Levels of Lifecycle
Information Management.
Rogier Jongeling, PhD
CEO Plan B www.planbab.com
Technical expert, BIM Alliance
INSTALLERS´ SUMMIT20-21 September 2018, Stockholm, Sweden
2018-09-24 2
From level 0 to 3 in 5 years
Levels of information and rationalization
2018-09-24 3
Level 2
2018-09-24 4
Archive Maintenance
• Drawings• 2D- and 3D-
CAD-models• Schema
(P&IDs)• Lists• Documents
• Template (xls)• COBie (xls)• 3D-CAD (IFC, RVT)
PCS7 / ABB
5
Level 3: ”An object only occurs once”
Product Lifecycle Management
Integration with maintenance
Integration with control systems Integration
with GIS
2018-09-24 6
Level 3: Common Language is the key
Level 3: Specifications are important
2018-09-24 7
Requirements
Product data sheet
Three aspects of an object
• In accordance with ISO 12006-2, ISO/IEC 81346-1 and other parts of ISO/IEC 81346 series.
• Functional Breakdown Structure (FBS) describes the object based on what task the object has in a system. Basis for all requirement management. Prefix for FBS =
• Product Breakdown Structure (PBS) describes the occurrence of a specific product. Basis for effective procurement, spare-part management and plant traceability on instance level. Prefix for PBS -
• Location Breakdown Structure (LBS) describes the physical location of the object. Prefix for LBS +
• An object is a discrete entity that can be perceived from a functional, physical or spatial perspective.
• For example a pump: The pump has (system) requirements, is controlled by an automation system, is mounted at a specific place on a production line and there is a spare in stock.
BIM in calculation and
production.
Andreas Udd, VRA AB
INSTALLERS´ SUMMIT20-21 September 2018, Stockholm, Sweden
Cost calculation using BIM
• We use BIP
• Then we can use the BIM-model more efficient in our cost calculation programs
• We save time and get a better tender
Cost calculation usin BIM
• BIP makes it easier to use BIM models for costcalculation
• We are able to structure information• System
• Mounting
• Material
• Length, height, pieces etc.
BIP – Building information properties
• Started 2011 by BIM Alliance
• All major consulting companies are represented in the working group
• Standardizes information in BIM models
Using BIP in cost calculation
• We can calculate costs in big projects faster withBIP than with traditional methods
• Our software can read information from IFC modelswith BIP
Cost calculation with BIM saves time
• We have tested different methods for quantity takeoff in a few projects
• You can trust the quantities from the models. The difference was less than 1 percent between the methods
Using 3D object models to succeed in projects
• Biomedicum, one of Europe's largest and most modern laboratories.
• Construction start 2013
• Final inspection 2018
Using 3D object models to succeed in projects
• Very complex installations
• Budget: approximately 200.000 working hours for ventilation and plumbing
Using 3D object models to succeed in projects
• To be able to do the construction according to plans, we had to use 3D object models of the building
• The model was split per floor
• We needed fewer sections
Using 3D object models to succeed in projects
• One iPad per two workers
• The 3D model was as important as any other tools for the workers
• Most of our fittings needed no corrections
• We saved a lot of time and delivered very high quality