Integrity in Aging Structures - Engineers Australia...Integrity in Aging Structures Join the...

1
Integrity in Aging Structures Join the Gladstone Regional Group for an insighul presentaon into the structural integrity system being used at the RG Tanna Coal Terminal. 4.45 – 6.00pm | Thursday 4 April 2019 CQ University, Gladstone Marina Room 1.29 Building 603 (Leo Zussino Building) Bryan Jordan Drive, Gladstone, QLD 4680 REGISTER NOW engineersaustralia.org.au An insight into RG Tanna Coal Terminal’s integrity system FOR MORE INFORMATION TICKETS (INCL. GST) The first stage of the Gladstone Ports Corporaon RG Tanna Coal Terminal commenced operaon in 1976. To ensure long me design life of these assets, a comprehensive structural integrity system is essenal. Guided by Galdstone Ports Corporaon’s Tony Micalizzi, this presentaon will provide an insight into the structural integrity system that is currently employed at RG Tanna Coal Terminal. Gladstone Ports Corporaon has developed procedures to inspect and classify the integrity of the conveyor gantry structures to extend the life of the structures. Using these procedures, Frost Engineers have been carrying out inspecons on the GPC Structures, assessing condion and recommending remedial repairs, based on their condion. Member FREE Student Member FREE Non-member $30 Please contact EAQ Events on 1300 653 113 or EAQEvents @engineersaustralia.org.au PRESENTED BY TONY MICALIZZI

Transcript of Integrity in Aging Structures - Engineers Australia...Integrity in Aging Structures Join the...

Page 1: Integrity in Aging Structures - Engineers Australia...Integrity in Aging Structures Join the Gladstone Regional Group for an insightful presentation into the structural integrity system

Integrity in Aging Structures

Join the Gladstone Regional Group for an insightful presentation into the structural integrity system being used at the RG Tanna Coal Terminal.

4.45 – 6.00pm | Thursday 4 April 2019CQ University, Gladstone MarinaRoom 1.29 Building 603 (Leo Zussino Building) Bryan Jordan Drive, Gladstone, QLD 4680

REGISTER NOWengineersaustralia.org.au

An insight into RG Tanna Coal Terminal’s integrity system

FOR MORE INFORMATION

TICKETS (INCL. GST)

The first stage of the Gladstone Ports Corporation RG Tanna Coal Terminal commenced operation in 1976. To ensure long time design life of these assets, a comprehensive structural integrity system is essential.

Guided by Galdstone Ports Corporation’s Tony Micalizzi, this presentation will provide an insight into the structural integrity system that is currently employed at RG Tanna Coal Terminal.

Gladstone Ports Corporation has developed procedures to inspect and classify the integrity of the conveyor gantry structures to extend the life of the structures. Using these procedures, Frost Engineers have been carrying out inspections on the GPC Structures, assessing condition and recommending remedial repairs, based on their condition.

Member FREE

Student Member FREE

Non-member $30

Please contact EAQ Events on

1300 653 113 or

EAQEvents @engineersaustralia.org.au

PRESENTED BY TONY MICALIZZI