    NTEGRATION OF RENEWABLE ENERGY

    SYSTEMS

    By Rajashekar P. MandiEnergy Conservation & Development Division

    Central Power Research Institute, Bangalore

    SERIES HYBRID SYSTEM

    DG setBattery

    charger

    Battery

    BankInverter

    AC load

    AC BUSDC BUS

    Wind

    Solar

    PV

    Micro

    HydelRenewableEnergyS

    ources

  • 7/30/2019 Integration Renewable Energy

    2/21

    SWITCHED HYBRID SYSTEM

    DG set

    Battery

    Bank

    Inverter

    AC load

    AC BUS

    DC BUS

    Wind

    Solar PV

    Micro Hydel

    Renewable Energy Sources

    Battery

    charger

    PARALLEL HYBRID SYSTEM

    DG set

    Battery

    Bank

    Inverter

    AC load

    AC BUS

    DC BUS

    Wind

    Solar PV

    Micro Hydel

    Renewable Energy Sources

    Battery

    charger Synchronized

    control

    OPTIMIZATION CRITERIA

    ) Cost of the system

    ) Reliability of the system

    ) Availability of the energy throughout the year

    ) Site specific

    ) Operation and Maintenance of the system

    ) Ease of control and protection

    ) Grid connected or stand alone system

    ) Type of load

    Sl.

    No.

    Energy systems Capital cost,

    Rs. (lakhs)/kW

    01 Wind Generators 5 kW to

    225 kW (single units)

    0.70 1.16

    02 Solar Photo voltaic with

    inverter 20 W to 300 W

    (single units)

    2.97 4.45

    03 Micro-hydel 0.32 0.47

    04 Bio-gas 0.85 1.30

    CAPITAL COST

    )1(........../.Pr

    kWhyearRsyearperoductionEnergy

    CostCapitalInstalledSCC =

    )1(........../.

    Pr

    kWhyearRs

    yearperoductionEnergy

    CostCapitalInstalledSCC =

  • 7/30/2019 Integration Renewable Energy

    3/21

    Sl.

    No.

    Energy systems Running cost,

    Rs. /kWh

    01 Wind Generators 5 kW to

    225 kW (single units)

    0.45 1.35

    02 Solar Photo voltaic with

    inverter 20 W to 300 W

    (single units)

    0.35 1.15

    03 Micro-hydel 0.35 1.05

    04 Bio-gas 1.05 1.30

    RUNNING COST

    )1(........../.Pr

    kWhyearRsyearperoductionEnergy

    CostCapitalInstalledSCC =

    .../.Pr

    )()()&()*(kWhRs

    yearperoductionEnergy

    LRCMCMOFCRICCenergyofCost

    +++=

    COST OF ENERGY

    )1(........../.Pr

    kWhyearRsyearperoductionEnergy

    CostCapitalInstalledSCC =

    Where ICC Installed capital cost (Rs.),

    FCR annual fixed charge rate (%),

    O&M operation & maintenance cost including

    overhaul, replacement of parts, etc. (Rs./year),

    MC man power cost (Rs./year) and

    LRC levelized replacement cost (Rs./year)

    COST FOR WIND ENERGY

    SYSTEM

    Running

    cost,

    Rs. 1.28

    per kWh

    Project

    cost,

    Rs. 3.23

    per kWh

    O&M

    charges

    10 %

    Interest on

    debt

    18 %

    Civil

    construction

    2 %

    Transforme

    rs &

    controls

    7 %

    Machine

    63 %

    TOTAL COST : Rs. 4.52 per kWh

    )3(........../..int.

    kWhNosyearainGeneratedEnergy

    yearpererruptionsofNoTotalAESII=

    RELIABILITY INDICES

    )4(../)(int.

    kWhhyearainGeneratedEnergy

    yearperhoursinerruptionsofNototalofSumAESIDI=

    )5(.........

