© INTEGRITY IP PTY LTD VERSION: JULY 2017 1
INTEGRITY EDGE
Q u a l i t y A s s u r a n c e P r o g r a m m e PLUMBER:
SITE ADDRESS:
OHS
New contractors to complete TAC before commencement of work
(www.integritynewhomes.com.au/tradecontractorlogin
username: subcontractor; password: integrity)
Provide project manager with SWMS (where required) and general
induction numbers.
Ensure that you carry an Australian Standard Compliant, First Aid Kit in
your vehicle at all times when on an Integrity site – this kit should be
construction site & employee number appropriate.
IMPORTANT PLUMBING AND DRAINAGE NOTES/DETAILS
There are nine (9) pages of attached plumbing and drainage notes,
plans and summaries which form part of the Integrity Edge Plumber
requirements and are referred to by page number and title (stated in
Job Address title box) where relevant within the text below. These
requirements must be complied with where applicable for any job.
UNDERSLAB PLUMBING & DRAINAGE
Check measure all survey points.
All service trenches to be outside the zone of influence referred to on
slab engineering. If not possible advise Project Manager.
Date:
© INTEGRITY IP PTY LTD VERSION: JULY 2017 2
Please go to the relevant Council and amend Council records to your
name, on any job you have commenced.
Provide floor waste to all wet areas including powder rooms with
vanities and tiled laundries, but excluding separate wc’s without
basins/vanities.
If trenching is required (by others) after the drainage work is complete,
expose the pipes. Your drainage could be damaged if not visible.
Ensure stormwater cut into curb or pit.
Position overflow gullies under external taps.
Comply with “Plumbing and Drainage Summary” information page 2/9
of attached plans and details for soil type/drainage grade guide (for
sites, A, S, M, H1, H2, E, P and P2).
Comply with “General Plumbing and Drainage Detail” information page
9/9 of attached plans details.
Where Polyvoid slabs are specified comply with “Plumbing and
Drainage Details Polyvoid Slabs” information page 7/9 of attached
plans and details.
For Highly Reactive (H) Sites provide overflow gullies under all external
taps.
For Moderately (M), Highly (H) & Extremely (E) reactive sites:
1. The base of trenches shall be sloped away from the building.
2. Trenches shall be backfilled with clay in the top 300mm within
1.5m of the building. The clay used for backfilling shall be
compacted.
3. Where pipes pass under the footing system, the trench shall be
backfilled full depth with clay. Alternatively, a plastic
membrane across the cross-section of the trench, taped to the
pipe and keyed into the sides and base of the trench may be
used.
4. Comply with “Plumbing and Drainage Notes RE: AS2870-2011”
information page 1/9 of attached plans and details.
Date:
© INTEGRITY IP PTY LTD VERSION: JULY 2017 3
5. Comply with “Plumbing and Drainage Details Strip
Footing/Pads, Slab on Ground, Waffle for M and M-D”
information page 5/9 of attached plans and details.
For Highly (H) & Extremely (E) reactive sites:
1. All horizontal penetrations of the edge beam or footings by
stormwater or sanitary drain pipe shall be lagged using closed-
cell polyethylene lagging.
2. The lagging shall be 20mm thick on class H1 sites and 40mm
thick on class H2 and class E sites. (Vertical penetrations do not
require lagging.) Sleeves allowing equivalent movements may
be used as an alternative to the lagging.
3. All drains/pipes emerging from under the building shall
incorporate flexible joints within 1m of the edge of the building
to accommodate a total range of differential movement in
any direction equal to 40-60mm (H1), 60-75mm (H2) & 75mm+
(E).
4. Comply with “Plumbing and Drainage Details Strip
Footing/Pads for P, Land Slip or Creep” information page 3/9
of attached plans and details.
5. Comply with “Plumbing and Drainage Details Strip
Footing/Pads for H1-D, H2-E, H2-D, E-D” information page 4/9
of attached plans and details.
6. Comply with “Plumbing and Drainage Details Slab on Ground
or Waffle for H1 & H1-D, H2-E, H2-D, E-D, P-D” information page
6/9 of attached plans and details.
ROUGH-IN
Flanges for wastes on timber floors to be routed flush with surface.
Laundry tub 410mm to the centre if adjacent to sliding glass door
(100mm gap at side).
All washing machine connections to be under laundry tub.
All bath tubs that are not pressed steel to be supported under by
plumber.
Date:
© INTEGRITY IP PTY LTD VERSION: JULY 2017 4
Fit cover plates over cut outs in kitchen and vanities shelves.
