Integrating flow measurement into ABB CEMS

18
Integrating flow measurement into ABB CEMS Steve Donnelly - March 2013

description

Steve Donnelly - March 2013. Integrating flow measurement into ABB CEMS. CEMS Standards Flow metering. Stack emissions subject to legislation for many years Output in KTons/year has always been required, but standards did not specify how to establish - PowerPoint PPT Presentation

Transcript of Integrating flow measurement into ABB CEMS

Page 1: Integrating flow measurement  into ABB CEMS

Integrating flow measurement into ABB CEMS

Steve Donnelly - March 2013

Page 2: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

CEMS StandardsFlow metering

Stack emissions subject to legislation for many years

Output in KTons/year has always been required, but standards did not specify how to establish

Flow measurement sometimes but not always used – many mass flows are calculated

New standard will give requirements – and gives guidance on - flow metering techniques

Page 3: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

CEMS StandardsEurope

2001… LCPD, WID ……..IED

EN 14181Relevant European standard for on-going quality assurance of CEMS

EN 15267-3 Performance specifications and test procedures for CEMS

Must now measure the mass of pollutants released, not just the concentration

EN ISO16911 Will specify the requirements for flow measurement

Page 4: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster First choice for CEMS flow metering

Uses proven Torbar averaging pitot flow metering technology.

Assures compliance

with new European & US EPA regulations

Optimises plant running hours

Simplifies installation

Reduces cost of ownership

Integrates into new and existing CEMS

Page 5: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster Why use Averaging Pitot for Stack Measurement

Low installation costs

Max two stabbings to be cut into stack(only one if not end supported version)

Available in a variety of materials

to suit different processes

Multi-port instrument

resistant to effects of changing flow profiles

Reliable, long term solution

no moving parts

no electronics within stack

Low risk of failure in the primary element

Page 6: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

High Pressure

Low Pressure

Static LP pressure point

Outer Impact Tube

Differential Pressure OutputConnected to DP Measuring Instrument

How Averaging Pitot Tubes work

The ABB averaging pitot:

Multi-port meter across full diameter ‘auto-traverses’

Resultant differential pressure is proportional to the square of the volume flow rate

Measures the mean fluid velocity without the need for traversing

Upstream HP sensing holes

Upstream HP sensing holes HP Inner Tube

LP Inner Tube

Page 7: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster

Profiled flats around the downstream hole

define the flow separation point

stable pressure area at downstream tapping

more constant coefficient at high velocities

very wide turndown

Provides a highly stable flow signal

Low Pressure Tube

Torbar Edge - Better performance and stability

Profiledflats

Page 8: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster

Easier handling for large diameter stacks

probes above 5 metres are in two pieces with centre coupling

simplifies shipping and handling; may simplify installation

Torbar Edge – Easier handling

Page 9: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster Why choose StackFlowMaster?

Averaging pitot tube technology

approved under the new standards

EN15267-3 & MCERTS approval

satisfies QAL1 & QAL3 requirements.

Optional automatic zero/span checks

no physical user intervention required

Supply with ABB CEMS analyser

enables purchase of complete package from single supplier/manufacturer

Enables CEMS upgrades

to meet the new legislation

Robust for long term use

minimal maintenance

.

Page 10: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster Torbar advantages

Easy to install

Requires only a simple one - or two - stabbing insertion

Robust meter with a long service life

Reduces risk of expensive failures

Stronger construction than those with special profiles

Offers good quality, stable measurement

Due to unique sensor profile

Special end support designs give greater integrity

From ABB's many years of experience

Page 11: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster FPD585 Flow Probe with Automatic Interface

Torbar probe specifically designed for stacks 25 or 60mm diameter optional integral RTD

Multivariable transmitter DP & absolute pressure measurement

with temperature input remote mounted in interface unit

Automatic interface unit 3 versions

MCERTS pending for automatic zero/span versions

Page 12: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster FPD585 Automatic Interface Variants

Automatic zero/span checking option No external equipment to be connected Checks at the push of a button

Optional Enclosure Heater For ambient temperatures below 0°C

Purging Recommended for particulate

concentrations > 30mg/m3 and up to 300 mg/m3

Page 13: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster Purging

Cleans probe ports using pressurised air

Enclosure contains multivariable transmitter for volume or mass flow measurement

Enclosure contains sequencing controls/valves for automatic (regular) purging or on-demand purging

Purge Air

Contaminated Flue Gas

Purge Air

Purge Air

Data

Page 14: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster Key aspects of Installation

Location:-

Requirements for upstream lengths of stack, expressed in terms of the actual stack internal diameter D

Minimum upstream straight length is 8D

Minor obstruction (sample probe) OK if > 3D upstream

8D

Page 15: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster ABB supplies complete CEMS

SOx, NOx, CO, HCl, HF, NH3…

O2 combustion

Dust

Mass flow Data acquisition and reporting

Page 16: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster Benefits

Wide range of stack temperatures

suitable for stack gas temperatures up to 1200°C

Wide range of stack applications

Incinerator plants, power generators, refineries, metals processing, cement plants, crematoria

Up to 8m diameter

Handles solid contaminants

Up to 300mg/m3

automatic or manual purging of probe portsavailable

Page 17: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

FPD580 StackFlowMaster Benefits

Handles corrosive contaminants

316L, 321H or alloy 625 sensor

Hastelloy C transmitter diaphragms , PTFE seals; optional 316 transmitter housing

Easier installation in large diameter stacks

two piece probes with centre coupling

Simplifies handling, transportation, installation

Simplified QAL3 compliance

Automatic option for tx span check

No external equipment required

Simple to size and specify

Intuitive software for selection, sizing and coding

Auto-updating facilities

 

Page 18: Integrating flow measurement  into ABB CEMS

ABB Company Confidential

Stands 47 and 48

Steve Donnelly, CEMS specialist