    .

    hoursofNoTotal

    yearperavailablesystemenergyofhoursofNoTotalAAI =

    )6(...............yearperenergyestimatedTotal

    yearpergeneratedEnergyTotalALFI =

    d) Average Load Factor Index (ALFI)

    c) Average Availability Index (AAI)

    b) Average Energy System Interruption Duration Index (AESIDI)

    a) Average Energy System Interruption Index (AESII)

  • 7/30/2019 Integration Renewable Energy

    4/21

    RELIABILITY INDICES

    0.650.518.61 x 10-31.06 x 10-3WIND (50 kW)

    0.950.468.91 x 10-31.78 x 10-3SOLAR (10 kW)

    ALFIAAIAESIDIAESIIRenewable

    energy

    Figure 3: Variation of Machine down time of 225 kW wind

    generator.

    0

    5

    10

    15

    20

    25

    30

    Jan Feb March April May June July Aug. Sept. Oct. Nov. Dec.

    Machinedowntime,

    %

    AVERAGE DOWNTIME : 6.33 %

    FAILURE ANALYSIS OF SPV SYSTEM

    Inverter-ACD-open

    0.46 %

    Inverter-ACBCB-

    open

    0.46 %

    Inverter sizing

    0.93 %

    Inverter - DCBCB-

    open

    0.93

    Inverter fuse

    failure

    4.17 %Inverter internal

    2.78 %Inverter DC Circuit

    breaker

    1.39 %

    Inverter others

    19.91 %

    DC disconnect

    1.39 % PV array

    0.46 %

    Data acquisition

    2.78 %

    AC disconnect

    0.93 %

    Inverter tracking

    32.87 %

    Electrical system

    31.02 %

    INVERTER FAILURE RATE : 64.35 %

    TOTAL NO. OF INTERRUPTIONS : 54/yearFAILURE ANALYSIS OF WIND SYSTEM

    Electrical

    system, 14.5 %

    Shaft &

    bearing, 2.2 %

    Blade, 4.5 %

    Brake, 4.5 %

    Generator, 1.7

    %

    Yaw system,

    13.4 %

    Blade tips,

    1.9 % Pitch

    Mechanism, 3.4Gear Box, 2.4 %

    Control, 14.4 %

    Others, 10.4 %

    Instrumentation

    , 26.7 %

  • 7/30/2019 Integration Renewable Energy

    5/21

    Figure 7: Variation of Solar Insolation with time.

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1000

    6 8 10 12 14 16 18 20

    Time, h

    SolarInsolation,

    W/m2

    Aug.

    March

    Nov.

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    7 8 9 10 11 12 13 14 15 16 17 18Time, h

    Monthlymeanpowerfedtoload,k

    WJan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    July

    MarchRATING OF SPV : 72 kW

    15

    19

    23

    27

    31

    35

    7 8 9 10 11 12 13 14 15 16 17 18

    Time, h

    Ambienttemperature,oC

    Jan Feb Mar Apr May Jun

    Jul Aug Sep Oct Nov Dec

    Dec

    April

    22

    24

    26

    28

    30

    32

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Time, month

    Monthlydailyaveragetemperature,

    oC Ambient temp.

    Cell temp.

  • 7/30/2019 Integration Renewable Energy

    6/21

    12.4

    12.6

    12.8

    13.0

    13.2

    23 25 27 29 31

    Cell temperature, oC

    Cellefficiency,%

    0.980

    0.985

    0.990

    0.995

    1.000

    1.005

    10 15 20 25 30 35 40 45

    Tilt angle, o

    Poweroutputfraction Latitude : 25

    o

    TILT ANGLE

    Figure 7: Variation of Solar energy density at a typical site.

    100

    120

    140

    160

    180

    200

    220

    240

    Jan

    Feb

    March

    April

    May

    June Ju

    lyAu

    g.

    Sept

    .Oc

    t.No

    v.De

    c.

    Energydensity,

    kWh/m2-month Annual energy = 2056.2 kWh/m2 - year

    Figure 4: Variation of Wind velocity with time.

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    0 4 8 12 16 20 24Time, h

    MeanWindvelocity,

    m/s

    MARCH

    NOV

    AUG

  • 7/30/2019 Integration Renewable Energy

    7/21

    Figure 2: Variation of Wind energy density at a typical site.

