 20 01 35 Yes 0.09
discarded electrical and electronic equipment other than those mentioned in 20 01 21 and and 20 01 23 containing hazardous components R5 M Weighed Offsite in Ireland
Irish lamps Recycling Co. Ltd.,WFP-KE-08-0348-01
Woodstock Ind. Estate ,Kilkenny Road ,Athy,Co. Kildare,Ireland
Irish lamps Recycling Co. Ltd.,WFP-KE-08-0348-01,Woodstock Ind. Estate ,Kilkenny Road ,Athy,Co. Kildare,Ireland
Woodstock Ind. Estate ,Kilkenny Road ,Athy,Co. Kildare,Ireland
Within the Country 20 01 36 No 0.0
discarded electrical and electronic equipment other than those mentioned in 20 01 21, 20 01 23 and 20 01 35 R4 M Weighed Offsite in Ireland
A1 Metals/Hegartys Metal Processors (International) Ltd.,ATF WMP007E
.,Aeragar,Mountmellick,Co. Laois,Ireland
Within the Country 20 01 36 No 0.85
discarded electrical and electronic equipment other than those mentioned in 20 01 21, 20 01 23 and 20 01 35 R12 M Weighed Offsite in Ireland
Electronic Recycling,WFP-DC-09-0015-01
Unit 20 Jamestown Business Park,Jamestown Road,Finglas,Dublin 11,Ireland
Within the Country 20 01 36 No 0.0
discarded electrical and electronic equipment other than those mentioned in 20 01 21, 20 01 23 and 20 01 35 D5 M Weighed Offsite in Ireland
A1 Metals/Hegartys Metal Processors (International) Ltd.,ATF WMP007E
.,Aeragar,Mountmellick,Co. Laois,Ireland
Within the Country 20 01 38 No 2.08 wood other than that mentioned in 20 01 37 R12 M Weighed Offsite in Ireland Greenstar Bray,W0053-03
Greenstar Limited,Bray Depot,Fassaroe,Bray Co. Wicklow,Ireland
Within the Country 20 01 36 No 21.06
discarded electrical and electronic equipment other than those mentioned in 20 01 21, 20 01 23 and 20 01 35 R12 M Weighed Offsite in Ireland
Rehab Recycle,WFP-DS-10-0008-05
Unit 77,Broomhill Road,Tallaght,Dublin 24,Ireland
Within the Country 20 01 38 No 168.57 wood other than that mentioned in 20 01 37 R12 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 01 38 No 247.62 wood other than that mentioned in 20 01 37 R12 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 01 38 No 0.52 wood other than that mentioned in 20 01 37 R12 M Weighed Offsite in Ireland Panda Cappagh,W0261-02
Cappagh Road,Finglas,Dublin,11,Ireland
Within the Country 20 01 40 No 13.36 metals R13 M Weighed Offsite in Ireland
KMK Metals Recycling Limited,W0113-03
Cappincur Industrial Estate,Daingean Road,Tullamore,Co Offaly,Ireland
Within the Country 20 01 40 No 17.12 metals R13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Intel Ireland Ltd. AER 2017 Page 103 of 106
Within the Country 20 01 40 No 187.72 metals R13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 01 40 No 0.28 metals R12 M Weighed Offsite in Ireland Greenstar Bray,W0053-03
Greenstar Limited,Bray Depot,Fassaroe,Bray Co. Wicklow,Ireland
within the Country 20 02 01 No 7.58 biodegradable waste R13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 02 01 No 0.0 biodegradable waste R3 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 02 01 No 56.36 biodegradable waste R13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 01 No 1.44 mixed municipal waste D5 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 03 01 No 0.29 mixed municipal waste D13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 03 01 No 2.65 mixed municipal waste R13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 03 01 No 0.0 mixed municipal waste R12 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 01 No 3.93 mixed municipal waste R13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 01 No 0.44 mixed municipal waste D13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 01 No 20.55 mixed municipal waste R5 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 01 No 13.0 mixed municipal waste R5 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 03 01 No 2.28 mixed municipal waste D5 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 07 No 0.24 bulky waste D13 M Weighed Offsite in Ireland Panda,W0039-02
Ballymount Cross,Tallaght,Dublin,24,Ireland
Within the Country 20 03 07 No 2.14 bulky waste R12 M Weighed Offsite in Ireland Panda,W0039-02
Ballymount Cross,Tallaght,Dublin,24,Ireland
