INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for...

38
TEESING SERTO TCP MOUNTING INSTRUCTION

Transcript of INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for...

Page 1: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP

MOUNTING INSTRUCTION

Page 2: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

2 | TEESING

ABOUT TEESING

TECHNICAL SUPPLIER SINCE 1952

Since 1952 Teesing is `The right connection` as the international supplier of fittings, valves, tubing, systems and assemblies for industrial applications in four sectors: pneumatics, hydraulics, instrumentation and transport of media. With offices in the Netherlands (Rijswijk), U.S.A. (New Jersey), China (Beijing) and Zhubei City (Taiwan) we are globally active in several specialized niche markets, such as semiconductor, railway, alternative fuels, pharmaceutical and (Petro)chemical industries.

We supply a complete package of products and services you require for your connection applications. Through our specialized knowledge of our products and markets we are capable in responding quickly to all your questions regarding the transport of gases and liquids to your point of use connection. Thanks to our engineering department we are also capable of delivering customized products and assemblies that are developed to meet the specifications of your critical process demands.

OUR BUSINESS UNITS

WE ENGINEER FROM SOURCE TO PROCESS

INDUSTRIAL APPLICATIONS

International supplier of fittings, valves, tubing, systems and assemblies.

SUBMICRON TECHNOLOGIES

International supplier of HP/UHP components and assem-blies from source to process.

ALTERNATIVE ENERGY

International supplier of com- ponents, systems and assem-blies for CNG/H2 projects.

© Teesing BV, November 2018. Versie 301118 All technical and other data contained in this catalogue may be subject to change without notice.

Page 3: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TABLE OF CONTENT

1. The Serto system 6

2. Why Serto TCP? 7

3. How do I recognise Serto TCP? 8

4. Individual components Serto union (exploded view) 9

5.1 Serto TCP Manual Installation 13

5.2 TCP Pneumatic pre-assembly installation 17

5.3 Checking the assembly deformation 26

6. Final assembly and remounting 29

7. Possible errors 33

8. Serto assembling tools and features 34

9. After assembling 36

10. Do you have a technical question? 37

INDEX

TEESING SERTO TCP INSTRUCTION | 3

Page 4: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

4 | TEESING

Serto Manual Pre-Assembly/ Final Assembly SS316 Union & Plastic Hose for Cleanroom use

CLICK HERE TO PLAY

Serto Final Assembly SS316 Union & SS316 Tube for Cleanroom use

CLICK HERE TO PLAY

Page 5: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 5

SertoTool Pre-Assembly / Final Assembly SS316 Union & SS316 Tube for Cleanroom use

CLICK HERE TO PLAY

SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use

CLICK HERE TO PLAY

Page 6: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

6 | TEESING

1. THE SERTO SYSTEM

• Sleek design, always one spanner size smaller than double ferrule fittings• Radial mounting enables easier maintenance thus saving time and money• Compression ferrules don’t cut into tube or hose• Pre-assembling tooling available

BASE PARTCOMPRESSION FERRULE

FLAT METAL - METAL SEAL(SEALING SURFACE 1)

LOCATION SHOULDER

UNION NUT

TUBE

FEMALE ADAPTER

Page 7: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 7

2. WHY SERTO TCP?

• Cleaned for clean room use• Special PTFE based dry lubricant • Double bagged• BUT: essential to follow mounting procedure

nBASE PART

FEMALE ADAPTER

Page 8: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

8 | TEESING

3. HOW DO I RECOGNISE SERTO TCP?

SERTO MATERIAL CODE + TCP

SERTODESCRIPTION

DOUBLE PACKEDFOR CLEANROOM

BARCODE

Page 9: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 9

4

6

4. INDIVIDUAL COMPONENTS SERTO UNION (EXPLODED VIEW)

BODY

COMPRESSION FERRULE

STIFFENER SLEEVE

NUT

Page 10: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

10 | TEESING

4. INDIVIDUAL COMPONENTS SERTO UNION (CUT-OUT)

BODY

COMPRESSION FERRULE

NUT

STIFFENER SLEEVE

Page 11: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 11

QUICK STEPS TO A SERTO CONNECTION

CHOOSE TYPE PRE-MOUNTING RE-MOUNTING

Stiffener sleevefor thin walls

and plastic tube

Manual~¼ turn

Manual~1 ¾ turn

SERTOtoolautomated

Page 12: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

12 | TEESING

4. TUBE AND STIFFENER SLEEVES

Plastic tubes: Stiffener sleeves are always required to compress the thermoplast (SERTO ferrules do not cut the tube!)