    20

    22

    24

    26

    28

    30

    32

    34

    Jan

    Feb

    March

    April

    May

    June

    July

    Aug.

    Sept.

    Oct.

    Nov.

    Dec.

    Energydensity,kWh/m

    2-month

    Annual Energy = 318 kWh/m2 - year

    Figure 5: Variation of energy density of wind

    energy systems.

    0

    20

    40

    60

    80

    100

    120

    140

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Energydensity,

    kWh/m2

    250 kW

    225 kW

    Figure 6 : Variation of specific energy generation

    (SEG) of wind energy systems.

    0

    50

    100

    150

    200

    250

    300

    350

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecSpecificenergygen

    eration,kWh/kW

    250 kW

    225 kW

    0

    200

    400

    600

    800

    1000

    0 4 8 12 16 20 24

    Time, h

    SolarInsolation,W/m2

    2.5

    5.0

    7.5

    10.0

    12.5

    WindVelocity,m/

    wind

    Solar

    0.0

    WIND SOLAR INTEGRATION

  • 7/30/2019 Integration Renewable Energy

    8/21

    SITE SPECIFIC

    Sl.No. Name of thestation Wind speed,km/h Sl. No. Name of thestation Wind speed,km/h

    I TAMIL NADU V GUJARAT

    1 Alagiyapandiyapuram

    20.88 1 Bamanbore -2

    20.72

    2 Andipatti 18.96 2 Bhandariya # 20.18

    3 Arasampalayam 20.18 3 Dhank - 1 24.53

    4 Ayikudy 21.35 4 Dhank - 2 25.32

    5 Edayarpalayam 22.43 5 Harshad 20.02

    6 Ennore # 19.18 6 Jamanvada # 20.20

    7 Gangalikondan 18.15 7 Kalyanpur 22.21

    8 Kannankulam ^ 21.57 8 Kukma 19.19

    9 Kattadimalai 23.66 9 Lamba # 19.47

    10 Kayattar 20.29 10 Limbara # 20.02

    11 Kethanur 21.91 11 Mundra 19.54

    12 Kumarapuram ^ 24.61 12 Navadra # 21.33

    13 Muppandai 25.48 13 Navi Bander 19.46

    14 Nettur ^ 20.89 14 Okha 19.43

    15 Onamkulam ^ 20.40 15 Okhamadhi 19.05

    16 Ottapidaram # 18.22 16 surajbari 19.53

    SITE SPECIFIC

    Sl.

    No.

    Name of the

    station

    Wind speed,

    km/h

    Sl. No. Name of the

    station

    Wind speed,

    km/h

    I TAMIL NADU VI MAHARASTRA

    17 Pongalur 19.43

    18 Poolavadi 21.16 1 Chalkewadi 20.17

    19 Poosaripatti ^ 20.39 2 Gude

    Panchagani

    20.01

    20 Puliyamkulam 18.93 3 Kotholi # 19.69

    21 Ramaswaram 23.91 4 Panchgani 18.39

    22 Sankaneri ^ 22.06 5 Vijayadurg 19.61

    23 Sembgaramanpu

    dur

    21.69 6 Koregaon ^ 20.80

    24 Sultanpet 18.96 7 Khokade ^ 18.07

    25 Talayathu 20.51 8 Thosigragh # 21.62

    Sl.

    No.