Within the Country 20 03 07 No 0.65 bulky waste D13 M Weighed Offsite in Ireland
Irish Packaging Recycling Ltd.,W0263-01
Ballymount Road,.,Walkinstown,Dublin 12,Ireland
Within the Country 20 03 07 No 5.84 bulky waste R12 M Weighed Offsite in Ireland
Irish Packaging Recycling Ltd.,W0263-01
Ballymount Road,.,Walkinstown,Dublin 12,Ireland
Within the Country 20 03 07 No 9.25 bulky waste D13 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Within the Country 20 03 07 No 83.21 bulky waste R12 M Weighed Offsite in Ireland
Greenstar Millennium Park,W0183-01
Millennium Park,Cappagh Road,Ballycoolin,Dublin 11,Ireland
Intel Ireland Ltd. AER 2017 Page 104 of 106
Within the Country 20 03 07 No 76.79 bulky waste D13 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 07 No 691.07 bulky waste R12 M Weighed Offsite in Ireland
Greenstar West Dublin,W0188-01
MRF West Dublin Site 14b 3A,Greenogue Industrial Estate,Rathcoole,Dublin,Ireland
Within the Country 20 03 07 No 0.11 bulky waste D13 M Weighed Offsite in Ireland
Dublin City Council MRF (Panda Merrywell),W0238-01
Merrywell,Ballymount Road Lower,Dublin City Council MRF,22,Ireland
Within the Country 20 03 07 No 0.95 bulky waste R12 M Weighed Offsite in Ireland
Dublin City Council MRF (Panda Merrywell),W0238-01
Merrywell,Ballymount Road Lower,Dublin City Council MRF,22,Ireland
Within the Country 20 01 01 No 0.91 paper and cardboard R13 M Weighed Offsite in Ireland
Shred-It ROI Limited,WFP-DS-17-0002-02
Unit 6A Westgate Business Park,Ballymount road Upper,Dublin ,24,Ireland
Within the Country 20 01 08 No 20.07 biodegradable kitchen and canteen waste R13 M Weighed Offsite in Ireland
Dublin City Council MRF (Panda Merrywell),W0238-01
Merrywell,Ballymount Road Lower,Dublin City Council MRF,22,Ireland
To Other Countries 07 01 03 Yes 0.98
organic halogenated solvents, washing liquids and mother liquors D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 08 04 09 Yes 0.01
waste adhesives and sealants containing organic solvents or other dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
Within the Country 11 01 10 No 1056.55
sludges and filter cakes other than those mentioned in 11 01 09 R5 M Weighed Offsite in Ireland
Gannon Eco,WFP-WM-2009-0007-01
Ballinagore, ,Co.Westmeath, ,Ireland
Within the Country 11 01 11 Yes 1.3
aqueous rinsing liquids containing dangerous substances D13 M Weighed Offsite in Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Veolia Environmental Services Technical Solutions Ltd,W0050-02,Corrin,Fermoy,Co. Cork,.,Ireland
Corrin,Fermoy,Co. Cork,.,Ireland
Within the Country 15 02 03 No 2.64
absorbents, filter materials, wiping cloths and protective clothing other than those mentioned in 15 02 02 R1 M Weighed Offsite in Ireland
Lagan Cement Limited,P0487-06
Killaskillen,Kinnegad,.,Co. Meath,Ireland
Within the Country 16 06 05 No 0.64 other batteries and accumulators R4 M Weighed Offsite in Ireland
KMK Metals Recycling Limited,W0113-03
Cappincur Industrial Estate,Daingean Road,Tullamore,Co Offaly,Ireland
To Other Countries 16 10 01 Yes 1.03
aqueous liquid wastes containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 20 01 27 Yes 0.5
paint, inks, adhesives and resins containing dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 15 02 02 Yes 1.53
absorbents, filter materials (including oil filters not otherwise specified), wiping cloths, protective clothing contaminated by dangerous substances D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
Sava GmbH & Co. Kg,A51G00508,Osterweute 125541,.,Brunsbuttel,.,Germany
Osterweute 125541,.,Brunsbuttel,.,Germany
To Other Countries 16 05 09 No 0.0
discarded chemicals other than those mentioned in 16 05 06, 16 05 07 or 16 05 08 D10 M Weighed Abroad
Veolia Environmental Services Technical Solutions Ltd,W0050-02
Corrin,Fermoy,Co. Cork,.,Ireland
* Select a row by double-clicking the Description of Waste then click the delete button
Link to previous years waste data
Intel Ireland Ltd. AER 2017 Page 105 of 106
Link to previous years waste summary data & percentage changeLink to Waste Guidance
Intel Ireland Ltd. AER 2017 Page 106 of 106