Rehau piping system (or equivalent) to be used for all water and gas
installations.
Check orders for applicable HWS if gas instantaneous recess boxes
need to be installed prior to external cladding, if heat pump ensure inlet
outlet pipes are in correct location for model of HWS.
Install roof flashing of penetrations before sheeting.
Rough-in blanking spindles used must accept waterproof flange to be
fitted by waterproofer.
Down pipes to be installed as per the roof drainage design (including
location and qty).
Comply with “Down Pipe/Stormwater Details in Reactive Sites for H1, H1-
D, H2-E, H2-D, E-D, P-D” information page 8/9 of attached plans and
details.
Please clean out job and sweep where necessary before leaving or
back charges will follow from the next trade or the Project Manager.
FIT-OFF
Run all taps for 5-10 minutes to confirm drainage is operative with no
blockages.
Confirm tempering valves are suitable for HWS (if applicable).
Ensure copper or brass olives (not nylon) & copper pipe used on flow
and return to solar panels. (if applicable)
Chrome tube to be used on inlet to cisterns (no flexible connections).
Replace all shelving under vanities and kitchens that have been
removed to connect drainage.
Ensure all access holes are cut for dishwasher connections and washing
machine connections as required.
Date:
© INTEGRITY IP PTY LTD VERSION: JULY 2017 5
It is the plumber’s responsibility to commission the hot water system and
the rainwater pump system to ensure correct operation prior to leaving
site. This may mean another visit to site to check appliances operating
correctly.
Record the serial number of the HWS here _________________________.
Water filter to be installed horizontally above melamine shelf in kitchen
in accordance with suppliers details.
Provide copies of all paperwork relating to council inspections and
the dates of inspection plus stormwater and sewer diagram at the
end of the job.
Cut off yard drainage points to a maximum height which will allow
landscaping to fall 50mm per 1 meter away from the building and
water to enter the drain (drain point not to be left higher than this).
Provide certificate confirming the hot water tempering valve has
been installed in accordance with the Australian standard.
Ensure when you leave, the house is secure. If not, you will be liable for
theft and any damage that may be caused.
Complete and sign Integrity Edge and submit with invoice at end of
job.
Signature: _____________________________________
Date: _________________________________________
Print Name: ___________________________________
Invoice No: ____________________________________
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
PLUMBING & DRAINAGE NOTESRE: AS 2870-2011
1
(c) During construction, water run-off shall be collected and channelled away from the building.
(d) Excavations near the edge of the footing system shall be backfilled in such a way as to prevent access of water to the foundation as described in Clause 5.6.3(b).
NOTES: 1 For example, excavations should be backfilled above or adjacent to the footing with moist clay
compacted by hand-rodding or tamping. 2 Porous material such as sand, gravel or building rubble should not be used.
(e) Water shall not be allowed to pond in the trenches.
Appendix B
B2.3 Classes M, H1, H2 and E sites
Sites classified as M, H1, H2, or E should be maintained at essentially stable moisture conditions and extremes of wetting and drying prevented. This will require attention to the following:
(a) Drainage of the site.The site should be graded or drained so that water cannot pond against or near the building. The ground immediately adjacent to the building should be graded to a uniform fall of 50 mm minimum away from the building over the first metre. The subfloor space for buildings with suspended floors should be graded or drained to prevent ponding where this may affect the performance of the footing system. The site drainage recommendations should be maintained for the economic life of the building.
(d) Repair of leaksLeaks in plumbing, including stormwater and sewerage drainage, should be repaired promptly.
Plumbing requirements . . .Clause 5.6.4 Buildings on highly or extremely reactive sites shall be provided with a system of plumbing detailed in accordance with the following:
(a) Penetrations of the edge beams of a raft and perimeter strip footings shall be avoided where practicable, but where necessary shall be detailed to allow for movement. Closed-cell polyethylene lagging shall be used around all stormwater and sanitary plumbing drain pipe penetrations through footings. The lagging shall be a minimum of 20 mm thick on Class H1 sites and 40 mm thick on Class H2 and Class E sites.
Vertical penetrations do not require lagging.
NOTE: Sleeves allowing equivalent movements may be used as an alternative to the lagging.
(b) Drains attached to or emerging from underneath the building shall incorporate flexible joints immediately outside the footing and commencing within 1 m of the building perimeter to accommodate a total range of differential movement in any direction equal to the estimated characteristic surface movement of the site (ys ). In the absence of specific design guidance, the fittings or other devices that are provided to allow for the movement shall be set at the mid-position of their range of possible movement at the time of installation, so as to allow for movement equal to 0.5ys in any direction from the initial setting. This requirement applies to all stormwater and sanitary plumbing drains and discharge pipes.