    Name of the

    station

    Wind speed,

    km/h

    Sl. No. Name of the

    station

    Wind speed,

    km/h

    II ANDHRAPRADESH VII KARANATAKA

    1 Badhrampalli

    Kottal

    21.46 1 B. B. Hill 20.78

    2 Bhimunipatnamq 19.11 2 Bommanahalli

    18.06

    3 Jamalamadugu -

    2 ^

    18.81 3 Chikodi ^ 24.00

    4 Kadavakallu ^ 23.08 4 Gokak 18.93

    5 Kakula Konda 23.08 5 Hanamsagar 20.23

    6 Kottur ^ * 19.13 6 Haumanhatti 20.08

    7 M. P. R. Dam 19.85 7 Haradenahalli

    #

    18.16

    8 Mustikovala # 20.16 8 Horti ^ 21.05

    9 Narasimha

    Konda

    20.08 9 Jogimatti 29.85

    10 Nazeerabad ^ 20.98 10 Khanderayan

    ahalli

    20.48

    11 Nallakonda ^ 22.38 11 Khamkarkatti

    ^

    21.47

    12 Pampanoor

    Thanda ^

    19.56 12 Malgatti 19.32

    13 Payalakuntla 20.09 13 Sangundi 18.56

    14 Ramagiri - 1 19.52 14 Godekere ^ 19.80

    Sl.No.

