www.pemex.com/contratos
Preliminary Disclaimer
2
The preliminary model hereby presented has been approved by the Board of Pemex E&P (PEP); however, it is subject to the approval of the Board of Pemex. PEP may call for a bidding process and, in its case, award a contract under the terms proposed in this document, once all required approvals are met as well as any other procedures required by the applicable regulatory framework.
The information made available here is property of PEP. It is presented for promotional, informational, and for reference purposes, with the objective of sharing with the energy industry and other interested parties some preliminary ideas and considerations regarding certain technical, economic, legal and/or commercial aspects of hidrocarbons production service contracts for a possible award; in addition, it may be used, in its case, to obtain feedback from industry sources or intersted parties.
The information is provided “as is” and does not imply any kind of obligation on behalf of PEP. PEP does not take responsibility regard the certainty or reliability of the information, which has been elaborated only as a reference. PEP does not guarantee that the information is exact, complete or useful; therefore, PEP will not be responsible for damages, perjury or any other loss of any nature, derived from the information contained or refered to in this document. The information contained in this document and all the refered maps, graphs, and material are only provided as illustrative sources for the convenience of the interested parties.
This information is subject to modification, at any given moment, at PEP’s sole discretion, without incurring in any responsibility as a consequence of such modifications.
The publication of this information does not constitute an commitment to call for bids nor to accept any suggestions.
www.pemex.com/contratos
Preliminary Pemex Exploration & Production
4
13 in oil reserves, a substantial position given the strong growth of the company
14 in revenues, with more than US$100 billion in sales
4 largest oil producers worldwide since 2008
3 largest exporter of oil to the United States
www.pemex.com/contratos
Preliminary First Round, August 2011
129$ 142$168$
2012$ 2013$ 2014$
§ 3 blocks: Magallanes, Santuario y Carrizo
§ 53 packages sold
§ 27 bidding companies
§ Contracts awarded to Petrofac y Schlumberger
MAGALLANES
SANTUARIO
CARRIZO
Production forecast MBD
Investment forecast Million dollars
Estimated investment of one billion dollares in the first six years
5
www.pemex.com/contratos
Preliminary Second Round, July 2012
Production forecast MBD
Blocks Company
Altamira Cheiron (Pico Petroleum)
Pánuco Petrofac and Schlumberger
Tierra Blanca Monclova Pirineos Gas and Alfasid
San Andrés Monclova Pirineos Gas and Alfasid
Arenque Petrofac
Investment forecast Million dollars
83 bidding packages sold to 31 companies
Estimated investment of 3.3 billion dollars in the first six years
6
0
20
40
60
80
100
120
2013 2017 2021 2025
0
100
200
300
400
500
600
700
800
2013 2017 2021 2025
Pánuco
San Andrés
Tierra Blanca
Altamira
Arenque
Pánuco
San Andrés Tierra Blanca
Altamira
Arenque
www.pemex.com/contratos
Preliminary Execution Strategy for Chicontepec
CIEP
8
Amatitlán
Humapa
Soledad
Miquetla
Miahuapan
Pitepec
0
100
200
300
400
500
2013 2020 2027 2034 2041 2048 2055
Production forecast MBD
CIEP
www.pemex.com/contratos
Preliminary Blocks’ Characterisitics
9
Block
Area Cummulative production 3P Reserves Prospective
resources Type of
hydrocarbon
(sq.km) (mboe) (mmboe) (mmboe) °API
Amatitlán 128 103 403 74 44
Soledad 125 40,376 134 128 32 – 37
Humapa 128 588 341 157 27
Miquetla 112 11,084 248 86 35
Miahuapan 128 43 431 101 33
Pitepec 128 94 648 74 32 - 38
§ Reserves are related to the Terciary
§ Prospective resources refer to the Mesozoic
§ The six areas show high materiality
www.pemex.com/contratos
Preliminary Main Contractual Characteristics
11
§ Hydrocarbon ownership. Pemex
§ Reseves ownership. Nation