(d) Drainage under a slab shall be avoided where practicable.
NOTES: 1 Pipes may be encased in concrete or in recesses in the slab when provided with flexible joints at the
exterior of the slab.2 Methods used should comply with the AS/NZS 3500 series.
Section 6.6
Additional Requirements for Moderately, Highly and Extremely Reactive Sites
For stiffened rafts, waffle rafts, or strip footings on moderately, highly and extremely reactive sites, the following requirements apply to the building services and footing system in addition to the requirements of Clauses 6.4 and 6.5:
(a) Where the design of the footing system relies on particular detailing of masonry construction to minimize any damage caused by foundation movement, that detailing shall be included on the drawings.
(b) Penetrations of the edge beam and footing by drain pipes shall be sleeved using closed-cell polyethylene lagging or similar.
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
PLUMBING & DRAINAGE SUMMARY
2
TABLE : SP 26911SOIL TYPE WITH DRAINAGE AND STORM WATER GRADE SUMMARY
NOTE: Must be read in conjunction with Storm Plastics “Under Slab Guidelines”
AS2870-2011 CLASSIFICATION
ONSITE SOIL CONDITIONS
DIFFERENTIAL MOVEMENT
SEWER DRAINAGE
GRADE MAXIMUM
STORM WATER GRADE
MAXIMUM
SWIVEL* WITH (50mm
expansion)SWIVEL/COMBO*
(100mm Expansion)
EXPANDER* JOINTS (150mm expansionThis unit absorbs developing pipe
twist)
DRAWING NUMBER
FOUNDATIONTYPE
A Most Sand & Rock sites 0 – 10mm
1:60 1:100Not necessary
Not necessary Not necessaryN/a
All TypesS Slightly reactive Soils 10 – 20mm
M Moderately reactive Soils 20 – 40mm As per AS2870
Single unit Page 5
H1 Highly Reactive Soils 40 – 60mm
1:40 1:60/1:40
As per AS 3500.5 using 2
Swivel units outside and an
Expanda on every riser
Not applicable to suspended sub
floors
As necessary
Within 1 Mtr of House internal
footprint and every 6mtrs
Page 6 WAFFLE
H2 Very Highly Reactive Soils 60 – 75mm
Every Riser…unless suspended
All Junctions & Bends
As per above Differential Movement
…unless suspended
Page 4 Strip FootingsE Extremely Reactive
Soils 75mm +
PSoils affected by
Abnormal Moisture Conditions and Trees
20mm+As Per above Differential Movement
As Per above
Differential Movement
Page 7 Polyvoid Strip Pad
NOTE: Engineer or Local Authority details take precedence over this table
RATIO FALL IN 10 Mtrs ANGLE GRADE %1:300 33mm .19° .331:200 50mm .28° .51:100 100mm .57° 1.01:80 125mm .71° 1.251:60 167mm .95° 1.61:50 200mm 1.14° 2.01:40 250mm 1.43° 2.5This Unit absorbs any developing Pipe Twist or Torque caused by Soil movement
* Unless otherwise specified, these expansion Joints must be set at 50% of total Expansion ability as per AS2870-2011(Clause 5.6.4(b))
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
Ground Level
WP Trentini
Manufactured under a quality system certified as complyingwith ISO 9001 by an accredited certification body
Please refer to Storm Plastics Table No. SP- 1 for additional details on flow gradients and installation
March 2012
Class - P : SOIL CLASSIFICATION
Poly Vinyl Chloride - PVC
AS/NZS 2870-2011COMPANY STORM PLASTICS (SA) Pty Ltd
Residential Installation Guide ONLY for use ofMechanical Expansions Joints in Reactive Soils.
1:50 (200mm Fall in 10 Mtrs)
NOT DRAWN TO SCALEDrawing No.SP 105A
PIPE MATERIALGRADE
SOILMOVEMENTOR SLIP..
Land Slip or Creep
SWIVEL JOINT(with 50mm Expansion) CODE :SJ10015
AS2870-2011 is themost radical changeto interpreting soils & house engineering we have seen since 1986 and several trades will need to know what is in it and how to apply it.
ArticulatedMovement
Reactive Soils
Reactive Soils
Clause 2.3 : Hangers and Clips: Hangers and Clips shall be corrosion resistant for the intended environment.Sliding Joints, pipe hangers and clips shall be constructed so that, when fully tightened, longitudinal movement of the pipe ispossible without damage to the pipe or fitting.Anchor clips for fixed points shall be constructed so that, when fully tightened, the fitting or pipe is securely and evenly clamped to prevent movement. Care shall be taken to ensure that pipes and fittings are not distorted by over tightening.