    Name of thestation

    Wind speed,km/h

    Sl. No. Name of thestation

    Wind speed,km/h

    II ANDHRAPRADESH

    15 Ramagiri - III # 18.36 VIII KERALA

    16 Singanamala # 23.40 1 Kanjicode 22.32

    17 Tallimadugulu 22.13 2 Kotamala 18.41

    18 Tirumala 20.43 3 Kottathara 19.40

    III RAJASTAN 4 Kuttikanam # 18.14

    1 Jaswanthgrah # 18.51 5 Panchalimedu

    #

    20.61

    2 Damotar # 18.28 6 Ponmudi 18.10IV LAKSHADWEEP 7 Pamakalmedu 30.02

    1 Agathi 18.22 IX MADHYA PRADESH

    2 Minicoy 18.29 1 Jamgodrani 18.44

    ^ 25 m Mast Height # Relocated Stations * State Owned Project

  • 7/30/2019 Integration Renewable Energy

    9/21

    SITE SPECIFIC

    )Solar power available varies at different

    site based on lattitude

    )Mini/Micro hydel potential available at

    hilly areas or very remote places

    OPERATION & MAINTENANCE

    4 Check gear box & hydraulic system

    4 Inspection of oil leakages

    4 Inspection of the cables running down the tower

    4 Unusual Vibration

    4 Checking the alignment of gear box, blades, etc

    4 Checking of brake adjustment, pad wear

    4 Bearing greasing

    4 Pitch calibration checks

    4 Checking performance of yaw drive & brake

    4 Blade cleaning

    0.75

    0.80

    0.85

    0.90

    0.95

    1.00

    1.05

    0 5 10 15 20 25 30

    Dust accumulation, %

    Powero

    utputfraction

    OPERATION & MAINTENANCE

    CONTROLS & PROTECTION

    @Yaw control & Pitch control in wind

    @Control of reactive power in case of inductiongenerator

    @Protection against very high wind velocity

    @Control & protection of battery charging@Inverter control

    @Protection against leakage current in PVsystem

    @Protection against lightning

  • 7/30/2019 Integration Renewable Energy

    10/21

    GRID CONNECTED OR STAND ALONE

    SYSTEMS

    Grid connected are preferred where the grid

    is within 3 km

    For large wind farms grid will be preferred

    Solar rooftop systems are installed with grid

    TYPE OF LOAD & TECHNOLOGY

    Load AC or DC

    Continuous,

    Intermittent,

    Peak load sharing

    Varying loads

    DC GENERATOR

    WIND TURBINE TECHNOLOGIES

    WIND TURBINE

    AC BUSCOMPOUND WOUND DC

    GENERATOR

    INVERTER

    GEAR

    BOX

    DC BUS

    WIND TURBINE TECHNOLOGIES

    CAPACITOR EXCITED INDUCTION GENERATOR

    AC BUSWIND TURBINE

    GEAR BOX

    SQUIRREL CAGE

    INDUCTION GENERATOR

    CAPACITOR

    BANKS

  • 7/30/2019 Integration Renewable Energy

    11/21

    WIND TURBINE TECHNOLOGIES

    INDUCTION GENERATOR DIRECTLY COUPLED TO GRID

    AC

    GRID

    WIND TURBINE

    GEAR BOX

    SQUIRREL CAGE

    INDUCTION GENERATOR

    DOUBLY FED INDUCTION GENERATOR

    AC

    GRID

    WIND TURBINE

    GEAR BOX

    DOUBLY FED WOUND ROTOR

    INDUCTION GENERATOR

    CONVERTOR

    WIND TURBINE TECHNOLOGIES

    DIRECT DRIVE SYNCHRONOUS GENERATOR

    AC

    GRID

    WIND TURBINE

    DIRECT DRIVE SYNCHRONOUS

    GENERATOR

    CONVERTOR

    WIND TURBINE TECHNOLOGIES DIFFERENT PHOTO VOLTAIC CELLS

    0.46

    0.24

    0.11

    0.40

    0.40

    Temp.

    Coefficient

    17.7 %Copper indium

    Diselenide (CIS)

    5

    7 %Cadmium Telluride

    (CdTe)

    4

    5 9 %Amorphous Silicon(a-Si)

    3

    10 14 %Polycrystalline Silicon

    (Poly-Si)

    2

    15 20 %Single Crystal silicon

    (Mon-Si)

    1

    Cell efficiencyTypeSl.

    No.

  • 7/30/2019 Integration Renewable Energy

    12/21

    INVERTERS

    Inverters

    Low efficiency : 75 80 %, power quality issues

    Average efficiency : 80 88 %, reduced power

    quality problems, cost 1.4 1.5 times

    High efficiency : 87 96 %, cost 1.6 to 1.8 times

    Rotary converters

    TYPES OF MINI/MICRO HYDEL PLANTS

    PARTICULAR Head, m Output, kW

    Pelton 100 550 50 6000

    Micro pelton 39 70 5 15

    Turgo 30 200 15 3000

    Micro turgo 10 75 3 45

    Francis 15 250 15 7000

    Kaplan 3 30 500 7500

    Semi Kaplan 3 25 10 6000

    Propeller 3 25 10 6000

    Bulb 2 12 100 2600

    DIFFERENT COMBINATIONS

    LessModerately

    high

    Good2.85 5.55Solar Wind

    Hydel DG set

    5

    LessMediumGood4.15 7.75Solar Wind DG

    set

    4

    LessModerately

    High

    Poor1.94 2.95Hydel DG set3

    MoreHighPoor3.38 7.50Wind DG set2

    LessLessGood5.69 8.54Solar DG set1

    Man power

    requirement

    O & MReliabilityLife cycle

    cost,

    Rs./kWh

    Integration systemSl.

    No.

    INTEGRATION OF SOLAR PV - DIESEL

    DieselGenerator

    PV

    DC PowerConditioning

    module

    Battery Bank

    Inverter/Converter

    Figure 1: Schematic of Integration of Solar PV with DG set.

    Chargecontroller

    Load Bus

  • 7/30/2019 Integration Renewable Energy

    13/21

    Yes

    Controller

    DG set (PDG)

    PSPV > 0

    Batt. (PB)SPV Energy System

    (PSPV)Load (PL)

    PL>PB

    PCH > PB

    Chargebattery

    PCH = dumpload

    PL< .40PB

    PSPV supplypower to

    load

    PCH = PSPV - PL

    PB supplypower to

    load

    PDG supplypower to

    load

    PCH = 0.85 PDGR- PL

    PL> PSPV + PB

    PSPV & PDGsupply

    power toload

    PCH = (0.85 PDGR+PSPV)- PL

    Yes

    YesYes

    Yes

    Yes

    No

    No

    No

    No

    Figure 2: Flow diagram of integrated energy system

    INTEGRATION OF SOLAR PV - DIESEL

    Table 2 : Variation of rating and energy supplied by energy sources.

