Installation of new MPR
Harald Lück
ILIAS WP1 meeting, June 14th 2005
Old MPR: T=1.35%
New MPR: T≈ 900ppm
Timeline of MPR exchange
• 02.05: Opened vacuum vessel & exchanged MPR
• 03.05: Installed attenuator. Prealigned MPR• ….spent some time with aligning• 09.05 Ifo aligned and flashing• 12.05 stable PR Michelson lock• 19.05 1hour 2f lock @ 3.5kHz• 22.05 tuned down to 1kHz
Power in PR Cavity
• Input power: 1.7W incident to MPR.
• Old MPR (1.35%) ≈ 500W ≈ 1.7 * 4/ 1.35%
• New MPR: up to 2kW (normally ~1.5kW)
• Expected PR factor >2000 ↔ 3.4kW
• Have not yet determined where we lose the power (→Stefan)
Power measurements
• Power transmitted through mirrors– MFE: 13mW/10ppm → 1.3kW– MFN: 11mW/10ppm → 1.1W
10ppm for MFN guessed to be the same as MFE
– BS AR ca. 30mW/44ppm → 1.4kW– MCN, MCE very high losses due to lens
Cavity pole measurement
Curve fit gives: 15.14 Hz +-0.15 HzSimulations with 126ppm transm. for MCE/N, 50ppm for MFE/N, and 200ppm for BS/AR.BS thermal lens set to 10k for new configurations give a pole f of 15 Hz.
Simulations
Fit pole freq: 141Hz ----------------------------------------------------------- pole freq: 18.4 Hz------------------------------------------------------------ pole freq: 15.0 Hz
Transfer function with old MPR (1.35%)
Fit gives 147Hz pole frequency
Wire attenuator, 15µm glas fibre, 0.3% attenuation/round tripNot needed with the present losses
Wire attenuator in front of MPRr
Thermal lensing in BSoutput mode pattern
Directly after relocking
f=20km
A few minutes after relocking
f= 8km
Building up the thermal lensdark port power after relocking for PR and DR Michelson
0 10 20 30 40 50 60 70 80 90 1000
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
Time (secs)
Am
pli
tud
e (V
)
DR MIDVIS
PR MIDV
IS
Increasing ROC heater powerdual recycled lock, 1kHz detuned
0 0.5 1 1.5 2 2.5 33
3.5
4
4.5
Time (Hours)
Am
pli
tud
e (V
-rm
s)
SPOTPOS:MCE:SUMfs = 1 : 2005-06-01 10:59:47
0 0.5 1 1.5 2 2.5 32.5
3
3.5
4
Time (Hours)
Am
pli
tud
e (V
-rm
s) SPOTPOS:MCN:SUMfs = 1 : 2005-06-01 10:59:47
0 0.5 1 1.5 2 2.5 3
-4
-3.5
-3
Time (Hours)
Am
pli
tud
e (V
-rm
s)
SPOTPOS:MFE:SUMfs = 1 : 2005-06-01 10:59:47
0 0.5 1 1.5 2 2.5 3-4
-3.5
-3
-2.5
Time (Hours)
Am
pli
tud
e (V
-rm
s)
SPOTPOS:MFN:SUMfs = 1 : 2005-06-01 10:59:47
0.5 1 1.5 2 2.51.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
Time (Hours)
Am
pli
tud
e (V
-rm
s)
AAMI:SCAN:DENOMfs = 1 : 2005-06-01 10:59:47Dark port power
PR cavity power
75W 80W 85W 90W 98W