AS/NZS 2032-2006,
Clause 3.7.2 VibrationVibration of the pipe (e.g. at connections to water pumps) shall be avoided andwhere necessary, flexible couplings shall be installed to minimize transmission ofvibration to the pipe work.
AS/NZS 2032-2006Clause 3.7.1 Provision forExpansion and contraction.
Downpipes do not normallyneed special provision forexpansion and contraction.However, when a downpipe is connected to a Stormwater pipe, or otherwise restrainedat the discharge end, provisions shall be made Downpipeto allow the pipe to expand and contract
Clause 4.2.2 (g)Solvent Cement JointingAllow the joints to curefor 24hrs. Do not fill thepipeline with water untilat least 1 h after makingthe last joint. Do notpressurize for at least24 h after making thelast joint.
AS/NZS 2032-2006 Clause 6.4.2.2 (a)Expansion joints provided where distancebetween fixed points exceed 2 metres (cold pipelines)
2 M+
Expanda JointDW 100150
Fixed Points
Fixed Point
Expanda JointsDW 100150
AS/NZS 2032-2006 Clause 3.7.1Provision for Expansion and Contraction
AS/NZS 2032-2006 Cla.6.4.2.4 (b)Expansion Joint at change of direction in graded lines.
AS/NZS 2032-2006 Clause 6.4.2.4 (a)Expansion Joint at connection to stack
Fixed Point
PipeInsert
AS 2870-2011
Twin Swivelsallow forarticulatedmovement.
Reactive Soils
Expansion and Swivel Joints every6 Mtrs to handle 10mm slip per rain event.Total movement = 150mm. (+/- 75mm)
ELEVATION
Trench GradeThis Swivel cushionspotential soil movement pressure on the 90° elbow caused initially by the trench grade.
PLUMBING & DRAINAGE DETAILS STRIP FOOTING/PADS FOR P, LAND SLIP OR CREEP
3
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
SWIVEL JOINT(with 50mm Expansion)IO breakage protection
Ground Level
All Lagging = 40mm thick in H2+ class soils
All Footing penetrations in middle of edge beam thickness.
WP Trentini
Manufactured under a quality system certified as complyingwith ISO 9001 by an accredited certification body
Back fill as perAS 2870-2011
Y = 45 deg for Firm CLAYSY = 30 deg for SAND
For further clarificationand other soil typessee Clause/Figure 4.15.2AS/NZS 3500.5 Draft.
Ensure Trench doesnot remove supportfrom footings.(See insert above)
=Y
X
X
If X exceeds 1000mmall junctions needexpansions joints/swivels
Add another Joint if pipeexceeds 6 mtrs.in length
Please refer to Storm Plastics Table No. SP -1 for additional details on flow gradients and installation
July 2011
Class H2 /E - 75 + mm Differential Movement
SOIL CLASSIFICATION
Poly Vinyl Chloride - PVC
AS 2870-2011COMPANY STORM PLASTICS (SA) Pty Ltd
Residential Installation Guide ONLY for use ofMechanical Expansions Joints in Reactive Soils.
1:50 (200mm Fall in 10 Mtrs)
NOT DRAWN TO SCALEDrawing No.SP 101A
PIPE MATERIALGRADE
LAGGED PIPEWORK ON 45 Deg SYSTEM
Strip Footings with stumps or pads
45º
Firm clay
TrenchDrain
Pier
Insert Code: SJ10015
Additional Pier depthunder Footings thatalign a trench, allowsthe trench to be closerwithout underminingconcerns. Use the correct Angle of Repose per soils.
FootingEXPANDA Joints on allhorizontal Drains tomaintain Grade(Code: DW 100150)
as per AS 2870-2011 Clause 5.6.4 (a)
PLUMBING & DRAINAGE DETAILS STRIP FOOTING/PADS FOR H1-D, H2, E, H2-D, E-D
4
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1.5m OF THE BUILDING. THE CLAY USED FOR BACKFILLING SHALL BE COMPCATED. WHERE PIPES PASS UNDER THE FOOTING SYSTEM THE TRENCH SHALL BE BACKFILLED FULL DEPTH WITH CLAY OR CONCRETE TO ACT AS A BARRIER TO THE INGRESS OF WATER BENEATH THE FOOTING SYSTEM. ALTERNATIVELY USE A SIMILAR ARRANGEMENT TO DETAIL "A" (SHOWN ON SHEET 7) OR PROVIDE A PLASTIC MEMBRANE ACROSS THE CROSS- SECTION OF THE TRENCH TAPED TO THE PIPE AND KEYED INTO THE SIDES AND BASE OF THE TRENCH MAY BE USED
1500 MIN.
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
SWIVEL JOINT(with 50mm Expansion) position for IO protection Recommended
Ground Level
All Lagging = 20mm thick in M class soils as per AS 2870-2011 Clause 5.6.4 (a)
All Footing penetrations in middle of edge beam thickness.