    50.4343.2535.75Energy supplied by Battery bank to load,

    (kWh/day)

    10

    81.73112.81144.00Total energy supplied by DG set, (kWh/day)09

    10.3625.7033.25Energy supplied by DG set for battery

    charging, (kWh/day)

    08

    71.3687.11110.75Energy supplied by DG set to load,

    (kWh/day)

    07

    124.3593.2762.08Total energy supplied by SPV, (kWh/day)06

    40.0717.552.50Energy supplied by SPV for battery

    charging, (kWh/day)

    05

    84.2975.7259.58Energy supplied by SPV to load, (kWh/day)04

    7.0/516.0/444.5/36Battery bank capacity, Peak power, (kW)/

    Energy, (kWh/day)

    03

    10.012.515.0Rating of DG set, (kVA)02

    16.012.08.0Peak Power Rating of SPV, (kW)01

    Config. CConfig. BConfig. AParticulars

    Sl.No.

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Time, (h)

    Power,(kW)

    Load variation Load variation

  • 7/30/2019 Integration Renewable Energy

    14/21

    Battery-Inverter

    Solar PV-

    Inverter

    DG set

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Power,(kW)

    S P V = 5 9 . 5 8 k W h / d D G s e t = 110 . 7 5 k W h / d B a t t e r y = 3 5 . 7 5 k W h / d

    T O T A L E n e r g y = 2 0 6 . 0 8 k W h / d

    Configuration A

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Energygeneration,

    (MWh/month)

    Solar Power DG Power Share of SPV

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    ShareofSPV,

    (%ofload

    30.0

    Configuration A

    Configuration A

    Table 3: Life cycle cost analysis for Configuration A.

    Levelizedcost of energy : Rs. 9.62 per kWh

    7.10093.82750.44650.37132.455631.3971Total

    0.086500.04370.00880.03400.4368Inverter

    0.030200.00590.01720.00710.0903Battery

    4.08833.82750.17890.06430.01760.2268DG set

    2.895900.21800.28102.396930.6432Solar PV

    Total Annu-

    alized cost

    (Rs. in lakhs

    /y)

    Annual fuel

    cost, (Rs. in

    lakhs /y)

    Annual

    O&M cost,

    (Rs. in

    lakhs /y)

    Annualized

    replacement

    cost, (Rs. in

    lakhs /y)

    Annualize

    d capital

    cost, (Rs in

    lakhs./y)

    Intial

    cost,

    (Rs in

    lakhs)

    Component

    Configuration B

    Battery-Inverter

    Solar PV-Inverter

    DG set

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, (h)

    Pow

    er,(kW)

    (

    SPV = 75.72 kWh/day DG set = 87.11 kWh/day Battery = 43.25 kWh/day

    TOTAL Energy = 206.08 kWh/day

  • 7/30/2019 Integration Renewable Energy

    15/21

    Configuration B

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    Jan Feb Mar A pr May Jun Ju l A ug Sep Oc t Nov D ec

    Energygeneration,(MWh/month

    Solar Power DG Power Share of SPV

    0.0

    8.0

    16.0

    24.0

    32.0

    40.0

    48.0

    ShareofSPV,(%o

    fload

    Configuration B

    Table 3: Life cycle cost analysis for Configuration A.Table 4: Life cycle cost analysis for Configuration B.

    Levelized cost of energy : Rs. 10.04 per kWh

    7.4184

    3.40960.48680.43423.087839.1314Total

    0.1087

    00.05460.01130.04280.5460Inverter

    0.0571

    00.00670.01640.03400.0924Battery

    3.6322

    3.40960.15250.05540.01470.1890DG set

    3.6204

    00.27300.35112.996338.3040Solar PV

    Total Annu-

    alized cost

    (Rs. in lakhs

    /y)

    Annual

    fuel cost,

    (Rs. in

    lakhs /y)

    Annual

    O&M cost,

    (Rs. in lakhs

    /y)

    Annualized

    replacement

    cost, (Rs. in

    lakhs /y)

    Annualize

    d capital

    cost, (Rs in

    lakhs./y)

    Intialcost,

    (Rs in

    lakhs)

    Component

    Configuration C

    Battery-Inverter

    Solar PV-

    Inverter

    DG set

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2 1 22 23 24Time, (h)

    Pow

    er,(kW

    (

    SP V = 84.29 kWh/day DG s et = 71.36 kWh/day

    Batte ry = 50.43 kWh/day TOTAL Energy = 206.08 kWh/day

    Configuration C

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Energygeneration,(MWh/month)

    Solar Power DG Power Share

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    ShareofSPV,(%o

    fload)

  • 7/30/2019 Integration Renewable Energy

    16/21

    Configuration C

    Table 3: Life cycle cost analysis for Configuration A.Table 4: Life cycle cost analysis for Configuration B.Table 5: Life cycle cost analysis for Configuration C.

