Installed Power Plants (as of May 31, 2020) (Including ......(Including subsidiary & tie-ups with...

2
322 Photovoltaic 119MW 14site Wind 50MW 1site Geothermal 10MW 2site Hydroelectric 2MW 1site Biomass 141MW 4site ◇SuGu Ⅰ/Ⅱ Power Plant 5,153kW Installed Power Plants (as of May 31, 2020) (Including subsidiary & tie-ups with business partners)

Transcript of Installed Power Plants (as of May 31, 2020) (Including ......(Including subsidiary & tie-ups with...

Page 1: Installed Power Plants (as of May 31, 2020) (Including ......(Including subsidiary & tie-ups with business partners) 526MW Photovoltaic1site 72MW ※ Wind 2site 92MW Biomass 7site

322

Photovoltaic ※119MW 14site

Wind 50MW 1site

Geothermal 10MW 2site Hydroelectric 2MW 1site

Biomass 141MW 4site

◇SuGu Ⅰ/Ⅱ Power Plant

5,153kW

Installed Power Plants (as of May 31, 2020)(Including subsidiary & tie-ups with business partners)

Page 2: Installed Power Plants (as of May 31, 2020) (Including ......(Including subsidiary & tie-ups with business partners) 526MW Photovoltaic1site 72MW ※ Wind 2site 92MW Biomass 7site

Representative Director & President

Yutaka Mizumachi

◇Alliance with other companies◎Project by our subsidiary

92

※panel capacity

Future Plans (as of May 31, 2020)(Including subsidiary & tie-ups with business partners)

526MW

Photovoltaic ※72MW 1site Wind 92MW 2site Biomass 362MW 7site

179 (as of May 31, 2020)

◇Soyano Wood Power Power Plant14,500kW(scheduled to start operation in Octorber 2020)

◎Shimonoseki Biomass Power Plant74,980kW(scheduled to start operation in January 2022)

◇Ishikari New Port Biomass Power Plant51,500kW(scheduled to start operation in August 2022)

Karatsu/Chinzei Wind Farm27,200kW(scheduled to start operation in Octorber 2021)

◇Nakagusuku BiomassPower Plant 49,000kW(scheduled to start operation in July 2021)

◇Hirohata Biomass Power Plant75,000kW(scheduled to start operation in August 2023)

◇Oita Biomass Power Plant22,000kW(scheduled to start operation in June 2021)

◇Kanda Biomass Power Plant74,950kW(scheduled to start operation in June 2021)

◎Kushima Wind Power Plant64,800kW(scheduled to start operation in October 2020)

◇Miya River Watarai Solar Park 71,994kW(scheduled to start operation in March 2023)