WP Trentini
AS2870-2011 is the most radical change to interpreting soils and house engineering we have seen since 1986 and several trades will need to know what is in it and how to apply it.
Manufactured under a quality system certified as complyingwith ISO 9001 by an accredited certification body
Back fill as perAS 2870-2011
Y = 45 deg for CLAYSY = 30 deg for SANDFor further clarificationand other soil typessee Clause/Figure 4.15.2AS/NZS 3500.5 Draft
Ensure Trench doesnot remove supportfrom footings.(See Insert above)=Y
X
X
If X exceeds 1000mmall junctions needexpansions joints/swivels
Add another Jointl if pipeexceeds 6 mtrs.in lengthPlease refer to Storm Plastics Table No. SP-1 for additional details on flow gradients and installation
July 2011
Class M - 20 - 40 mm Differential Movement
SOIL CLASSIFICATION
Poly Vinyl Chloride - PVCAS 2870-2011COMPANY STORM PLASTICS (SA) Pty LtdResidential Installation Guide ONLY for use ofMechanical Expansions Joints in Reactive Soils.
1:50 (200mm Fall in 10 Mtrs)
NOT DRAWN TO SCALEDrawing No. SP 101
PIPE MATERIALGRADE
LAGGED PIPEWORK ON 45 Deg SYSTEMStrip Footings with stumps or pads
45º
Firm clayTrench Drain
Pier
InsertAdditional Pier depthunder Footings thatalign a trench, allowsthe trench to be closerwithout underminingconcerns. Use the correct Angle of Repose per soils.
Footing Code: SJ10015
PLUMBING & DRAINAGE DETAILS STRIP FOOTING/PADS, SLAB ON GROUND, WAFFLE FOR M & M-D
5
XXX
1500 MIN.
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1.5m OF THE BUILDING. THE CLAY USED FOR BACKFILLING SHALL BE COMPCATED. WHERE PIPES PASS UNDER THE FOOTING SYSTEM THE TRENCH SHALL BE BACKFILLED FULL DEPTH WITH CLAY OR CONCRETE TO ACT AS A BARRIER TO THE INGRESS OF WATER BENEATH THE FOOTING SYSTEM. ALTERNATIVELY USE A SIMILAR ARRANGEMENT TO DETAIL "A" (SHOWN ON SHEET 7) OR PROVIDE A PLASTIC MEMBRANE ACROSS THE CROSS- SECTION OF THE TRENCH TAPED TO THE PIPE AND KEYED INTO THE SIDES AND BASE OF THE TRENCH MAY BE USED
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
PERIMETER DRAINAGESLAB ON GROUND OR WAFFLE H1, H1-D, H2-E, H2-D, E-D, P-D SOILSSOIL MOVEMENT FROM 65-150mm
UNDER SLAB/ZERO LOT ALIGNMENT DRAINAGESLAB ON GROUND OR WAFFLE H1, H1-D, H2-E, H2-D, E-D, P-D SOILSSOIL MOVEMENT FROM 65-150mm
Expansion Joint
Inspection OpeningOverflow Relief Gully
VentBasinBathShowerFloor Waste GullyCleaner's SinkWater ClosetTroughSink
VBBTHSHRFWGCSWCTRS
Swivel / Expansion Joint
Expansion Joint Bend
Inspection Opening to SurfaceIOS
MASTER LEGEND
PLUMBING & DRAINAGE DETAILS SLAB ON GROUND OR WAFFLE FOR H1 & H1-D, H2-E,H2-D,E-D,P-D
6
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
SWIVEL JOINTas per AS 2870 2011
300 mm
WP Trentini
AS2870-2011 is the most radical change to interpreting soils and house engineering we have seen since 1986 and several trades will need to know what is in it and how to apply it.