    Levelizedcost of energy : Rs. 11.93 per kWh

    8.8096

    2.63340.65110.64184.883462.4217Total

    0.1739

    00.08740.01810.06850.8736Inverter

    0.0349

    00.00760.01930.00800.1008Battery

    2.8077

    2.63340.11930.04240.01260.1609DG set

    5.7931

    00.43680.56204.794361.2864Solar PV

    Total Annu-alized cost

    (Rs. in lakhs

    /y)

    Annualfuel cost,

    (Rs. in

    lakhs /y)

    AnnualO&M cost,

    (Rs. in lakhs

    /y)

    Annualizedreplacement

    cost, (Rs. in

    lakhs /y)

    Annualized capital

    cost, (Rs

    in

    lakhs./y)

    Intial cost,(Rs in lakhs)Component

    Capital cost & Annualized cost with

    SPV share

    0

    10

    20

    30

    40

    50

    60

    70

    0 10 20 30 40 50Sare of SPV, % of load

    Intialcost,Rs.

    Inlakh

    Initial cost Annualized cost

    Annualizedcapitalcost,Rs.inlakhs/year

    0.0

    2.0

    4.0

    6.0

    8.0

    10.0

    12.0

    14.0

    Cost of energy with SPV share

    9

    10

    11

    12

    13

    14

    15

    0 10 20 30 40 50

    Sare of SPV, % of load

    Levelizedco

    stofenergy,

    Rs./

    kWh

    Figure 7 : Variation of load and power supplied by Wind generator, DG set & Battery with low wind

    penetration.

    Battery-Inv.

    Wind-Gen.

    DG set

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Power,kW

    Wind = 60.58 kWh/day (29.75 %) DG set = 120.40 kWh/day (59.13 %) Battery = 22.65 kWh/day (11.12 %) TOTAL Energy =

    203.63 kWh/day

  • 7/30/2019 Integration Renewable Energy

    17/21

    Figure 9 : Variation of DG set e nergy for charging of battery and load supplied by battery.

    Battery to loadBattery charging

    0

    2

    4

    6

    8

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Power,

    kW

    DG set energy for Battery charging = 31.36 kWh/day (20.66 % of total DG power) Energy from

    Battery to load = 22.66 kWh/day (11.12 % of total load)

    100

    75

    50

    25

    0

    Battery

    charge

    state,

    Batt. Char e state

    Figure 8 : Variation of total energy generated by Wind and DG set with low penetration.

    0

    2

    4

    6

    8

    10

    12

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Pow

    er

    ,kW

    Wind = 60.59 kWh/dayDG = 121.98 kWh/day

    Figure 7 : Variation of load and power supplied by Wind generator, DG set & Battery with high wind

    penetration.

    Battery-Inv.

    Wind-Gen.

    DG set

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Power

    ,kW

    Wind = 131.64 kWh/d ay (64.65 %) DG set = 55.85 kWh/day (27.43 %) Batte ry = 16.14 kWh/d ay (7.92 %)TOTAL Ener gy =

    203.63 kWh/day

    Figure 9 : Variation of DG set and w ind energy us ed for battery charging.

    0

    1

    2

    3

    4

    5

    6

    7

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Power,

    kW

    DG to Battery charging = 8.61 kWh/day (13.36 % of total DG power)

    Wind to Battery charging = 13.73 kWh/day (9.44 % of total Wind gen.)

    Battery to load = 16.14 kWh/day (7.92 % of total load)

    100

    80

    60

    40

    20

    0

    120

    140

    Battery

    charge

    state,%

    Batt .Char e state

  • 7/30/2019 Integration Renewable Energy

    18/21

    Figure 8 : Variation of total energy generated by Wind and DG set w ith high penetration.