Metal tubes: Stiffener sleeves are required for thin walls, see the table below for the minimum wall thickness without stiffener sleeve

STIFFENER SLEEVEWALL THICKNESS 0,12 - 0,15MM

TUBE

Page 13: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 13

5.1. SERTO TCP MANUAL INSTALLATION

Step 1• If supplied as an assembly, don’t disassemble to avoid particle generation• Fix the assembled union properly in for example a vise• Turn nut finger tight (Thumb and index finger, no tools, no plastic deformation)

Page 14: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

14 | TEESING

5.1. SERTO MANUAL INSTALLATION

Step 2• Cut tube straight and deburr• Place tube in union until it touches the ferrule

Page 15: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 15

5.1. SERTO MANUAL INSTALLATION

Step 3• Turn nut =~ 1 ¾ till mechanical stop is reached• Use spanner on the upper 1/3 of the nut to avoid unwanted deformation

1/4 1/2 3/4 1 1 1/4 1 1/2 1 3/4 2

TORQUE INCREASE AT THEMECHANICAL STOP

Page 16: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

16 | TEESING

5.1. SERTO MANUAL INSTALLATION

Step 4 (for training purposes only)• Remove pre-assembled tube from vise and go to slide 4.3 to check the deformation

AFTER DEFORMATION

Page 17: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 17

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION FOR 4-10 MM FITTINGS

FEED LINEDELAY VALVE

DELAY VALVE

CONTACT GUARD

FORMING PIN

TOOL INSERT

BASE PLATE

PRESSURE GAUGE

Page 18: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

18 | TEESING

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

• Place the SERTOtool on a non-slip surface or bolt it to the work surface

Page 19: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 19

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

Step 1• Before each use, the tool insert (1) and the forming pin (2) must be visually inspected for damage

such as burrs and cracks• Damaged tools may cause faulty deformations and later leakage

SEALING SURFACE

TOOL INSERT

EXAMPLE OF DAMAGED PIN

Page 20: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

20 | TEESING

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

Step 2Before connecting to the pressure supply:• Set the correct dimension by rotating the tool insert (1)• This must match the type and size of the SERTO fitting

1. TOOL INSERT

Page 21: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 21

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

Step 3• Connect the SERTOtool to the compressed air 5,5 - 8 barg• The device must be disconnected from the compressed air supply in order to set a different

dimension (rotation of the tool insert)

8. FEED LINE

Page 22: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

22 | TEESING

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

Step 4• Place the ferrule and nut on the tube as shown in the image• SERTOtool is suitable for combinations of nut, ferrule and tube/hose and can be connected to any

body shape after deformation (T, L, cross, valve, etc.)

FERRULE

NUT TUBE

Page 23: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 23

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

Step 5• Put the combination of nut, ferrule and tube straight into the tool insert, up to the forming pin until

it meets the stop

Page 24: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

24 | TEESING

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

Step 6• The deformation is performed by moving the operating lever (5) towards the tube• After the needle of the gauge has stabilized, return the operating lever (5) to the starting position,

overtightening is impossible

OPERATING LEVER

Page 25: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 25

5.2. TCP PNEUMATIC PRE-ASSEMBLY INSTALLATION

Step 7• ln order to press the clamping ring correctly, the tool only opens after 2 to 4 seconds• Because this delay is necessary, the delay valve (7) must not be removed under any circumstances• After the tool has opened the assembly can be removed from the device

DELAY VALVE

Page 26: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

26 | TEESING

5.3. CHECKING THE ASSEMBLY DEFORMATION

Step 1• After the deformation is complete, a clearly visible deformation must be seen on the end of the

clamping ring, or for larger tubes an internal constriction must be visible

BEFORE DEFORMATION

AFTER DEFORMATION

Page 27: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 27

5.3. CHECKING THE ASSEMBLY DEFORMATION

Step 2• The sealing surfaces of the ferrule must not have any indentations or eccentric deformations• Check sealing surface of the ferrule for irregularities

SEALING SURFACE

Page 28: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

28 | TEESING

5.3. CHECKING THE ASSEMBLY DEFORMATION

Step 3• After deformation, no gap must be visible between the clamping ring and the end of the tube

TUBE END

TUBE END

CLAMPING RING

CLAMPING RING

Page 29: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 29

6. FINAL ASSEMBLY AND REMOUNTING

BODY

NUT AND FERRULE ASSEMBLED ON TUBE

Page 30: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

30 | TEESING

6. FINAL ASSEMBLY AND REMOUNTING

• lf a SERTO fitting is pre-assembled (with the SERTOtool), in the final assembly the nut must be tightened by hand till finger tight

• The same procedure applies for remounting

Page 31: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 31

6. FINAL ASSEMBLY AND REMOUNTING

• After tightening by hand the union needs to be tightened ~1/4 turn with a spanner

In case of two in-line fittings as shown, allow some play by following the steps per side of the fitting, not per procedure.

