Integrated Mobile Information System for health care Peng Zhang (Lic) School of Engineering Blekinge...
-
Upload
diane-raphael -
Category
Documents
-
view
215 -
download
1
Transcript of Integrated Mobile Information System for health care Peng Zhang (Lic) School of Engineering Blekinge...
Integrated Mobile Information System for health care
Peng Zhang (Lic)
School of Engineering
Blekinge Institute of Technology
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
Project Introduction
Project financed by VINNOVA from 2003.11 to 2006-11
Budget 1,930,000 Skr (210,000 Eur).
Focused problem: Communication between careproviders and care receivers, even among all involved care providers
Suggested solution and results: A Web based and mobile integrated services that can be used by both careproviders and carereceivers to share info. and communicate.
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
IMIS Overview
IMIS Web Service
Other services providers
Patient home or outHospital
Home services
Man-materials flows
Information flows
Medical Care
Home care and serviceOther services
IMIS Ambitions
Hospital
IMIS Web Service
patient home
Home services
Other services providers
ADSL/GPRS
ADSL/GPRS
ADSL/GPRS
ADSL/GPRS
Other Services(police, relatives, shopping, taxi, etc.)
Medical care (diagnoses,treatment,etc.)
Hom
e ca
re a
nd s
ervi
ces
Medication remider
Action activated Monitor
Heart Watch
Thermometer
Visual Phone
Body guard
Alarm watch
Man, materials flows
Information flows
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
Research Model
Norms, Rules Division of Labour
Outcome
Tools
Subject
Community
Object
Activity Theory model by Engeström
The mobile part of IMIS for the field workers
Eva’s community
Eva’s working tools
Healthcare labor division
Rules, agreements in healthcare,
Eva’s private info
Eva (a field worker)Healthcare
(Eva’s) outcome
Eva’s care Receivers
Evaluation and measures
Eva’s Portable
Information system
To e-health warehouse
Communication management
Healthcare Community
E-healthwarehouse
Team’s working tools
Healthcare labor division
Rules, agreements in Healthcare,
Teams’ info.
Team leaderHealthcare
(team) outcome
Healthcare Receivers
Evaluation and measures
To field workers
The stationary part IMIS architecture for team leaders
The Total Infrastructure of IMIS
Healthcare outcome (field 2)
Portable
Information system
Healthcare outcome (field 1)
Portable
Information system
E-healthwarehouse
Team leader 1 Healthcare (team) outcome
Field 1
Field n
Field worker 2
Field worker 1
Evaluation from the field
Evaluation from the field
Other field nodes
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
User Centered Design – On line feedback participatory design
Nov. 2003- Nov. 2004 Nov. 2004- Nov. 2005 Nov. 2005-Nov.2006Main Project Tasks:
Evolutionary prototyping 1. Analysis of security,
activities, and organization. 2. Users need specification
3. IMIS Platform construction
Testing, training, evaluation 4. Users training,
5. Usability evaluation,
Project expanding 6. Product marketing, and
reports
Task 1 Analysis
Task 2 Need spec.
Task 3 IMIS Construction
Task 4 Users training
Task 5 Usability evaluation
Task 6 Marketing, reports
2 2
VINNOVA Project (Nov. 2006)IMIS Project Schedule
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
Mobile version (2005)– Login, Head menu, mail functions
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
Mobile version – tools, rules, search functions
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
Mobile version – Info. care Poviders, care receivers, and administrator
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
Some ongoing work
Analysis of the suvery result (Birgitta Hermanson)
Revised need specification (Birgitta Hermanson)
Construction of IMIS Web services (Lic. Peng Zhang)
Users’ involvement in design of IMIS
Peng Zhang
School of Engineering
Blekinge Institute of Technology
SE-371 25 Ronneby
+46 455 38 58 55
www.ipd.bth.se/pzh
Visit our research Web:
http://www.ipd.bth.se/imis/