Expands 100mmCOMBO JOINT 15 15
SWIVELS IN ALL DIRECTIONSManufactured under a quality system certified as complyingwith ISO 9001 by an accredited certification body
Clay Plug or Waterproof Membraneas in AS 2870 2011 Clause 5.6.3 (c)
As per AS 2870 2011Clause 5.6.4 (b)
Slab Floor or Waffle Rafts. Due to location and tosafeguard life of riser,we a ComboJoint be considered herethat allows 100mm expansion(see bottom drawing)recommend
X
X = Edge Beam + 125mm
CODE: SJ100 BENDCOMBO
Code: SJ10015
July 2011
Class M - Slab or Waffle Rafts 20 - 40mm Differential Movement SOILCLASSIFICATION
Poly Vinyl Chloride - PVCAS 2870-2011COMPANY STORM PLASTICS (SA) Pty Ltd Residential Installation Guide ONLY for use ofMechanical Expansions Joints in Reactive Soils.
1:50 (200mm Fall in 10 Mtrs)
NOT DRAWN TO SCALEDrawing No. SP 100
PIPE MATERIALDRAIN GRADE
UNDER SLAB DRAINAGEPlease refer to Storm Plastics Table No. SP 1 for additional details on flow gradients and installation
We anadditional Swivel hereto protect the IOrecommend
1 Mtr
PLUMBING & DRAINAGE DETAILS SLAB ON GROUND & WAFFLE FOR M & M-D
1500 MIN.
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1.5m OF THE BUILDING. THE CLAY USED FOR BACKFILLING SHALL BE COMPCATED. WHERE PIPES PASS UNDER THE FOOTING SYSTEM THE TRENCH SHALL BE BACKFILLED FULL DEPTH WITH CLAY OR CONCRETE TO ACT AS A BARRIER TO THE INGRESS OF WATER BENEATH THE FOOTING SYSTEM. ALTERNATIVELY REF TO DETAIL "A" OR PROVIDE A PLASTIC MEMBRANE ACROSS THE CROSS- SECTION OF THE TRENCH TAPED TO THE PIPE AND KEYED INTO THE SIDES AND BASE OF THE TRENCH MAY BE USED
DETAIL ANOT TO SCALE
20 to 40 THICK BARRIER GRANULAR SODIUM BENTONITE FULL WIDTH AND HEIGHT OF TRENCH
G.L.
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1500mm OF THE BUILDING
7
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
July 2011
Class H1/H2 - Waffle Pad / Slab 40-75 mm Differential Movement
300 mm
SWIVEL JOINTS.(As per AS/NZS 3500 5 Draft)
Expands 100mm
COMBO JOINT 15 15SWIVELS IN ALL DIRECTIONS..ALLOWS FOR PIPE
MIS-ALIGNMENT AND SOIL EXPANSION
OR CONTRACTION.
Due to location of pipeand to safeguard life ofriser, we a Combo Joint beconsidered here that allows100mm expansion(see bottom drawing) recommend
AS2870-2011 is the most radical change to interpreting soils and house engineering we have seen since 1986 and several trades will need to know what is in it and how to apply it.
SOILCLASSIFICATION
Poly Vinyl Chloride - PVCAS 2870-2011COMPANY STORM PLASTICS (SA) Pty LtdResidential Installation Guide ONLY for use of
Mechanical Expansions Joints in Reactive Soils.
1:50 (200mm Fall in 10 Mtrs)
NOT DRAWN TO SCALE
Manufactured under a quality system certified as complyingwith ISO 9001 by an accredited certification body
Drawing No.SP 102
PIPE MATERIALDRAIN GRADE
UNDER SLAB DRAINAGE
W P Trentini
800 mm
XX = Edge beam width + 150mm minimum.
6 Mt max between expansion joints.
BEAMS OR RIBS AS REQUIRED
Please refer to Storm Plastics Table No. SP 1 for additional details on flow gradients and installation
Clay Plug ormembrane asAS2870 2011Clause 5.6.3 (c)
TENSION STRESS RELIEF EXPANDACODE : DW100150
TrenchPipe Bedding
>600 mm
CODE: SJ100 BENDCOMBO
Code: SJ10015
Expanda Jointson all horizontal drains to maintainGradeCode: DW100150
PLUMBING & DRAINAGE DETAILS SLAB ON GROUND, WAFFLE FOR H1& H2
8
1500 MIN.
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1.5m OF THE BUILDING. THE CLAY USED FOR BACKFILLING SHALL BE COMPCATED. WHERE PIPES PASS UNDER THE FOOTING SYSTEM THE TRENCH SHALL BE BACKFILLED FULL DEPTH WITH CLAY OR CONCRETE TO ACT AS A BARRIER TO THE INGRESS OF WATER BENEATH THE FOOTING SYSTEM. ALTERNATIVELY REF TO DETAIL A OR PROVIDE A PLASTIC MEMBRANE ACROSS THE CROSS- SECTION OF THE TRENCH TAPED TO THE PIPE AND KEYED INTO THE SIDES AND BASE OF THE TRENCH MAY BE USED
DETAIL ANOT TO SCALE
20 to 40 THICK BARRIER GRANULAR SODIUM BENTONITE FULL WIDTH AND HEIGHT OF TRENCH
G.L.
