Pat Brown Senior Project Manager
IntelliGrid Program
July 10, 2012
Common Information Model (CIM) &
Network Model Management
![Page 2: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/2.jpg)
2 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Legal Notices
Please observe these Antitrust Compliance Guidelines:
Do not discuss pricing, production capacity, or cost information which is not publicly available; confidential market strategies or business plans; or other competitively sensitive information
Be accurate, objective, and factual in any discussion of goods and services offered in the market by others.
Do not agree with others to discriminate against or refuse to deal with a supplier; or to do business only on certain terms and conditions; or to divide markets, or allocate customers
Do not try to influence or advise others on their business decisions and do not discuss yours except to the extent that they are already public
![Page 3: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/3.jpg)
3 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Introduction
• Common Information Model & Network Model Management
• EPRI Work – Base-funded requirements project – Supplemental project – real-world, more detail, business
processes
• Context: Transmission – More mature product market spaces – Complexity of challenge
![Page 4: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/4.jpg)
4 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Agenda
• CIM Background – What it is, how it’s used – History - a focus on Network Model Management
• Network Model Management work at EPRI
– The issue and the vision – Base funded project
• Strategy • Initial observations
• Questions / Comments
![Page 5: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/5.jpg)
5 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Who’s On the Webcast?
• Organization – TSO? – ISO? – Neither?
• Work Area – Operations? – Planning? – IT? – Other?
• Experience with CIM – Have deployed it? – Am familiar with it? – Could spell it?
![Page 6: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/6.jpg)
6 © 2012 Electric Power Research Institute, Inc. All rights reserved.
IntelliGrid Program
The IntelliGrid Program conducts research, development and demonstrations on the Information and Communications Technologies (ICT) that Enable Smart Grid applications
IntelliGrid • Transmission • Distribution • End-Use (AMI/DR)
![Page 7: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/7.jpg)
7 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background The Common Information Model Problem Space • Information exchange among applications or systems • Electric utility operations (not generic business domain) • Enterprise level (not device level) data sharing • The bigger world of the Smarter Grid
– More applications – More data – Increasing expectations for
seamless collaboration
![Page 8: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/8.jpg)
8 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background The Common Information Model Problem Space • Interfaces proliferate • Each is custom (and as time consuming as the last) • Need to understand and document many transformations
Application C
Application B
Application A
Application H
Application G
Application F
Application E
Application D
• One change breaks many interfaces Application
B
![Page 9: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/9.jpg)
9 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background The Solution • Arm’s length sharing via a common semantic model
Application C
Application B
Application A
Application H
Application G
Application F
Application E
Application D
![Page 10: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/10.jpg)
10 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background The Solution – a common model • The common semantic model
– Clearly describes meaning and relationships of shared data
– Also called “conceptual” or “cannonical” or “public” model
• Content of model defined by means of
data sharing use cases
• Independent of all internal application representations
![Page 11: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/11.jpg)
11 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background The Solution – a common model • Each application translates to/from its internal model
to the public model
Application C
Application B
Application A
Application H
Application G
Application F
Application E
Application D
Semantic /format translation
semantic/ format
translation
semantic/ format
translation
Semantic /format translation
![Page 12: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/12.jpg)
12 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background The Solution – a common model • The common semantic model
– Requires only one translation per application – Eases application replacement, facilitates application
addition
• Our common semantic model is the CIM
• Intentionally layered – Semantics (described in UML) – Syntax (many)
![Page 13: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/13.jpg)
13 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background Deep History in Network Modeling • EPRI Operator Training Simulator work (early 90s) • CCAPI Task Force (1993 – 1996)
– Initial goal: allow utilities to procure “best of breed” subsystems for their Energy Management Systems
– Operations perspective – Network model at core
• IEC standard (1996) – Initially: WG13 (Transmission) and WG14 (Distribution) – Over time: WG13 (network model, batch exchange) and