§ Payment. Is subject to delivering production to PEP. Payments are in cash only, not in kind. Remuneration acknowledges the contractor’s costs and profits
§ Infrastructure. PEP will be the sole owner of all infrastructure; the contractor will have the rights to use all infrastructure to provide the services
§ Block. Extension or relinquishment according to existing resources
§ Term, periods, and investment. Based on the block’s economic limit
§ Work obligation. In relation to undeveloped 2P reserves
www.pemex.com/contratos
Preliminary Scope
12
§ The contractor invests, executes and delivers production
§ Work obligation is predetermined for each of the two phases; warranties for 100% of the work value
§ Payment subject to delivery of production
§ The contractor submitts a development plan, budgets, and annual programs
§ The contractor should execute all services abbiding to common and prudent industry practices
Comprises all required activites for hydrocarbon production in the block
www.pemex.com/contratos
Preliminary Governance
13
§ Steering group: integrated by two PEP membes and two company representatives
§ Revision of the development plan, work programs, and budgets
§ Participate on unitization, joint infrastructure, and other relevant issues
§ Resolution of technical and administrative differences
§ Creation of subcommittes: technical, financial procedures, subcontracting, among others
§ Resolution by unanimity
§ Possible participation of indepenent experts to support in technical differences
§ Arbitration
www.pemex.com/contratos
Preliminary
Premises of the Economic Model
§ Alignment of the contractor’s and PEP’s interests through mechanisms that provide incentives to increase production and execution efficiency
§ Positive net cash flow for Pemex each year
§ Profits based on performance; mechanisms to limit windfall profits
§ Development and use of technology for the project
§ Lessons learned from the first two rounds
§ Vision of a globally competitive model
14
www.pemex.com/contratos
Preliminary Chicontepec is a Different Kind Project
15
§ Requires constant investments
§ The production profile has high decline rate in the first months and a lower rate in the second phase
§ Practically no base production
§ Payout approximately 10 years
§ Tax regime: royalties rate as a function of oil prices (front-end loaded)
§ Possibility of increasing the recovery factor from 7 to 15%
-200
-100
0
100
200
300
400
500
1 6 11 16 21 26 31
MMdls
Year
Cash flow @ 12%
Amatitlán Soledad Payout promedio CM-RS Payout promedio CM-RN
0
5
10
15
2013 2018 2023 2028 2033 2038 2043
mmmdls Cummulative net cash flow
Capex Opex Ingresos Ingresos menos impuestos
Illustrative
Income Income minus taxes
Average payout Average payout
www.pemex.com/contratos
Preliminary Model: Key Components
16
§ Payment based on a percentage of cost recovery plus profit
§ Payment subject production delivery and limited by available income (after taxes)
§ Adjustment based on NPV/b:
§ Allows for a simple application and follow-up
§ Acknowledges the time value of money
§ Does not inhbit additional investments
§ More production or lower costs, yield greater return and investment value
§ Provides a bidding variable other than a fee per barrel
www.pemex.com/contratos
Preliminary
qt = production, barrels
Model
17
rt = adjustment factor in function of a NPV/b; Maximum value 1; or percentage neccesary to get to or maintain the maximum NPV/b
st = estimate of available income in $/b (after taxes)
Remunerationt = qt rt st
www.pemex.com/contratos
Preliminary Fiscal Regime for Chicontepec
18
Royalties
Tax based results and deductions Cost cap Additional tax Ring
fencing
Extraction: 15%
Special: 30% or 36%
if q cum > 240 mmboe
Minimum: § 36.53 dls/boe § 60% price
Additional 52%
(p - 67.45) Yes
11 14 19 28
38 47
56 66
75
0
20
40
60
80
100
50 60 70 80 90 100 110 120 130
Oil price, dollars/b
Pemex tax burden, dollars per barrel
39 46 51 52 52 53 54 54 55
Available income (variable s)
www.pemex.com/contratos
Preliminary
Note: The parameters 41.00 and 39.13 will be updated in January of each year based on the U.S. PPI.