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1500mm OF THE BUILDING
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
Expands 100mm
COMBO JOINT 15 15SWIVELS IN ALL DIRECTIONS..ALLOWS FOR PIPE
MIS-ALIGNMENT AND SOIL EXPANSION
OR CONTRACTION.
AS2870-2011 is the most radical change to interpreting soils and house engineering we have seen since 1986 and several trades will need to know what is in it and how to apply it.
Manufactured under a quality system certified as complyingwith ISO 9001 by an accredited certification bodyW P Trentini July 2011
Class E- Waffle Pad / Slab75 + mm Differential Movement
SOILCLASSIFICATION
Poly Vinyl Chloride - PVCAS 2870-2011COMPANY STORM PLASTICS (SA) Pty LtdResidential Installation Guide ONLY for use of
Mechanical Expansions Joints in Reactive Soils.
1:50 (200 mm Fall in 10 Mtrs)
NOT DRAWN TO SCALEDrawing No.SP 102A
PIPE MATERIALDRAIN GRADE
UNDER SLAB DRAINAGE
CODE: SJ100 BENDCOMBO
Please refer to Storm Plastics Table No. SP 1 for additional details on flow gradients and installation
300 mm
SWIVEL JOINTS.(As per AS/NZS 3500 5 Draft)Due to location of pipeand to safeguard life ofriser, we a Combo Joint beconsidered here that allows100mm expansion(see bottom drawing) recommend
800 mm
XX = Edge beam width + 150mm minimum.
6 Mt max between expansion joints.
BEAMS OR RIBS AS REQUIRED
Clay Plug ormembrane asAS2870 2011Clause 5.6.3 (c)
TENSION STRESS RELIEF EXPANDACODE : DW100150 (recommended)
TrenchPipe Bedding
>600 mm
Code: SJ10015
Expanda Jointson all horizontal drains to maintainGradeCode: DW100150
PLUMBING & DRAINAGE DETAILS SLAB ON GROUND & WAFFLE FOR H1-D, H2, E, H2-D, E-D
9
1500 MIN.
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1.5m OF THE BUILDING. THE CLAY USED FOR BACKFILLING SHALL BE COMPCATED. WHERE PIPES PASS UNDER THE FOOTING SYSTEM THE TRENCH SHALL BE BACKFILLED FULL DEPTH WITH CLAY OR CONCRETE TO ACT AS A BARRIER TO THE INGRESS OF WATER BENEATH THE FOOTING SYSTEM. ALTERNATIVELY REF TO DETAIL A OR PROVIDE A PLASTIC MEMBRANE ACROSS THE CROSS- SECTION OF THE TRENCH TAPED TO THE PIPE AND KEYED INTO THE SIDES AND BASE OF THE TRENCH MAY BE USED
DETAIL ANOT TO SCALE
20 to 40 THICK BARRIER GRANULAR SODIUM BENTONITE FULL WIDTH AND HEIGHT OF TRENCH
G.L.
TRENCHES SHALL BE BACKFILLED WITH CLAY IN THE TOP 300mm WITHIN 1500mm OF THE BUILDING
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
88 Elbow(attached to Combo Extension)
Concrete Slab thickness as required
225mmStyrene
l w
1 S I o l
EXPANDABEND Expans on Joint
P C A / ZS 2 0
a h 2 2
Cod : DW100 02 0FF
730mmTrench Depth
For Extreme soilmovement ofup to 200mm(See chart)
POLYVOID SLAB SYSTEM
100mm PVC Pipe
To Suit Soil Class - M, H1, H1-D, H2, H2-D,(to 100mm) E, E-D (to 200mm), P (to 320mm)
Compress and install the fittings to 50% of the pertinent ys in wet conditions.
Manufactured under a quality system certified as complyingwith ISO 9001 by an accredited certification body
PRODUCT NAME
Poly Vinyl Chloride - PVC
COMPANY STORM PLASTICS (SA) Pty Ltd
NOT DRAWN TO SCALEDrawing No. SP 111
MATERIALDRAWING DATE
DIMENSIONS All dimensions shown are nominal in mm and subject to change without notice.