WG14 (assets/meters/work management, messaging) – Shift in vision: electric utility data model in “enterprise
application integration”
![Page 14: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/14.jpg)
14 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background InterOperability Tests Tell the Story
20 network model IOPs since 2000
2000 [CIM9a] • full model exchange (sample model)
2001 [CIM9b] • full model exchange (Duke, CAL ISO models)
2002 [CIM10] • full/incremental model exchange
2003 [CIM10] • full/incremental model exchange, messages
2004, 2005, 2006 [CIM10] • full/incremental model exchange, Distribution
2007 [CIM11] • full/incremental model exchange, Model Authority Sets
![Page 15: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/15.jpg)
15 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background InterOperability Tests Tell the Story
20 network model IOPs since 2000
2008 [CIM12/13] – full/incremental model exchange, Planning 2009 [CIM14] – full/incremental model exchange, State Variables 2010 [CIM14] – full/incremental model exchange, headers & merging 2011 [CIM15] – full/incremental model exchange, Diagram Layout,
balanced/unbalanced transformer 2012 [CIM16] – full/incremental model exchange, Dynamics, short circuit
![Page 16: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/16.jpg)
16 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background How the CIM is Expressed • Common Model – the whole puppy (1500+ classes)
– Unified Modeling Language (UML) – in Enterprise Architect software tool
• Profiles – one data exchange (1-50 classes) – constrains model and adds instantiation rules – standard and project / product specific – data profiles and technology-specific profiles – UML plus… – many tools
• Exchange Instances – technology specific (CIM XML with RDF Schema)
![Page 17: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/17.jpg)
17 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Common Model – UML
CIM Background How the CIM is Expressed
![Page 18: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/18.jpg)
18 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Profiles – UML plus rules
CIM Background How the CIM is Expressed
![Page 19: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/19.jpg)
19 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background How the CIM is Expressed
• Exchange Instances – CIM XML (flat file or messages)
![Page 20: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/20.jpg)
20 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background EPRI CIM Primer
• To learn more: Common Information Model Primer Product ID: 1024449 www.epri.com Search on Title or Product ID
![Page 21: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/21.jpg)
21 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background CIM as an IEC Standard • Actually 3 standards:
– 61970 (network model, XML file exchange) – 61968 (asset, meter, messaging) – 62325 (markets)
• 3 Working Groups – WG13 – 61970
Convener: Terry Saxton [email protected]
– WG14 – 61968 Convener: Greg Robinson [email protected]
– WG16 – 62325 Convener: Jim Waight [email protected]
• IEC “owns” paper documents • CIMug “owns” UML
![Page 22: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/22.jpg)
22 © 2012 Electric Power Research Institute, Inc. All rights reserved.
CIM Background CIM Users Group (CIMug)
• Community of users and implementers • www.cimug.org • One of several user organizations under UCAInternational
umbrella • Sponsors 2 Users Group meetings per year
– US in the fall (New Orleans – October 22-26, 2012)
– Europe in the spring
![Page 23: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/23.jpg)
23 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project EPRI Work
• Why? – Why this work? Why the CIM? – Improve reliability – better network application results – Improve efficiency – engineers do engineering, not data
entry • How?
– Define real-world requirements -> understood product market space
– Progress the CIM standard – Vendor products
• Why now? – Convergence of standards readiness and utility need
![Page 24: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/24.jpg)
24 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project EPRI Work
• Integrated Network Model Management – Base-funded requirements project – Supplemental project – real-world, more detail, business
processes
![Page 25: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/25.jpg)
25 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• One electrical grid • Multiple applications
requiring Transmission network model as input
The Current Situation …silo’d model maintenance
EMS/ Operations
Planning
Protection
Training Simulator
Transient Analysis
Development Planning
. .
. .
. .
. .
. .
![Page 26: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/26.jpg)
26 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• This means – Independent manual updates to each model
• Duplicate effort • Synchronization / consistency issues
– Difficult to capture data from one application and apply it in another
– Lack of support for model history – No shared vision of model future – No clarity of thinking about what’s universal (network
configuration, operating guides, operating state)
The Current Situation …silo’d model maintenance
High expenditure of effort but less than high quality results
![Page 27: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/27.jpg)
27 © 2012 Electric Power Research Institute, Inc. All rights reserved.