    0

    2

    4

    6

    8

    10

    12

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Pow

    er,

    kW

    Wind = 145.37 kWh/day

    DG = 64.46 kWh/day

    Figure 7 : Variation of load and power supplied by Wind gener aotr and Battery with high wind pene tration.

    Battery-Inverter

    Wind Generatorr

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Power,

    kW

    Wind generator = 158.82 kWh/day Battery = 44.81 kWh/day TOTAL Energ y = 203.63 kWh/day

    Figure 9 : Variation of wind energy for charging of battery and load supplied by battery.

    Battery to load

    Battery charging

    0

    2

    4

    6

    8

    10

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Power,

    kW

    Wind energy for Battery charging = 62.01 kWh/day (28.12 % of total wind gen.)

    Energy from Battery to load = 44.80 kWh/day (22.01 % of total load)

    100

    80

    60

    40

    20

    0

    Batterychargestate,

    Batt. Charge state

    Figure 8 : Variation of total energy gener ated by Wind with high penetr ation.

    0

    2

    4

    6

    8

    10

    12

    14

    16

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    Time, h

    Pow

    er,

    kW

    Wind = 220.53 kWh/day

  • 7/30/2019 Integration Renewable Energy

    19/21

    Figure : Variation of energy generation by wind, load met, unmet load and excess energy w ith

    wind generator capacity

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    10 15 20 25 30 35 40 45 50 55 60

    Wind generator capacity, kW

    Energy,

    MWh/y

    Load met

    Wind gen.

    Unmet load

    Excess energy

    Figure : Variation of levellized cost of energy with wind generator capacity

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    10 15 20 25 30 35 40 45 50 55 60

    Wind generator capacity, kW

    Levellizedcostofenergy,

    Rs./

    kWh

    Figure : Variation of initial investment with wind generator capacity

    10

    20

    30

    40

    50

    60

    70

    80

    10 15 20 25 30 35 40 45 50 55 60

    Wind generator capacity, kW

    InitialInvestm

    ent,

    Rs.

    In

    lakh

    Figure : Variation of relative investment for battery, controller and wind generator with wind

    generator capacity

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    10 15 20 25 30 35 40 45 50 55 60

    Wind generator capacity, kW

    Investment,%

    oftotalcost

    Battery

    Wind gen.

    Controller

  • 7/30/2019 Integration Renewable Energy

    20/21

    Figure : Variation of capacity shortage, unmet load and excess generation with wind generator

    capacity

    0

    10

    20

    30

    40

    50

    60

    10 15 20 25 30 35 40 45 50 55 60

    Wind generator capacity, kW

    Capacityshortage,unmetload&

    Excessgen,

    %

    unmet load

    Excess gen.Capacity shortage

    Figure : Variation of energy generation by wind, DG set, load met, unmet load and excess energy with wind

    generator capacity

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    4 6 8 10 12 14 16 18 20 22 24 26

    Wind generator capacity, kW

    Ener

    ,M

    W

    h/

    Load met

    Wind gen.

    DG gen.

    Unmet loadExcess energy

    Figure : Variation of levelized cost of energy with wind generator capcity

    6

    8

    10

    12

    14

    16

    18

    20

    22

    4 6 8 10 12 14 16 18 20 22 24 26

    Wind generator capacity, kW

    Levelized

    co

    stofener

    ,Rs./

    kW

    h

    Diesel price Rs.30/litre

    Diesel price Rs.35/litre

    Diesel price Rs.40/litre

    Diesel price Rs.45/litre

    Diesel price Rs.50/litre

    Diesel price Rs.55/litre

    Diesel price Rs.60/litre

    CONCLUSIONS

    Integration of individual renewable system

    with DG and battery storage is not

    economically attractive, reliability &

    availability also not encouraging

    Integration of two or more renewable energysystem with DG is economical and improved

    availability & reliability factors.

  • 7/30/2019 Integration Renewable Energy

    21/21

    Thank you

    Email:[email protected] &