Eg: finger tight, ¼ turn -> finger tight, ¼ turn Not: finger tight, finger tight -> ¼ turn, ¼ turn

Page 32: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

32 | TEESING

6. AFTER ASSEMBLING

LOCATION SHOULDER(SEALING SURFACE 2)

TOUCHING OF THE CONE CAUSES MECHANICAL STOP

FLAT METAL - METAL SEAL(SEALING SURFACE 1)

Page 33: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 33

7. POSSIBLE ERRORS

• Overtightening• Undertightening• Hose/tube cutting• Scratched ferrule• Positioning ferrule• Stiffener sleeve through ferrule

Page 34: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

34 | TEESING

8. SERTO ASSEMBLING TOOLS

SERTOTOOL

Pneumatic operated tool for pre - assemblies of SERTO unions of medium and large series, in the diameter range of 4 - 10 mm.

Easiest operation without training, for economic working with reproductive compression quality. Easy to transport, instant use.

SERTOMATIC

Hydraulic operated tool for bigger diameters of 10 - 35 mm. Important time saving with reproductive compression quality of the unions.

On-the-job tool with 12V Battery pack or 230V mains.

Page 35: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 35

8. SERTO ASSEMBLY TOOLS FEATURES

Means:

Automatic crimping

Advantage:- For high volume production.- Integration of the tool in a production line- Pre - mounting in the workshop, final mounting at the plant/machine- No turning of the pipe, reducing the amount of particles generated- High rate of repeatability and reproducibility

Means:

Short assembly time

Advantage:- Time saving- High productivity- Short return on investment

Means:

High working safety

Advantage:- Approved by safety regulation- The crimping process is protected by a closed cover- No access to the tool inserts during the crimping process- Protection of employees from RSI

Page 36: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

36 | TEESING

9. AFTER ASSEMBLING

Page 37: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

TEESING SERTO TCP INSTRUCTION | 37

DO YOU HAVE A TECHNICAL QUESTION?

Please contact us for technical questions and advice

TEESING - THE NETHERLANDSVerrijn Stuartlaan 402288EL Rijswijk

Tel. +31 70 413 07 50Mail [email protected]

TEESING - CHINANo. 37 Jingsheng Nan Er Jie, Ma Ju Qiao Town, Tong Zhou District, 101102 Beijing

Tel. 010-60576210Mail [email protected]

TEESING - USA10 Millpond Drive Unit 7Lafayette, NJ 07848

Tel. +(1) 973 383 0691Mail [email protected]

TEESING - TAIWAN4F.-15, No.36, Taiyuan St., Zhubei City, Hsinchu County 302, Taiwan

Tel. 010-60576210, 010-60576220Mail [email protected]

Page 38: INSTRUCTION TCP - Teesing · 2018. 12. 3. · SertoTool Pre-Assembly SS316 Union & SS316 Tube for Cleanroom use CLICK HERE TO PLAY. 6 | TEESING 1. THE SERTO SYSTEM • Sleek design,

WWW.TEESING.COM

TEESING B.V.Verrijn Stuartlaan 40

2288 EL Rijswijk

The Netherlands

Tel +31 70 413 07 00

Fax +31 70 413 07 30

[email protected]

www.teesing.com

CHINA OFFICEHong Kong Macau Center

Suite 418

4Th Floor, Office Tower

2 Chao Yang Men Bei Da Jie

100028 Beijing, China

Tel +86 10 659 590 74

Fax +86 10 650 142 48

[email protected]

www.teesing.com.cn

USA OFFICE10 Millpond Drive Unit 7

Lafayette, NJ 07848

United States of America

Tel +1 973 383 0691

Fax +1 973 383 4672

[email protected]

www.teesing.com

TAIWAN OFFICE4F.-15, No.36, Taiyuan St.

Zhubei City

Hsinchu County 302

Taiwan

Tel +886 3 560 05 60

Fax +886 3 560 05 25

[email protected]

www.teesing.tw

Contact our sales engineers to receive detailed product information. We recommend to visit our website for regularly updated product information.