The Vision
EMS/ Operations
Planning
Protection
Training Simulator
Transient Analysis
Development Planning
. .
. .
. .
. .
. .
![Page 28: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/28.jpg)
28 © 2012 Electric Power Research Institute, Inc. All rights reserved.
The Vision …coordinated Transmission network model maintenance
Development Planning
EMS/ Operations
Planning Training Simulator
Protection
Transient Analysis
. . . . . .
. . . .
![Page 29: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/29.jpg)
29 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Supports – As-built model history – Planned or proposed work managed cleanly, with
network configuration, operating guides, operating state model separately
The Vision …coordinated Transmission network model maintenance
• Features – Single source for each piece of data – Changes made only once – Timely, coordinated updates of model for each system
based on its needs
![Page 30: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/30.jpg)
30 © 2012 Electric Power Research Institute, Inc. All rights reserved.
The Vision …coordinated Transmission network model maintenance
Less effort for much higher quality results
• Benefits – Confidence in data and application results – Ability to correlate information between applications – Timely answers – Reduce maintenance labor
![Page 31: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/31.jpg)
31 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• But there are challenges… – Requirements not fully understood – Model maintenance products are in their infancy – Have a good model basis in the Common Information
Model (CIM), but • Limited CIM interfaces on existing applications • Internal network model exchange is new territory
– Strategy implies significant business process changes
The Vision …coordinated Transmission network model maintenance
![Page 32: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/32.jpg)
32 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Observations from utility experience – Merging/aligning models to arrive at single version of the
truth is a lot of work – Vendor products are not ready – Ongoing model validation processes are crucial – Have to make lots of instantiation assumptions – Getting business processes (and individual thought
processes) “CIM compliant” is the hardest task
The Vision …coordinated Transmission network model maintenance
![Page 33: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/33.jpg)
33 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Statnett quote in presentation at recent CIMug: “CIM v16 is the first version with the potential to fulfill
our requirements for practical use”
The Solution Framework …the Common Information Model (CIM)
![Page 34: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/34.jpg)
34 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• The value is there – Allow engineers do engineering – Reduced labor – Accurate and timely results – Compliance with NERC model requirements – Readiness for inter-utility exchange
• The timing is right to start
– CIM is ready for real-world exercising – Vendor products still being developed
Integrated Network Model Management …an idea whose time has come
![Page 35: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/35.jpg)
35 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Phase I – Data Gathering – Visionary Utilities – Consuming Applications – Solution Tools
• Phase I – Data Gathering – Visionary Utilities – Consuming Applications – Solution Tools
EPRI Network Model Management Project The Base-Funded Project
• Phase II – Generic use case
• Phase III - Requirements
![Page 36: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/36.jpg)
36 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Utility Deployments
Between ISOs and their member TSOs – ERCOT – California ISO – ENTSO-E (Pan European Transmission Coordinator)
• Key CIM features – Operations / Planning – the Topology Package – TSO maintenance of subset - Model Authority Sets – Different names - Naming model – Exchange file size - Incremental updates
Challenge: Merging similar pieces of a model into a whole
![Page 37: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/37.jpg)
37 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Utility Deployments
Inside the utility – ERCOT – California ISO – ENTSO-E – Powerlink (Australia) – Elia (Belgium) – NYISO – Statnett (Norway) – RTE (France)
• Key CIM features – All needed for TSO/ ISO plus new ones
Challenge: Synthesizing different views of the same information
![Page 38: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/38.jpg)
38 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Utility Deployments
• As many scopes and solution strategies as there are utilities
• Wide variety of solution technologies
![Page 39: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/39.jpg)
39 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Consuming Applications “Real-Time” / Operations / EMS • Functions
– Topology Processing – State Estimation – Contingency Analysis – Optimal Power Flow – Voltage Stability
• Vendors / Products – ABB – Network Manager – Alstom – eterraplatform – GE – XA/21 – OSI – monarch – Siemens – Spectrum Power 3 – Others?
