INTAS Progress Report 2007 : INTAS-CERN 05-103-7555

19
INTAS Progress Report 2007 : INTAS-CERN 05-103-7555 Title : A proposal for R&D to establish the limitations on the operation of the ATLAS end-cap calorimeters at high LHC luminosity Coordinators : Peter Schacht, Sergei Denisov Start date : 8. 5. 2006 Beam runs at IHEP Protvino accelerator U-70 (protons up to 60 GeV, intensity in range 10 7 :10 12 particles/sec): November 2007 mistake with EMEC electrode design April 2008 EMEC OK, but LAr in it was frozen November 2008 problems with data acquisition and electronics November 2009 ? ...

description

INTAS Progress Report 2007 : INTAS-CERN 05-103-7555 Title : A proposal for R&D to establish the limitations on the operation of the ATLAS end-cap calorimeters at high LHC luminosity Coordinators : Peter Schacht, Sergei Denisov Start date : 8. 5. 2006. - PowerPoint PPT Presentation

Transcript of INTAS Progress Report 2007 : INTAS-CERN 05-103-7555

Page 1: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

INTAS Progress Report 2007: INTAS-CERN 05-103-7555Title: A proposal for R&D to establish the limitations

on the operation of the ATLAS end-cap calorimeters at high LHC luminosity

Coordinators: Peter Schacht, Sergei DenisovStart date: 8. 5. 2006

Beam runs at IHEP Protvino accelerator U-70 (protons up to 60 GeV, intensity in range 107:1012 particles/sec): November 2007 mistake with EMEC electrode design April 2008 EMEC OK, but LAr in it was frozen November 2008 problems with data acquisition and electronics November 2009 ? ...

Page 2: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

Energy fluxes at L=1034:η = 2.5 5.0*105 GeV/cm2/sη = 3.2 2.5*106 GeV/cm2/sη = 4.9 2.0*108 GeV/cm2/s

Main factors: ion’s mobility and recombination.Signal starts to degrade significantly above critical charge density.

In HEC and EMEC, should not exceed 5 %.In FCAL ~ 64 V at nominal of 250 V. The resistors sit on the rear HEC side.

Reducing gap size, shaping time…

“dE/dx” + ohmic heatingAdditional cooling loops in critical places, more powerful HV power supplies

Page 3: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 4: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 5: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 6: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

Radiational damage of materials, activation

β-decay of Ar41: = 6560 s

After 100 days running at L=10**34:

98 GBq in EMEC, 50 in Barrel, 11 in HEC, 1.1 in FCAl_1, 0.5 in FCAl_2,3

After 7 more days of cool-down:

9.7 GBq in EMEC, 2.1 in Barrel, 6.5 in HEC, 19 in FCAl_1, 600 (?) in FCAl_2,3

Page 7: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 8: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

Electromagnetic EC Calorimeter

Forward Calorimeters

Feedthroughs and Front-end crates

Hadronic EC Calorimeters

Presampler

ATLAS sub-detectors End-cap calorimeters integration

Page 9: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

• 3.2 < |η| < 4.9

• 106 Gy/yr, neutron flux 109 cm-2s-1

• R1=45.5 cm, r1=7.2 cm, 45 cm

• Cell size (cm2)/ number of rods: 2/4, 3.5/6, 5.6/9

• Number of rods: 12000, 10000, 8000

• λ: 2.6, 3.5, 3.4

• Mass (ton): 2.3, 4.1, 4.0

ATLAS sub-detectorsEnd-cap forward calorimeters

Page 10: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

• EM calorimeters based on “accordion” technology

ATLAS sub-detectors

Page 11: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 12: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

ATLAS sub-detectorsHEC design

Page 13: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 14: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

FCAL

EMEC

HEC

First set of iron absorbers (0.7 )

Second set of iron absorbers (1.8 )

Scintillators S4,S5,S6

Page 15: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 16: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 17: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 18: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555
Page 19: INTAS  Progress  Report 2007 : INTAS-CERN 05-103-7555

LHC schedule (L.Evans & Dec 2006 Council):

last magnet installed March 07

machine closed August 07

450 GeV (lum~1029:1030, 75 ns between bunch crossings) November 07

7 TeV August 08

Calorimeters (plan of 20 February): end of access to

ECA - end of June, Barrel A – 15 July, Barrel C and ECC – 15 August

Problems:

calorimeters - LV power supplies (BNL and CERN, modified version should

be supplied starting from April)

Inner detector - SCT and TRT - heaters problem, Pixels on retard

LHC - failure of support structure of final focus “inner triplet” superconductive quadrupoles (1 of 28, all assembled by FNAL) during pressure test 27 March