TRENCH BASE
SOIL ys M/M-D H1/H1-D H2/H2-D E/E-D P
DifferentialMovement Specified
20-40 40-60 60-75From 75+
Specification needed
From 75+Specification
needed
TotalProduct
Movement Range
0-100 0-100 0-100 0-200 0-320
Trench depth(Lowest end)
Approx350 350 350 730 830
Model&
Type of Joint
SwivelExpansionJoint BendCombo
ExpansionJoint BendCombo
Swivel SwivelExpansion Joint BendCombo
Swivel StraightExpanda with 100mm DW100100MM.
Swivel StraightExpanda with 220mmDW100220MM.
TrenchGrade
Recommended 1:60 1:50 1:50/1:40 1:40
i A 1 S o l
†
Combo
†
†
GROUND LEVEL
For POLYVOID Systems ONLY.
POLYVOID SLAB SYSTEM
9th August, 2012wPT
Expanda & Swivel Expansion products used in....
†
F w
W K 2 11 SA G al
100mm DWV M & F Expan ion Jo nt
P C U A / ZS 1 60
a c 0 12
C d : W 1 0 MF
F ow
L 1 A G bal
EXPANDABEND Expansion Joint
VC S N S 1 60
B c 0 / 2
Code DW10 90 30 F
100mm DWV PVC Pipe
ic M A 4 1 I o l
1 0mm DWV M & F E pans on Joint
P C - U S ZS 2 0
B t h / 2
o e D V 0 0 Fi W K 1 1
A o l
100mm DWV M & F Expansion Joint
VC - U S N S 2 0
t h 2 2
C e D V 0 5 MF
BA A A
A
C
B
C
100mm DWV PVC Pipe
830mmTrench Depth
For Extreme soilmovement ofup to 320mm(See chart)
Dw100100 Expanda
Dw100220 Expanda
350 mmTrench Depth
For Highly Reactive soilmovement ofup to 75 mm(See chart)
SwivelExpansionJoint + Bend Combo
Swivel ExpansionJoint plusStraight FemaleExpansion attachment.
(All dimensions include 50 + 40mm internal overlaps)
This group represents over 85% ofcommon differential soil movementfound in Australia.
This group represents approx 15%of extreme soil differential movementfound in Australia.
TRENCH BASE
TRENCH BASE
INSTALLATION GUIDE CHART IN DIFFERENT ys SOILS
The above information & dimensions are given as a GUIDE onlyand are subject to change dependant on site requirements.
PLEASE NOTE
NB. The above is based on the 225mm thick system. If using the 300mm POLYVOID system, reduce the Trench Depth by 100mm.
W K 1 1 S G l
1 0mm DWV & F xp n i n J i t
Suitsvariousjunctions
100mmExpansion
Male End
Male End
Please ensure that all fittings are installed ‘Expanded’ in dry conditions, as drawn.
PLUMBING & DRAINAGE DETAILS POLYVOID SLABS
10
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
DOWN PIPE/STORMWATER DETAILS IN REACTIVE SITESH1, H1-D, H2-E,H2-D,E-D,P-D
11
MEMBERProfessional Engineers
JOHN D'AMICI MIEAust CPEng NPER (316291)RPEQ (12014)
SIGNATURE
Client:Job Address:INH IE 1234
HEAD OFFICE: PO BOX 1566, COFFS HARBOUR NSW, 2450 PHONE NO. (02) 66 529 600 FAX NO. (02) 66 529 644 NOTE:- THESE PLANS ARE COPYRIGHT TO INTEGRITY IP PTY LTD AND MAY NOT BE USED WITHOUT PERMISSION
n/a / 12
N/A10/03/2012
INHDrawn:
Date:
Job Number:
Site Classification:
Page: Issue:
INH
Environment Exposure Classificayion: N/AWind rating: N/A
THROUGH SLAB
THROUGH SLAB - SHALLOW END
UNDER SLAB - SHALLOW END
I.P.Swivel Joints
Expanda JointsFOUNDATION
FLOOR TRAP
LAUNDRY
Expanda Joints
Swivel Joints
I.P.
LaggingAs per AustralianStandards
HEAVEDry Area
FOOTINGSExpansion Joint
Inspection OpeningOverflow Relief Gully
VentBasinBathShowerFloor Waste GullyCleaner's SinkWater ClosetTroughSink
VBBTHSHRFWGCSWCTRS
Swivel / Expansion Joint
Expansion Joint Bend
Inspection Opening to SurfaceIOS
MASTER LEGEND
GENERAL PLUMBING & DRAINAGE DETAIL