![Page 40: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/40.jpg)
40 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Consuming Applications
Planning • Functions
– Power Flow – Contingency Analysis – Optimal Power Flow – Security Constrained Optimal Power Flow – Available Transfer Capability – Voltage Stability – Sensitivity Analysis – Fault Analysis – Transient Stability Analysis – Small Signal Stability Analysis
![Page 41: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/41.jpg)
41 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Consuming Applications
Planning • Vendors / Products
– CESI – DigSilent – PowerFactory – GE – PSLF – NEPLAN – PowerWorld – Siemens – PSSE – Tractebel – Eurostag – Others?
![Page 42: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/42.jpg)
42 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Consuming Applications
Protection • Functions
– Protection Scheme Design – Short Circuit Analysis
• Vendors / Products – Aspen - OneLiner – electrocon - CAPE – Cooper – CYME family – DigSilent – StationWare, PowerFactory – Others?
![Page 43: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/43.jpg)
43 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Consuming Applications
Operator Training Simulator • EMS Vendors / Products
– ABB – Network Manager – Alstom – eterraplatform – GE – XA/21 – OSI – monarch – Siemens – Spectrum Power 3
• Standalone Vendors / Products – Powersmiths/PowerWorld – OPS-X – Incremental Systems – PowerSimulator – DSi – EPRI OTS – Others?
![Page 44: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/44.jpg)
44 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Consuming Applications
• Lots of products • Functions overlap, even in this mature product space
![Page 45: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/45.jpg)
45 © 2012 Electric Power Research Institute, Inc. All rights reserved.
EPRI Network Model Management Project Data Gathering – Model Management Tools
Network Model Management • Vendors / Products
– Alstom – eTerrasource – Siemens PTI – ODMS – Others?
![Page 46: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/46.jpg)
46 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Phase I – Data Gathering – Visionary Utilities – Consuming Applications – Solution Tools
• Phase II – Generic use case
• Phase III - Requirements
EPRI Network Model Management Project The Base-Funded Project
![Page 47: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/47.jpg)
47 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Application Data – Types of data
• Equipment, including geo-spatial location • Connectivity • Flowgate definitions • Topology • One-line (graphic) layout of equipment /connectivity model • Seasonal ratings / limits • Measurement linkages • StateVariable (State Estimator) linkages • Load • Dynamic behavior models • Protection • Asset (nameplate information) linkages • Contingency definitions • Generator production/cost models • Documents or linkages to documents
EPRI Network Model Management Project Preliminary Requirements
![Page 48: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/48.jpg)
48 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Application Data – Considerations
• Where is “biblical source”? • Which non-source data is important to store? • Is there a single tool for the Network Model Management environment or is the work shared?
EPRI Network Model Management Project Preliminary Requirements
![Page 49: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/49.jpg)
49 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Tool Functionality – Model history – Projects (and subprojects) – Grouping of data – Model views – Data security / access control – One-line editing environment – CIM-based API – Model validation capability, including Load Flow – Support for derived or calculated data
EPRI Network Model Management Project Preliminary Requirements
![Page 50: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/50.jpg)
50 © 2012 Electric Power Research Institute, Inc. All rights reserved.
• Which requirements imply CIM modifications?
“The CIM isn’t the best way to do anything…. …but it is the best way to do everything.”
- Jay Britton
EPRI Network Model Management Project
![Page 51: Integrated Network Model Management Supplemental …incremental. model exchange . 2003 [CIM10] •full/incremental model exchange, messages 2004, 2005, 2006 [CIM10] •full/incremental](https://reader033.fdocuments.in/reader033/viewer/2022050608/5faf82c0b357771a895138a0/html5/thumbnails/51.jpg)
51 © 2012 Electric Power Research Institute, Inc. All rights reserved.
Comments? Questions?
Pat Brown Senior Project Manager IntelliGrid Program [email protected] (913) 449-0736