Variable s
Available Cash Flow: s Variable
; Q ≤ 240 mmboe
; Q > 240 mmboe
Q = Cummulative production in the block starting January 1, 2011
19
st = min [39.13 + 0.059p, 0.654p]
st = min [41.00 + 0.016p, 0.642p]
20
30
40
50
50 54 58 62 66 70 74 78 82 86 90 94 98
$/b
Price USD/b
Note: This example applies only to cummulative production below 240 mmboe
p=(0.00838 ×(°API+h)+0.68)×WTS+0.1607×(°API+h)-‐7.03
°API Average weighted value of °API WTS Spot, reference price
h =
⎩⎪⎨
⎪⎧1, si °API<34
-‐1, si °API>34
0, si °API=34
�
www.pemex.com/contratos
Preliminary Variable s and r Adjustment Factor
20
sq
sqr
Cummulative cash flows @ 0% Million dollars NPV/PVq
$/b, @4%
Year
1
r adjustment factor
§ r adjustment factor = algebraic expression, which determines the monthly available income neccesary to reach or maintain the bid NPV/b
§ Considers a percentage of eligible costs, revenues, the bid NPV/b, and a discount rate
www.pemex.com/contratos
Preliminary
Tarifa = fee per barrel in present value
VPQ = present value of production (cummulative and discounted volumes)
VPE = present value of cost recovery
VPP = present value of the payments to contractor
i = monthly discount rate
r Adjustment Factor
21
Cost recovery
Years
VPEt =
Cost recoveryt = λteligible costst
λ
Cost recovery
www.pemex.com/contratos
Preliminary
§ Eligible costs: directly related to activities approved in the work programs and budgets
§ Cost recovery: a percentage of the eligible costs incurred by the contractor and approved by PEP, which are based on established accounting procedures
§ Does not include: interests, costs that exceed their market value, items not considered in the work programs, some corporate expenses, expenses related to fines, penalties, etc.
§ All transactions are subject to audits
Eligible Costs and Cost Recovery
22
www.pemex.com/contratos
Preliminary
§ Term of 35 years divided in three periods:
§ Transition. 3 months
§ Initial. 24 months for evaluation and technological solutions, with the option of 12 additional months. Investment commitment
§ Development. The work commitment is determined by the undeveloped 2P reserves
§ Extension and relinquishment of block area. Determined by potential and development plan
§ Abandonment. Obligation to abandon and fund
§ Sustainable Development. Commitmment according to defined program
§ Training of PEP employees
§ National Content. Minimum 25%
§ Warranties. Corporate (per contract) and deliverables (100% of the anual commitment)
Other Economic Terms
23
www.pemex.com/contratos
Preliminary
§ The bidder must prove experience as an operator, preferably in unconventionals* fields
§ Minimum production: 5 mbd
§ Minimum investment: 15 million dollars in E&P projects
§ HSE certification
§ Two credit ratings of the company or consortium, issued by credit agencies that are certified under the Mexico’s CNBV
Companies that appear in the Petroleum Intelligence Weekly Ranks World´s Top 50 Oil Companies are exempted from presenting documentation on production, investment, and HSE
Qualification
25
Note: investment and production requirements subject to revision
www.pemex.com/contratos
Preliminary
w = weighted fee per barrel in present value
Tarifamenor = bidding proposal that has the lowest fee per barrel in present value
Factormayor = bidding proposal that has the maximum work commitment increase factor for the initial and development periods
Where: Tarifa > 0.00 ; Factor >1.000
Award to bidder that obtains the highest index
Award
26
Índice= !w"Tarifamenor
Tarifapropuesta#+(1-w) "
Factorpropuesta
Factormayor#& ×100
www.pemex.com/contratos
Preliminary
Cummulative production
Investment
Award Example
27
wMinimum
fee
Maximum
factor
Bidding
proposal
Factor
proposedIndex
0.55 3.41 2.320 3.41 1.521 84.5
0.55 3.41 2.320 3.87 1.950 86.3
0.55 3.41 2.320 4.15 2.320 90.2
0.55 3.41 2.320 5.23 1.900 72.7
0.55 3.41 2.320 6.50 1.521 58.4
Investment
Tarifa ($/b) Illustrative Index C
Index A
Index B
Index A > Index B > Index C
Note: w is pending
C
B
A
www.pemex.com/contratos
Preliminary Preliminary Calendar
28
Oct Nov Dec Jan Feb Mar Apr May Jun Jul
Preliminary model
Bidding process
Bid and award
§ Workshops
§ Field tour
§ Q&A events
§ Qualification
The calendar is subject to approvals and modifications